Loading...
HomeMy WebLinkAbout3958-7I I 701- m AP 0) M mm REVISION DESCRIPTION BASIS OF BEARING THE CALIFORNIA COORDINATE SYSTEM OF im (ccs -w), ZONE 5. EPOCH 1992.W, BETWEEN SAN BERNARDINO COUNTY SURVEYOR'S GPS STATIONS 21128 AND 212ag. BEING GRID AzimLrrH OF 103'45'29. . .. ........... GRID VALUES WERE HELD FOR ALL POINTS, HOLDING SAN BERNARDINO COUNTY GPS POINT 2112a As THE POINT OF ORIGIN. ALL POINTS WERE THEN ROTATED TO HOLD THE GRID AZIMUTH BASIS DIAL �TWO WORKING BENCHMARK BEFORE IL DAYS BEFORE NATIONAL GEODETIC VERTICAL DATUM OF 1929 (NGVD-29) WED ON U SAN BERNARDINO DIG YOU DIG COUNTY GPS POINT 21129 FOR VERTICAL COMMOL, ELEVATION = 1,319.333 AND VERIFIED TO MATCH SAN BERNARDINO COUNTY BENCHMARK 473 (ELEV. 1275.152) PER CITY OF FONTANA CIVIC CENTER PARK - PHASE 1. X rtw DECOM 101 W. SIXTH STRUT, SUITE WO, ONTARIO, CA. 91762 PHONE: (909) 933-52�5 FAX: (909) 933-5228 Prepared Under The Supervision Of : I M111 �� m EO) CONSTRUCT PCC PAD PER DETAIL ON S 26. PROTECT IN PLACE REMOVE EXISTING CONCRETE, ACI FM ,I AND OTHER DISPOSABLE MATERIALS NOT SUITABLE TO REMAIN WITHIN PROJECT LIMITS AT VARIOUS LOCATIONS. CURVE DATA TANGENT (FT) 4500.00P ------------ 1 2 .1? •" � � w,.. .,�j.-.<, .,, a DE� TlS' lie ! � ,n, ., ddd „'^-. ..,�.r.. _... $.._,.,—.. ...... ........ ....... ..,,,,z .,.�_,.. . . . . . . . . . . . F E �t _a�,r n_�. .,. 5 � If � f t S � � ,�5p}:. ,�. ,..,nr r«.�.�,» , «,-d.,,, .: ..,p.n ,,,,...m..r.,.,..:,-,.. .,..,�„ ,.. j -,.n...¢.., �-,<,. ...-..,,.,.<.n ., ...., ,.%`«.<.,..,..._ _4 . ... . ...... I t2f Q, 4 - CD - ?l 00 . C4 00 + C-4 cq J + CD 00 CSI -4- F4 :OFILE"! GAI)t — _J .... ... ...... -4- . . ..... .. .. 4--z- •NG�-"- •O 00. N D _4 o fa + . . . • ....... .......... . 4-- f . . . . . . . r ... ... .... -4 i t}� i � Y � ( ; i i 3 .._.,-,. ,. ..,5,,, „dam,.. -,... ,,._,{<,. S ..�„ .n. .,,, $ PROF0LE SCALE HORIZONTAL 1 20' tT VD i 9 VERTICAL 1 4 inrnmn gn7+nn qna.Lnn zho-on REVISION DESCRIPTION BASIS OF BEARING THE CALIFORNIA COORDINATE SYSTEM OF im (ccs -w), ZONE 5. EPOCH 1992.W, BETWEEN SAN BERNARDINO COUNTY SURVEYOR'S GPS STATIONS 21128 AND 212ag. BEING GRID AzimLrrH OF 103'45'29. . .. ........... GRID VALUES WERE HELD FOR ALL POINTS, HOLDING SAN BERNARDINO COUNTY GPS POINT 2112a As THE POINT OF ORIGIN. ALL POINTS WERE THEN ROTATED TO HOLD THE GRID AZIMUTH BASIS DIAL �TWO WORKING BENCHMARK BEFORE IL DAYS BEFORE NATIONAL GEODETIC VERTICAL DATUM OF 1929 (NGVD-29) WED ON U SAN BERNARDINO DIG YOU DIG COUNTY GPS POINT 21129 FOR VERTICAL COMMOL, ELEVATION = 1,319.333 AND VERIFIED TO MATCH SAN BERNARDINO COUNTY BENCHMARK 473 (ELEV. 1275.152) PER CITY OF FONTANA CIVIC CENTER PARK - PHASE 1. X rtw DECOM 101 W. SIXTH STRUT, SUITE WO, ONTARIO, CA. 91762 PHONE: (909) 933-52�5 FAX: (909) 933-5228 Prepared Under The Supervision Of : I M111 �� m EO) CONSTRUCT PCC PAD PER DETAIL ON S 26. PROTECT IN PLACE REMOVE EXISTING CONCRETE, ACI FM ,I AND OTHER DISPOSABLE MATERIALS NOT SUITABLE TO REMAIN WITHIN PROJECT LIMITS AT VARIOUS LOCATIONS. CURVE DATA TANGENT (FT) 4500.00P ------------ 1 2 .1? DE� REVISION DESCRIPTION BASIS OF BEARING THE CALIFORNIA COORDINATE SYSTEM OF im (ccs -w), ZONE 5. EPOCH 1992.W, BETWEEN SAN BERNARDINO COUNTY SURVEYOR'S GPS STATIONS 21128 AND 212ag. BEING GRID AzimLrrH OF 103'45'29. . .. ........... GRID VALUES WERE HELD FOR ALL POINTS, HOLDING SAN BERNARDINO COUNTY GPS POINT 2112a As THE POINT OF ORIGIN. ALL POINTS WERE THEN ROTATED TO HOLD THE GRID AZIMUTH BASIS DIAL �TWO WORKING BENCHMARK BEFORE IL DAYS BEFORE NATIONAL GEODETIC VERTICAL DATUM OF 1929 (NGVD-29) WED ON U SAN BERNARDINO DIG YOU DIG COUNTY GPS POINT 21129 FOR VERTICAL COMMOL, ELEVATION = 1,319.333 AND VERIFIED TO MATCH SAN BERNARDINO COUNTY BENCHMARK 473 (ELEV. 1275.152) PER CITY OF FONTANA CIVIC CENTER PARK - PHASE 1. X rtw DECOM 101 W. SIXTH STRUT, SUITE WO, ONTARIO, CA. 91762 PHONE: (909) 933-52�5 FAX: (909) 933-5228 Prepared Under The Supervision Of : I M111 �� m EO) CONSTRUCT PCC PAD PER DETAIL ON S 26. PROTECT IN PLACE REMOVE EXISTING CONCRETE, ACI FM ,I AND OTHER DISPOSABLE MATERIALS NOT SUITABLE TO REMAIN WITHIN PROJECT LIMITS AT VARIOUS LOCATIONS. CURVE DATA TANGENT (FT) 4500.00P ------------