Loading...
HomeMy WebLinkAbout5445REF-55z z u� yl W � J U W U � w w 02 a z 68 67 66 65 64 63 62 61 60 59 58 57 56 55 54 53 52 51 50 49 48 47 46 45 44 43 42 41 40 39 38 37 36 35 34 33 32 31 30 29 28 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 90990—A 40 AMP CROSSING CONTROLLER — TEMPERATURE COMPENSATED LLRREMN U METER 90983 LAMP MODULE GREEN 90983 LAMP MODULE GREEN 90984 LOGIC MODULE BLUE 400022 400022 ST ST 91073 RECTIFER Q� FLASHERS 0� FLASHERS Or XING CONTROL RELAY RELAY LOGIC FUSE TEST B SB P QQ INTERGRATED rr rr OJ GATE POWER SYSTEM 40 r LOWER r POWER SYSTEM CONTROL O CONTROL 0 RAISE ri VITAL TEST TEST RELAY DRIVE UPPER 8AY LOWER BAY 91075—TC 40 AMP CROSSING CONTROLLER — TEMPERATURE COMPENSATED 91074 91073 RECTIFER REGULATOR 91073 RECTIFER 91078 INTERGRATED MANUAL INTERGRATED 91074 91078 9107 POWER SYSTEM 40 r LOWER r POWER SYSTEM 0 RAISE STATUS LOWER BAY LOWER RAISE SAN BAG DIC�� DIAL •BEFOREU DIG ��r; TOLL FREE � 1-800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT REV. I REVISION DESCRIPTION ISSUED FDR BI 08-31-2016 DATE I ENGR. I CITY I DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH STANDARDS IN EFFECT. 1 FOOT 1 2 3 4 5 6 7 8 9 10 11 RED = IN YELLOW = OUT 3CA0 PREPARED UNDER THE SUPERVISION OF: c=PACIFIC RAILWAY ENTERPRISES, INC. ATDate JENNIFER PURCELL, P.E. 4-11 CASE INDEX NO: RS -53 CITY OF FONTANA, CALIFORNIA GRADE CROSSING PEDESTRIAN IMPROVEMENT PROJECT DRAWN BY: SCALE: R. TORRES SIERRA AVE. - SG 49.10 AS SHOWN DESIGNED BY: CA OUT A OF 19 DATE: J. POSTIER 08/31/16 CHECKED BY: APP Y: DRAWING NO.: 51 J. PURCELL it rrarinirro orr li�o '-71 /7 5445