HomeMy WebLinkAbout5641-10 &
CommunityFacilities District
Tract 77767
LANDSCAPE CONSTRUCTION PLANS
South East Corner
Citrus Avenue & Mallory Drive
Fontana, CA 92335
Total CFD Landscape Area: 4,483 Sq. Fte
t
— —--------
iii• -- --
I
1
I
1
I
1
1
1
I
I
1
1
1
LOT 3
2420 Elev. "A"
LOT 1
2420 Elev. "A"
LOT 2
2420 Elev. "B"
I
I
1 �
i LOT 4
i
� 2117 Elev. "B"
i
i
1�
i
�1
1
1
DICiA_ SECTION REQUIRES
DI OF THE GOVERNMENT
'"�1+,'I I'�` CODE REQUIRES A DIG ALERT IDENTIFICATION
NUMBER BE ISSUED BEFORE A PERMIT TO
EXCAVATE WILL BE VALID
_ - FOR YOUR DIG ALERT I.D. NUMBER CALL
Underground Service Alert of Southern California
TOLL FREE 1-800-227-2600
AT LEAST TWO DAYS BEFORE YOU DIG
6" CONCRETE MOW STRIP
AT LIMIT OF PROJECT
LOT 5
2420 Elev. "C"
All Work to Meet or Exceed State & Local Codes and Industry Standards.
Written Dimensions to Precede Scaled Dimensions.
SOIL MANAGEMENT PLAN REQUIREMENTS:
CONTRACTOR SHALL OBTAIN SOILS TESTS COVERING ALL PLANTING AREAS AFTER
COMPLETION OF FINISH GRADING AND PRIOR TO START OF SOIL PREPARATION WORK
TESTS SHALL BE PERFORMED BY AN APPROVED CALIFORNIA AGRONOMIC SOILS
TESTING LABORATORY AND SHALL INCLUDE A FERTILITY AND SUITABILITY ANALYSIS
WITH WRITTEN RECOMMENDATIONS FOR SOIL PREPARATION AND PLANTING BACKFILL
MIX. THE AMENDMENTS IN THESE SPECIFICATIONS ARE THE MINIMUM REQUIREMENT
AND ARE FOR BID PURPOSES. ALL SOILS CONDITIONING AND AMENDMENTS SHALL BE
PER THE FINAL SOIL REPORT RECOMMENDATIONS THE MINIMUM AMENDMENT AND
FERTILIZER APPLICATION RATES SPECIFIED HEREIN ONLY WHEN THEY EXCEED THE
SPECIFIED MINIMUMS.
THE PROJECT APPLICANT, OR HIS/HER DESIGNEE, SHALL COMPLY WITH THE
FOLLOWING:
THE SOIL MANAGEMENT REPORT SHALL BE SUBMITTED TO THE CITY AS PART OF THE
CERTIFICATE OF COMPLETION PRIOR TO THE CERTIFICATE OF OCCUPANCY.
MALLORY DRIVE
UNDERGROUND UTILITIES:
The Contractor shall be responsible for locating or verifying locations of all existing utilities, and for protection of
same. Damages resulting from Contractor's work or that of Contractor's sub -contractors shall be restored to original
condition at their own expense. City shall have the final say if repairs are to be made by Contractor or others.
1
1
I
1
1
1
I
1
I
1
1
THE SOIL MANAGEMENT REPORT SHALL BE MADE AVAILABLE TO THE CITY LANDSCAPE
INSPECTOR OR INSPECTOR DESIGNATED BY THE CITY ENGINEER, AND TO THE
LANDSCAPE CONTRACTOR PRIOR TO THE INSTALLATION OF ANY PLANT MATERIAL.
THE PROJECT APPLICANT, OR HIS/HER DESIGNEE, SHALL HAVE AN INSPECTION BY A
CITY LANDSCAPE INSPECTOR OR INSPECTOR DESIGNATED BY THE CITY ENGINEER,
VERIFYING IMPLEMENTATION OF SOIL MANAGEMENT REPORT RECOMMENDATIONS.
EXISTING SFR
NOT A PART
APN: 0251-012-11
EXISTING
GARAGE
LOT 6 /
2420 Elev. "A"
LOT 7
2117 Elev. "A"
SS A
�slafeP 29' N01h
SITE
VICINITY MAP I
not to scale NORTH
CITY OF FONTANA REQUIRED NOTES:
INSPECTION:
1. R IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE ENGINEERING DIVISION'S
LANDSCAPE INSPECTOR 48 HOURS PRIOR TO DESIRED INSPECTION OF AN ITEM (909) 350-6632.
2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT
THE FOLLOWING INSPECTIONS ARE REQUIRED:
PRE -CONSTRUCTION INSPECTION
INSPECTION OF IRRIGATION SYSTEM IN OPEN TRENCH CONDITION (PRIOR TO BACKFILL).
MAINLINE PRESSURE TEST AT 150 PSI FOR A THREE (3) HOUR, CONTINUOUS PERIOD.
IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND FINAL TESTS.
FINISH GRADE PRIOR TO PLANTING.
PLANT MATERIALS PRIOR TO PLANTING AND SOIL PREPARATION.
PLANTING INCLUDING STREET TREES. CONTACT THE PARKS PLANNING
AND LANDSCAPE DEVELOPMENT SECTION, ENGINEERING DIVISION, FOR
SPECIES AND FINAL LOCATIONS.
COMPLIANCE WITH APPROVED PLANS.
FINAL INSPECTION.
3. THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL BE PRESENT AT
THE EACH INSPECTION.
I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE WATER EFFICIENT LANDSCAPE ORDIANCE AND
SUBMIT A COMPLETE LANDSCAPE DOCUMENTATION PACKAGE.
SIGN DATE
6/5/2017
Sheetindex
Title Sheet
L-1
Irrigation Plan
L-2
Planting Plan
San Bernardino Ave.
Irrigation Details
LA
Planting Details
L-5
Irrigation Specifications
L-6
Planting
C
Specifications
C
Tullock St.
A
L-7
A
L3
an
r
y
r
y
o
di
Q
u 2
1=
A
N
`
M
eV
m
r
Of
Tullo k St.
7-
i
V
CL
A
E
C
r
u r
>=
O
rte.
ca
)
t�
LU
H
U.
U
n
Mallory Drive
m
Hallo
Drive
E
Rosemary Dr.
m
Lo
L
c m
3
a
¢
u J
Tullock
St.
Valle Blvd. U
10
VICINITY MAP I
not to scale NORTH
CITY OF FONTANA REQUIRED NOTES:
INSPECTION:
1. R IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE ENGINEERING DIVISION'S
LANDSCAPE INSPECTOR 48 HOURS PRIOR TO DESIRED INSPECTION OF AN ITEM (909) 350-6632.
2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT
THE FOLLOWING INSPECTIONS ARE REQUIRED:
PRE -CONSTRUCTION INSPECTION
INSPECTION OF IRRIGATION SYSTEM IN OPEN TRENCH CONDITION (PRIOR TO BACKFILL).
MAINLINE PRESSURE TEST AT 150 PSI FOR A THREE (3) HOUR, CONTINUOUS PERIOD.
IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND FINAL TESTS.
FINISH GRADE PRIOR TO PLANTING.
PLANT MATERIALS PRIOR TO PLANTING AND SOIL PREPARATION.
PLANTING INCLUDING STREET TREES. CONTACT THE PARKS PLANNING
AND LANDSCAPE DEVELOPMENT SECTION, ENGINEERING DIVISION, FOR
SPECIES AND FINAL LOCATIONS.
COMPLIANCE WITH APPROVED PLANS.
FINAL INSPECTION.
3. THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL BE PRESENT AT
THE EACH INSPECTION.
I AGREE TO COMPLY WITH THE REQUIREMENTS OF THE WATER EFFICIENT LANDSCAPE ORDIANCE AND
SUBMIT A COMPLETE LANDSCAPE DOCUMENTATION PACKAGE.
SIGN DATE
6/5/2017
Sheetindex
Title Sheet
L-1
Irrigation Plan
L-2
Planting Plan
L-3
Irrigation Details
LA
Planting Details
L-5
Irrigation Specifications
L-6
Planting
C
Specifications
C
L6
A
L-7
R IC H A R D
DOD[
Landscape Architecture
Urban Design & Planning
181 N.'E' Sheet, San aemor3no, CA 92401
phone: 190918885568
fax 1909138x9854
e -mai: rpa.bQrver'ean.net
Richard Pope, Landscape Architect CA# 2664
Expiration Date: 2/28/2018
Owner/Applicant:
ANDRESEN ARCHITECTURE, INC.
17087 Orange Way
Fontana, CA 92335
(909) 355-6688
Contact: Bethanie Gougeon
Sheet Description:
Title Sheet
Date:
CD
RP*A Job No.:
16-04
Drawn by:
ca
Revisions:
CITY PAVING 4/18/2017
C
C
L6
A
A
L3
an
r
y
r
y
o
di
Q
u 2
1=
A
N
`
M
eV
O.
r
Of
7-
i
V
CL
A
C
r
u r
>=
O
rte.
ca
)
t�
LU
H
U.
J
Sheet Description:
Title Sheet
Date:
April 26, 2016
RP*A Job No.:
16-04
Drawn by:
LKD CKE
Revisions:
CITY PAVING 4/18/2017
Sheet:
L-1
Of: 7