HomeMy WebLinkAbout2290-2Conditions of Approval - March 8, 1993 N 4) Design Review #92-41/Conditional Use Permit #92-17 Conditions of Approval - March 8, 1993 Page 6 - Design Review #92-41/Conditional Use Permit #92-17 _ .. Page 4 31. Automatic fire sprinkler systems shall be installed in all new U construction per Fontana City Ordinance No. 841. Design and type 15. Provide and record a reciprocal use agreement to assure common of system shall be based upon the requirements of the Uniform Q ingress and egress and joint maintenance of all common access, Building Code, Uniform Fire Code and the requirements of the parking areas, drives and drainage acceptance. Division of Fire protection, Planning & Engineering of the San O Bernardino County Fire Agency. 16. The project shall be served by the City's sanitary sewer system w and all sewer facilities -shall be constructed in accordance with 32. Permits are required prior to the removal and/or demolition of the Sanitary Sewer Master Plan and as approved by the' City structures. Engineer. (Projects located outside of the City will be required 3 to execute an Annexation Agreement with the City). 33. The requirements of the Department of Environmental Health C) N Services and the Air Quality Management District shall be 17. All plan check fees shall be paid with the first complete -� satisfied prior to the issuance of any permit if hazardous submittal for plan checking. Final determination of all plan materials are stored and/or used. U check fees will be made prior to issuance of permits and must be paid in full before permits are issued. 34. Any temporary building, trailer, commercial coach, etc. installed and/or used in connection with a construction project shall comply 18. Participate in the desired City-wide landscaping and/or lighting with Fontana City Ordinance No. 1007. C_ district by executing the annexation document. Additionally, a y C C map showing all of the project lighting and landscape maintenance 35. All perimeter/boundary walls shall be designed and constructed so- V) areas and dimensions must be submitted. Applicant shall prepare that, the outer/exterior face of the wall is as close as possible ►=-i l and submit all related Engineer's Reports. to the property line. In any case, the outer/exterior face of the e^. u N Z wall shall be within two (2) inches of the property line. 19. A landscape plan and installation schedule, in accordance with Z U z H City Guidelines and Specifications for all areas between any curb 36. All new industrial and commercial development, including 0 and right of way line or perimeter wall shall be submitted to and multi -family development in commercial zones, with roofs or parts approved by the City. The plans shall show that safe sight -� thereof that are not flat, with a minimum slope of 3:12, shall be woaoEiwEi distance standards are met and indicate topographical information, required to have concrete, or clay tile, or metal roofs which are plant species, sizes and locations, and also show the related architecturally compatible with the building. irrigation system/controls and water meter service points. 37. The following items shall be completed and/or submitted to the 20. All permits required in order to accomplish planned construction Building 6 Safety Division --as applicable --prior to the issuance - must be obtained prior to constructing new or joining existing of any building permits for this project: <ar<HHw E4W1-1()aH_ improvements. A. Precise grading plans shall be approved. 21. Pay all applicable service and impact fees pursuant to the Fontana B. Rough grading completed Municipal Code. C. Compaction certification D. Pad elevation certification 22. Access to any phased construction site shall be restricted by a E. Rough grade inspection signed off by a Hx<z temporary installation of a chain-link fence with locks to City Building Inspector restrict public access, but allowing emergency vehicle access as EiaaCI W zz per City acceptable arrangements. -• 38. Grading Requirements: aaN 23. Owner/Developer shall submit to the State Water Resources Control A. All drainage water shall drain via approved methods, to H H - 0 0 3 z a a >4 Board a Notice of Intent (NOI) to comply with the terms of the an approved location --public street, public drainage General Construction Activity Storm Water Permit to discharge system, etc. storm water associated with construction activity which includes clearing, grading or excavation that results in the disturbance of B. Drainage water shall not cross over a public sidewalk. at least five acres of total land area. Construction activity on _ Drainage water may however, cross under a side walk if 44 > W sites of less than five acres requires a permit if the an approved drainage structure is -used. construction is part of a larger common plan of development or 171OH HRi(4'0.iWLT4 sale. Owner/Developer shall submit to the City a copy of the C. No water course or natural drainage shall be obstructed. State's Approved General Permit issued for this project. Conditions of Approval - March 8, 1993 Conditions of Approval - March 8, 1993 Design Review #92-41/Conditional Use Permit #92-17 Design Review #92-41/Conditional Use Permit #92-17 Page 7 Page 5 -' D. Minimum slope or grade for ALL drainage structures shall PRIOR TO ISSUANCE OF OCCUPANCY PERMITS be one half (0.50) percent for concrete and one (1.0) percent for all other. 24. The applicant shall fully construct public improvements per approved plans, the City Standards and Specifications, and the E. Drainage water shall not pass from an 'improved' type of satisfaction of the City Engineer. drainagestructure to an 'unimproved' type of drainage X11 U0 En0U) •0< HNZWOZZn structure. (ie; concrete swale to slag or dirt swale.) 25. The applicant PP shall provide "copies of record" of the completed ` J 3cnaoW public improvement construction plans for the entire project. F. A complete hydrology study using the latest edition of the San Bernardino County Flood Control Hydrology 26. Provide a certificate from the engineer of record attesting to the Manual, and complete hydraulic calculations justifying „ completion of finish grading, in accordance with the City approved the size, slope, capacity, etc. of any and all drainage grading plan. structures being utilized, shall be submitted to, and ImZEn EiaaW approved by the Building & Safety.Division. 27. Provide locations and identification numbers of all City paid 04 H Z Z O W H M utility meters in the public right-of-way. -� The on-site drainage system shall, as a minimum, be 0 - WOzaOZ) designed to handle the run-off generated by a ten (10) 28. The applicant shall fully construct landscape improvements onsite year, ten (10) minute storm. Check for flooding of all wxEaavlawo and offsite per approved plans, the City Standards and on-site structures (buildings) and all adjacent Specifications, and shall obtain the City Inspector's final properties during a hundred (100) year storm. inspection sign -off after verification of safe sight distance standards are met. Landscape improvements shall also include G. The grading plans shall, as a minimum, contain sections completion of landscape elements within and abutting lettered lots at all property lines and/or permit boundary lines. dedicated for open spaces as well as landscape easements. These sections shall clearly indicate: 29. Owner/Developer shall submit to the City a copy of the Notice of 1. the relationship between the proposed finished Completion approved by the State Water Resource Control Board for on-site grade elevations and the existing adjacent the project's cancellation of its General Construction Activity property grade elevations, (Indicate any additional Storm Water Permit. drainage water that may come from an adjacent property.); and BUILDING AND SAFETY (ALSO SEE GENERAL REQUIREMENTS): 2. the ground cover/finished surface material being . proposed, (ie: type of pavement, plant material, 30. Shall comply with the latest ado p ted edition of the following etc.); and codes: 3. all proposed drainage structures; and A. Uniform Building Code and its appendices and standards. 4. any proposed and/or required walls or fencing. B. Uniform Plumbing Code and its appendices and standards. POLICE (ALSO SEE GENERAL REQUIREMENTS): C. Uniform Mechanical Code and its appendices and standards. 39. Applicant shall comply with City of Fontana Police Building and Security specifications. D. Uniform Building Security Code. -• E. National Electrical Code. - FIRE (ALSO SEE GENERAL REQUIREME?tTS)• F. Title 24, California Code of Regulations. No Comments G. Uniform Fire Code and its appendices and standards. END OF CONDITIONS Ir Conditions of Approval - March 8, 1993 Design Review #92-41/Conditional Use Permit #92-17 Page 2 LANDSCAPE (ALSO SEE GENERAL REQUIREMENTS): 7. All landscape and irrigation plans shall comply to the City of Fontana Standard Specifications. 8. Landscape and irrigation plans shall comply with West End Specific Plan. 9. All landscape and irrigation designs shall incorporate drought tolerant plant materials and water efficient irrigation systems. 10. The following plans require approval from Landscape Development, Planning Division, prior to issuance of a building permit. Submit 2 copies for review. 2 Landscape construction plan and details 2 Irrigation plan and details 2 Planting plan and details ENGINEERING (ALSO SEE GENERAL REQUIREMENTS)• 9. Prior to the issuance of the grading permit, the project proponent is to provide the City with copies of the recorded grant deeds/easement deeds for the area within MWD corridor, SCE corridor, flood control channel and SCG. PRIOR TO ISSUANCE OF CONSTRUCTION PERMITS/BUILDING PERMITS 10. If the development is located in an area indicated by the National Flood Insurance Program as subject to flooding, the project site shall be subject to the provisions of said program. 11. Prepare and submit a final hydrology and hydraulic study showing the tributary area, layout of storm drains and downstream impacts to a point as defined by the closest receiving point on a master storm drain line or existing facility as approved by the City Engineer. The study shall identify off-site and on-site runoff impacts resulting from build -out of permitted General Plan uses, the project's contribution, locations and sizes of catchments and system connection points plus all downstream drainage mitigation measures. All mitigation/recommendations resulting from the final approved study shall be included in the improvement design submittals. 12. Applicant shall mitigate the upstream and downstream ultimate developed off-site. and/or on-site ultimate developed drainage impacts either by: DELETED A (1-6) AT PC 3-8-93 Conditions of Approval - March 8, 1993 Design Review #92-41/Conditional Use Permit #92-17 Page 3 A. Dedication and construction of an on-site/ or off-site detention basin and related facilities. (1) The length, width and depth to be determined by the completion of a final hydrology/hydraulic study and any proposed tentative tract lot restrictions. The length and width of the proposed basin shall be shown on the final tract map submitted for plan checking. (2) Applicant shall post securities for the basin and_ related facilities construction cost, basin maintenance cost for a 25 year period, the cost to refill, the basin and dispose of any related facilities when no longer needed, as well as regrade the site to a condition suitable for further land use. Applicant shall post securities for the construction of the ultimate storm drain connection to the Master Planned Storm Drain Facilities when operational. (3) Applicant shall execute a 'Declaration of Dedication' Agreement covering the establishment of a flood regulation basin to detain and regulate storm water runoff. (4) Said basin shall be subject to design review and approval by both City staff and Planning Commission. (5) Applicant shall provide a disclosure notice to any purchaser of subdivided or developable land of the requirement to dedicate and construct said detention basin and related facilities and agreements. (6) Applicant shall dedicate at this time, any drainage easements necessary for the placement of the ultimate storm drain pipes and facilities, if necessary, for disposing of the detention basin. DELETED A (1-6) AT PC ON 3-8-93 13. Prepare and submit a final grading plan showing- building footprints, pad elevations, finishing grades, drainage routes, drainage acceptance approvals, retaining walls/non-retaining walls and elevations, erosion control, slope easements and other pertinent information in accordance with Chapter 70 of the U.B.C. NOTE: A report on the disposition of trees and shrubs in accordance with Chapter 30 of the Fontana Municipal Code may be required by the Planning Division. 14. All drainage easements necessary to accommodate the final approved grading and drainage plan shall be offered for dedication but maintained by the applicant until all public improvements are completed and accepted for operation and maintenance. • 1 v i • IN. - e � City of Fontana C A L I F O R N I A March 10, 1993 City of Fontana - - t Agency Attention: Belinda 8353 Sierra Avenue Fontana, California 92335 Re: Design Review #92-41 and Conditional Use Permit #92-17 Gentlemen: The above referenced projects were approved at the City of Fontana Planning Commission meeting held on March 8, 1993 for development of McDermott West Park and installation of landscape and walkway improvements within a portion of the Southern California Gas/Metropolitan Water District easements in the Village Heritage/West Village area. The action of. the Planning Commission shall not be final for a period of ten (10) days following the approval hearing to allow the filing of appeals with the City Clerk of the City of Fontana. Under the provisions of Municipal Code Sections 33-165 (k) and 33-142.9 your approval shall become null and void two years after the date of approval. Therefore, your Design Review and Conditional Use Permit shall expire on March 8, 1995. By this date you must see that 'The appropriate permits have been obtained and construction commenced, defined as permits obtainment, commencement of construction of the primary building(s) on site and successful completion of the first Building and Safety Division inspection thereof..." (Section 33-165 (k)(1)) for your Design Review to remain valid. Additionally, by this date the land use approved under your Conditional Use Permit must have commenced. Please be aware that the Code of the City of Fontana does not permit Time Extensions for Design Reviews or Conditional Use Permits approved after April 18, 1991. If you have any questions regarding this action, please contact Brad Weekley, the Staff Planner who worked on your proposal at (714) 350-7625. Sincerely yours, COMMUNITY DEVELOPMENT DEPARTMENT PLArNG DIVI§, ON / Paul Balbach Deputy Planning Manager Enclosure cc: Building b. Safety 8353 SIERRA AVENUE (P.O. BOX 518) a FONTANA. CALIFORNIA 92334-0518 • (71 4) 350-7600 SISTER CITY- KAMLOOPS, B.C. CANADA CONDITIONS OF APPROVAL CASE: Design Review #92-41 Date: March 8, 1993 Conditional Use Permit #92-17 PROJECT: Development of McDermott West Park and installation of landscape and walkway improvements within a portion of the Southern California Gas/Metropolitan Water District easement in the Village of Heritage/West Village Area. GENERAL REQUIRENENTS: 1. Prior to the construction of any modifications, all structural and aesthetic changes to the project design must be requested and approved in writing by a Case Planner, Nanager of Planning and the Community. Development Director. All minor changes to approved construction plans must be required and approved as above with the additional authorization from the City Engineer, Manager of Building and Safety and Public Morks Director. Major structural and aesthetic changes exceeding the codified parameters of administrative policy shall be presented to the Planning Commission for approval. Changes made without approval as stated herein, will prevent the issuance of a Certificate of Occupancy until corrections are approved in writing by all appropriate staff. 2. The conditions of approval shall be incorporated into all applicable final construction plans and a copy of these conditions of approval shall be placed onto the first sheet of the final building plans prior to issuance of building permits. PLANNING (ALSO SEE GENERAL REQUIREMENTS): 3. Conditional Use Permit #92-17 shall expire March 8, 1994 unless building permits have been issued and construction has commenced on the primary building(s). Commencement of construction is defined as obtainment of one successful Building Division inspection of the primary building(s). 4 Design Review #92-41 shall expire March 8, 1995 unless building permits have been issued and construction has commenced on the primary building(s). Commencement of construction is defined as obtainment of one successful Building Division inspection of the primary building(s). 5. Development shall be consistent with standards and requirements of the West End Specific Plan. 6. The applicant shall file an Amendment to the West End Specific Plan to allow for the modifications proposed to the Open Space Concept Plan and the text of Section IV. Said application shall be filed within 60 days of the approval of this project, and building permits for this Design Review and Conditional Use Permit project shall not be issued until the Specific Plan Amendment is approved and adopted. DELETED AT PC 3-8-93 © RECORD DRAWING w 4 L4 U` cc I i � ■ b a DRAWING NO. 2 2 9o SHEET NO. 2 OF 23 N 4) Z Cd Q Q -U U vOi C0 Q o Z 0 o O 'fl � ._.. w ) �+ Q > - J 3 0 C) N LL 6. O U 0 U u 4J U ,C C_ Z y C C 3 " LU V) 0o z Z C, ►=-i l e 00 O e^. u N Z DRAWING NO. 2 2 9o SHEET NO. 2 OF 23 W J Q Q U 0 C0 CC 0 CL Q Q J LL CC O 0 Z cc: LU 0 0o z Z U z H U U 0 wZ°au� w z woaoEiwEi O Lu HCzaHU1 - _ U <ar<HHw E4W1-1()aH_ J_ Uj owaw�aa)cnwzowa M Hx<z -, EiaaCI W zz aaN H H - 0 0 3 z a a >4 ~ � W H 0 QHEIZWIM • 44 > W 171OH HRi(4'0.iWLT4 xWE-►O�,H E-4 >zw aw ZWOwa> ooauar< CQ ZEA04H °zw X11 U0 En0U) •0< HNZWOZZn ` J 3cnaoW �44Z�w[HU)= m „ o0<0IXU E-4 o ImZEn EiaaW :. 04 H Z Z O W H M 0 - WOzaOZ) i wxEaavlawo s S xP0a,H0ZE4 o • DRAWING NO. 2 2 9o SHEET NO. 2 OF 23