Loading...
HomeMy WebLinkAbout2291-11U s~ H tT f.: a� m -r-I as w a 0 U U a� a M U a m N -r-I w U 0 L0 w,r +J U Ia a, x a� ro U -4 1~ O .. N C) t� r -i C) N Ln N r --t O N O M b C r -i a N r --I ro U >4 U (1) .--I w I w Is b i L0 00 W i h w x C] to i ter 0 b ro U a s4 0 b a� a� a I urrc+T , ,mimes w) z w X�cDERMOTT -WEST PARK SOUTH HERITAGE CIRCLE I i H I VICINITY MAP N.T.S. EX. SCE VAULT NO. V5309809 PROTECTIVE BARRIER FOR UNDERGROUND DISTRIBUTION STRUCTURES �j BARRIERS BARRIERS I P OR II Wn� vEN T-~ -�- I 4'-6' 24' I MIN. T MIN. MAX ISEE I NOTE 7 PLAN MAX POLE OR VENT PLAN EQUIPMENT FOUNDATION T A BARRIER %MrOL ' TO BE ONE OF THE FOLLOWNQ 1) C GALV. STEEL PIPE (1/4' MIN. WALL) FILLED WITH CONCRETE 2) RAILROAD RAIL (90 LB. MIN.). or 51 14 75 30' AMERICAN S. BEAM (5' x1/27 3) B•x8" REINF. CONCRETE 4 SPECIAL BARRIERS BY PRIOR S.C.E. CO. APPROVAL BARRIER DETAIL NOTES: 1. Structures will normally be Installed only In man -traffic areae Barriers to be used rhes construction has exposed equipment to ttafflc. 2. Top of barriers to be smooth cut and top edges to be rounded 3. One barb to be removable when overhead obstacles prevent equipment removal by crane 4. Adequate clearance must be prodded for doors6 cooling cola. eta 5. Barricadea. = shown, Indicate typkxg rsqulrements. Field conditions will necessitate changes far adequate equipment protection. Approval In the field tarn the underground Inspector N required for all barricade Instalatlons 6. When specified on working drawling, a 6' (minimum height) sub may be Installed in place of barrisa This curb must be at least 6' thick and its front face located 60' minimum (or = specilled an drawing) from the equipment foundation 7. Increase to 44' minimum at front of podmounted 30 transformers and capacitors, and 36" minimum at back of capacitors (door ekfe only when a 72' x 94' pad to being Installed. REF. UGS 830 UTA.6 DETAIL Barrier Post Detail, - EX. 1-5" C.O. STUB OUT FROM SCE. =. VERIFY EXACT LOCATION Underground Service Alert 0 = c Call: TOLL FREE 1-800 422-4133 TWO WORKING DAYS BEFORE YV�_u3 72" x 94" PAD 2O 120V, CIRCUIT C, 15. FOR SURFACE MOUNTED TRANSFORMER O4 1 1/2" C. 3 #6 + 2 #8 (CIR. 38) + 1 #8 G. (30 - 75 THRU 500 kVA) + 1 #8 G (277V) + 1 #10 G (120V). (SWITCH AND FUSE) SERVICE CONDUITS #8 G (277V) + 1 110 G (120V). O 120V OUTLET ON POLE PER DETAIL 'F',-SHT. E-5-3. PRIMARY CONDUITS MUST 13E IN THIS #8G (277V) + 1 110 G (120V). MUST BE IN SECTION (MAX 4) 102"C.6#6+2#8(38)+1 #8 G. THIS SECTION AS FAR TO THE RIGHT 122"C.9#6+2#8(38)+2#10(C.15)+1 #8G \ AS POSSIBLE 72' 132"C.9#6+2#8(38)+1 #8 G.- PRIM SEC UN (SZI 94_,'.,3/4- C. 2 #10 + 1 #12 G (HA, 36). 15 2.;.;�-; 4" C.O. (SECONDARY). 1 Lyfi" 18' 16 :Q.O. (PRIMARY). 13' 17 "PULL -'.j YPE-"2X' PER DETAIL 'E', SHT. ES -3. DOOR SIDE OF TRANSFORMER 22• PUL> --- BOX - YPE-. -3X' PER DETAIL 'E', SHT. ES -3. SIDE OR BACK OF PAD TO BE MINIMUM 3' FROM CLEARANCE REQUIRED IN 0' ADJACENT BUILDING SURFACE FRONT OF TRANSFORMER MAY BE 2' IF BUILDING FOR OPERATION. SURFACE IS NONCOMBUSTIBLE. PLAN FINISH GRADE 6- o/.d o /: o /.d a e. i> /. ELEV. 0 PLACE PAD ON 6' ��� of 3/4' CRUSHED FLOOR OF WIRE Roc* 6' MIN. TRENCH as � a as UTIL5 DETAIL a 5/1' x 6' 12/0 MIN. B.C. GROUND WARE COPPERCLAD STEEL SECURE TO RODS MATH GROUND ROD EDISON APPROVED 2 REQUIRED GROUND CLAMPS *:ROUNDING MATERIALS FURNISHED REF ESR 254 AND INSTALLED BY CONTRACTOR. US 170 RISER BENDS UGS 5001 PADMOUNT REQ. VERIFY NTH SCE UGS 504 EXACT TYPE AND USG 701 GROUND RODS USG 703 INSTALLATION REQUIRES 6' X 8' Transformer Pad N.T.S. N.T.S. FIXTURE HEAD 200 HPS HADCO R54GBNN DARK BRONZE FINISH 12 -0" POLE: HADCO 2590 (BRONZE FINISH) i HANDHOLE WITH TAMPER PROOF SCREWS (ROSETTE HEADS.) BOLT COVER (SCREW DOWN TYPE) ONCRETE FOUNDATION 2000LBS ® 28 DAYS ,r "SAND BLAST" FINISH 30.. FINISH GRADE 42'I .•. -I 1 CONDUTT(S) 24" BELOW GRADE. ALL RISERS AND 90 BENDS =III, �.;..:• SHALL BE PVC COATED RGS. ,... ,t ANCHOR BOLTS BY MANUFACTURER -#4 VERT. BARS "24 f 1 DIA 0 34 (MAX!) O.C. VERTCAL R T TOP ANDS 12 ® 8" O.C. 18" DIA. AT 8"O.C. AND 3" FROM ALL WITH 12" LAP. SIDES. PROVIDE STD 90' HOOKS AT TOP OF VERT. BARS. Fixture XA Detail A N.T.S. w,y+ 40' 0' 40' 80' 120' GRAPHIC SCALE 1"=40' POWER AND TELEPHONE UTILITY GENERAL NOTES A. UTILITY POINTS OF SERVICE AND WORK / MATERIAL SHOWN ARE BASED ON PRELIMINARY INFORMATION ONLY BY THE UTILITY COMPANIES AND ARE ,FOR BID PURPOSES ONLY. B. LOCATIONS OF UTILITIES SHOWN ARE APPROXIMATE AND CONTRACTOR SHALL EXERCISE EXTREME CAUTION IN EXCAVATING AND TRENCHING ON THIS SITE TO AVOID EXISTING DUCTS, PIPING OR CONDUITS, ETC., AND TO PREVENT HAZARD TO PERSONNEL AND/OR DAMAGE TO EXISTING UNDERGROUND UTILITIES OR STRUCTURES WHETHER OR NOT SHOWN AND INSTALLED BY 'ANY OTHER CONTRACTS. THE ENGINEER IS NOT RESPONSIBLE FOR THE LOCATION UNDERGROUND UTILITIES OR STRUCTURES WHETHER OR NOT SHOWN OR DETAILED AND INSTALLED BY ANY OTHER CONTRACTS. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER SHOULD SUCH UNIDENTIFIED CONDITIONS BE DISCOVERED. THESE DRAWINGS AND SPECIFICATIONS DO NOT INCLUDE THE NECESSARY ELEMENTS FOR CONSTRUCTION SAFETY. C. CONTRACTOR SHALL COORDINATE WITH UTILITY COMPANY FOR FINAL AND EXACT WORK / MATERIAL REQUIREMENTS AND CONSTRUCT TO UTILITY COMPANY ENGINEERING PLANS AND SPECIFICATIONS ONLY. CONTRACTOR SHALL FURNISH AND INSTALL ALL CONDUIT, PULL WIRES, CABLES, PULLBOXES, CONCRETE ENCASEMENT OF CONDUIT (IF REQUIRED), TRANSFORMER PAD, BARRIERS, POLE RISERS, TRENCHING, BACKFILL, PAY ALL UTILITY COMPANY FEES AND INCLUDE ALL REQUIREMENTS IN SCOPE OF WORK. D. CALL "UNDERGROUND ALERT" BEFORE YOU DIG: _ SOUTHERN CALIFORNIA 1-800-422-4133 E. UTILITY CO. CONTACTS: SCE: MR. FRAN STEWART 909 357-6223 IMPORTANT S.C.G. NOTICE: SOUTHERN CALIFORNIA GAS COMPANY REQUIRES SAFETY CONSIDERATIONS TO THE GAS PIPELINES DURING CONSTRUCTION PHASES. A REPRESENTATIVE OF THE GAS COMPANY MUST OBSERVE THE EXCAVATION AROUND OR NEAR THE PIPELINE ' FACILITIES, TO INSURE THEIR PROTECTION AND TO RECORD PERTINENT DATA NECESSARY FOR THEIR OPERATIONS. NO MECHANICAL EQUIPMENT WILL BE PERMITTED TO OPERATE WITHIN THREE FEET OF THE PIPELINES, AND ANY CLOSER WORK MUST BE DONE BY HAND. THE CONTRACTOR SHALL MAKE ARRANGEMENTS FOR GAS COMPANY OBSERVATION BY CALLING (714) 634-3199, AT LEAST TWO WORKING DAYS PRIOR TO THE START OF CONSTRUCTION. PLAN NOTES E-1 Oil CIRCUIT A, 38 - TYPICAL ALL AREA LIGHTS. 2O 120V, CIRCUIT C, 15. O3 120V, CIRCUIT C. 17. O4 1 1/2" C. 3 #6 + 2 #8 (CIR. 38) + 1 #8 G. O5 1 1/2" C. 6 #6 + 2 #8 (38) + 2 110 (C. 13) + 1 #8 G (277V) + 1 #10 G (120V). O1 1/2"C.6#6+2#8(38)+2#10(C, 15)+1 #8 G (277V) + 1 110 G (120V). O 120V OUTLET ON POLE PER DETAIL 'F',-SHT. E-5-3. O8 2"C.9#6+2#8(38)+2#10(C.13)+ 1 #8G (277V) + 1 110 G (120V). O1 1/2" C. 6 #6 + 2 #8 (CIR. 38) + 1 #8 G. 102"C.6#6+2#8(38)+1 #8 G. 11 1 1/2" C. 6 #6 + 2 #8 (38) + 1 #8 G. 122"C.9#6+2#8(38)+2#10(C.15)+1 #8G (277V) + 1 J1 0 G (120V). 132"C.9#6+2#8(38)+1 #8 G.- 94_,'.,3/4- C. 2 #10 + 1 #12 G (HA, 36). 15 2.;.;�-; 4" C.O. (SECONDARY). Lyfi" 16 :Q.O. (PRIMARY). 17 "PULL -'.j YPE-"2X' PER DETAIL 'E', SHT. ES -3. PUL> --- BOX - YPE-. -3X' PER DETAIL 'E', SHT. ES -3. fig PUJLL BOX TYPE" -1. I XPER DETAIL 'E', SHT. ES -3. 20 PROVIDE DRIVEN... GROUND. ROD FOR POLES S1, S2, S3, 21 1" Cil 1 ` D`=` OPPtR.* N llZ#.3/4",,_C2-"1,•...#1>0 + 1 #1 O:` G T0. C '13 15. Yl, es�.� CAL r - ENGINEER' ' 4L j4o� EE 7029 _� . ��9F�p . 913oo�t•�\�, �F CIF CA�1F�� X14. 2Z ?1 SyC Er A0. Il o r zo