Loading...
HomeMy WebLinkAbout5641-10 & CommunityFacilities District Tract 77767 LANDSCAPE CONSTRUCTION PLANS South East Corner Citrus Avenue & Mallory Drive Fontana, CA 92335 Total CFD Landscape Area: 4,483 Sq. Fte t — —-------- iii• -- -- I 1 I 1 I 1 1 1 I I 1 1 1 LOT 3 2420 Elev. "A" LOT 1 2420 Elev. "A" LOT 2 2420 Elev. "B" I I 1 � i LOT 4 i � 2117 Elev. "B" i i 1� i �1 1 1 DICiA_ SECTION REQUIRES DI OF THE GOVERNMENT '"�1+,'I I'�` CODE REQUIRES A DIG ALERT IDENTIFICATION NUMBER BE ISSUED BEFORE A PERMIT TO EXCAVATE WILL BE VALID _ - FOR YOUR DIG ALERT I.D. NUMBER CALL Underground Service Alert of Southern California TOLL FREE 1-800-227-2600 AT LEAST TWO DAYS BEFORE YOU DIG 6" CONCRETE MOW STRIP AT LIMIT OF PROJECT LOT 5 2420 Elev. "C" All Work to Meet or Exceed State & Local Codes and Industry Standards. Written Dimensions to Precede Scaled Dimensions. SOIL MANAGEMENT PLAN REQUIREMENTS: CONTRACTOR SHALL OBTAIN SOILS TESTS COVERING ALL PLANTING AREAS AFTER COMPLETION OF FINISH GRADING AND PRIOR TO START OF SOIL PREPARATION WORK TESTS SHALL BE PERFORMED BY AN APPROVED CALIFORNIA AGRONOMIC SOILS TESTING LABORATORY AND SHALL INCLUDE A FERTILITY AND SUITABILITY ANALYSIS WITH WRITTEN RECOMMENDATIONS FOR SOIL PREPARATION AND PLANTING BACKFILL MIX. THE AMENDMENTS IN THESE SPECIFICATIONS ARE THE MINIMUM REQUIREMENT AND ARE FOR BID PURPOSES. ALL SOILS CONDITIONING AND AMENDMENTS SHALL BE PER THE FINAL SOIL REPORT RECOMMENDATIONS THE MINIMUM AMENDMENT AND FERTILIZER APPLICATION RATES SPECIFIED HEREIN ONLY WHEN THEY EXCEED THE SPECIFIED MINIMUMS. THE PROJECT APPLICANT, OR HIS/HER DESIGNEE, SHALL COMPLY WITH THE FOLLOWING: THE SOIL MANAGEMENT REPORT SHALL BE SUBMITTED TO THE CITY AS PART OF THE CERTIFICATE OF COMPLETION PRIOR TO THE CERTIFICATE OF OCCUPANCY. MALLORY DRIVE UNDERGROUND UTILITIES: The Contractor shall be responsible for locating or verifying locations of all existing utilities, and for protection of same. Damages resulting from Contractor's work or that of Contractor's sub -contractors shall be restored to original condition at their own expense. City shall have the final say if repairs are to be made by Contractor or others. 1 1 I 1 1 1 I 1 I 1 1 THE SOIL MANAGEMENT REPORT SHALL BE MADE AVAILABLE TO THE CITY LANDSCAPE INSPECTOR OR INSPECTOR DESIGNATED BY THE CITY ENGINEER, AND TO THE LANDSCAPE CONTRACTOR PRIOR TO THE INSTALLATION OF ANY PLANT MATERIAL. THE PROJECT APPLICANT, OR HIS/HER DESIGNEE, SHALL HAVE AN INSPECTION BY A CITY LANDSCAPE INSPECTOR OR INSPECTOR DESIGNATED BY THE CITY ENGINEER, VERIFYING IMPLEMENTATION OF SOIL MANAGEMENT REPORT RECOMMENDATIONS. EXISTING SFR NOT A PART APN: 0251-012-11 EXISTING GARAGE LOT 6 / 2420 Elev. "A" LOT 7 2117 Elev. "A" SS A �slafeP 29' N01h SITE VICINITY MAP I not to scale NORTH CITY OF FONTANA REQUIRED NOTES: INSPECTION: 1. R IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE ENGINEERING DIVISION'S LANDSCAPE INSPECTOR 48 HOURS PRIOR TO DESIRED INSPECTION OF AN ITEM (909) 350-6632. 2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT THE FOLLOWING INSPECTIONS ARE REQUIRED: PRE -CONSTRUCTION INSPECTION INSPECTION OF IRRIGATION SYSTEM IN OPEN TRENCH CONDITION (PRIOR TO BACKFILL). MAINLINE PRESSURE TEST AT 150 PSI FOR A THREE (3) HOUR, CONTINUOUS PERIOD. IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND FINAL TESTS. FINISH GRADE PRIOR TO PLANTING. PLANT MATERIALS PRIOR TO PLANTING AND SOIL PREPARATION. PLANTING INCLUDING STREET TREES. CONTACT THE PARKS PLANNING AND LANDSCAPE DEVELOPMENT SECTION, ENGINEERING DIVISION, FOR SPECIES AND FINAL LOCATIONS. COMPLIANCE WITH APPROVED PLANS. FINAL INSPECTION. 3. THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL BE PRESENT AT THE EACH INSPECTION. I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE WATER EFFICIENT LANDSCAPE ORDIANCE AND SUBMIT A COMPLETE LANDSCAPE DOCUMENTATION PACKAGE. SIGN DATE 6/5/2017 Sheetindex Title Sheet L-1 Irrigation Plan L-2 Planting Plan San Bernardino Ave. Irrigation Details LA Planting Details L-5 Irrigation Specifications L-6 Planting C Specifications C Tullock St. A L-7 A L3 an r y r y o di Q u 2 1= A N ` M eV m r Of Tullo k St. 7- i V CL A E C r u r >= O rte. ca ) t� LU H U. U n Mallory Drive m Hallo Drive E Rosemary Dr. m Lo L c m 3 a ¢ u J Tullock St. Valle Blvd. U 10 VICINITY MAP I not to scale NORTH CITY OF FONTANA REQUIRED NOTES: INSPECTION: 1. R IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE ENGINEERING DIVISION'S LANDSCAPE INSPECTOR 48 HOURS PRIOR TO DESIRED INSPECTION OF AN ITEM (909) 350-6632. 2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT THE FOLLOWING INSPECTIONS ARE REQUIRED: PRE -CONSTRUCTION INSPECTION INSPECTION OF IRRIGATION SYSTEM IN OPEN TRENCH CONDITION (PRIOR TO BACKFILL). MAINLINE PRESSURE TEST AT 150 PSI FOR A THREE (3) HOUR, CONTINUOUS PERIOD. IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND FINAL TESTS. FINISH GRADE PRIOR TO PLANTING. PLANT MATERIALS PRIOR TO PLANTING AND SOIL PREPARATION. PLANTING INCLUDING STREET TREES. CONTACT THE PARKS PLANNING AND LANDSCAPE DEVELOPMENT SECTION, ENGINEERING DIVISION, FOR SPECIES AND FINAL LOCATIONS. COMPLIANCE WITH APPROVED PLANS. FINAL INSPECTION. 3. THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL BE PRESENT AT THE EACH INSPECTION. I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE WATER EFFICIENT LANDSCAPE ORDIANCE AND SUBMIT A COMPLETE LANDSCAPE DOCUMENTATION PACKAGE. SIGN DATE 6/5/2017 Sheetindex Title Sheet L-1 Irrigation Plan L-2 Planting Plan L-3 Irrigation Details LA Planting Details L-5 Irrigation Specifications L-6 Planting C Specifications C L6 A L-7 R IC H A R D DOD[ Landscape Architecture Urban Design & Planning 181 N.'E' Sheet, San aemor3no, CA 92401 phone: 190918885568 fax 1909138x9854 e -mai: rpa.bQrver'ean.net Richard Pope, Landscape Architect CA# 2664 Expiration Date: 2/28/2018 Owner/Applicant: ANDRESEN ARCHITECTURE, INC. 17087 Orange Way Fontana, CA 92335 (909) 355-6688 Contact: Bethanie Gougeon Sheet Description: Title Sheet Date: CD RP*A Job No.: 16-04 Drawn by: ca Revisions: CITY PAVING 4/18/2017 C C L6 A A L3 an r y r y o di Q u 2 1= A N ` M eV O. r Of 7- i V CL A C r u r >= O rte. ca ) t� LU H U. J Sheet Description: Title Sheet Date: April 26, 2016 RP*A Job No.: 16-04 Drawn by: LKD CKE Revisions: CITY PAVING 4/18/2017 Sheet: L-1 Of: 7