HomeMy WebLinkAbout5445REF-16SUPPORTING ARM
JiUNCTION BOX
POWER
SOURCE
U OD I m
1BX1
1CX
SP -20-2A
W. C. MODEL 3593
L it
CONT ON
SH.2
SG 048.90
GATE ARM
TIP LAMP A
6 L -BELL 6
7 7
TU REV.
/C7,�—GjaT —
OSAN6AG DIAMMM.,,M WORKING
BEFOREYOU DIGTOLLFREE00
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
BY COMPETENT AUTHORITY.
'ER' CIRCUIT JUMPERS SHOWN IN
HEAVY LINES TO BE ADDED BY FIELD FORCES.
INTERNAL LIGHTING AND MOTOR CIRCUITS
TO BE 09-10 OTHER CIRCUITS •14-16.
REVISION DESCRIPTION
ISSUED FOR BI
08-31-2016
I DATE I ENGR. I CITY I DATE I
SHOULD CONSTRUCTION OF THE REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN TWO
YEARS OF THE DATE OF APPROVAL SHOWN HEREON
AND CARRIED FORTH IN A DILIGENT MANNER, THE
CITY ENGINEER MAY REQUIRE REVISIONS TO THE
PLANS TO BRING THEM INTO CONFORMANCE WITH
STANDARDS IN EFFECT.
7 COND
°6 U.G.
7 COND
"14 U.G.
�
u1�
1
c
��nl
RNE
2
3
LE
RE
3
GDPL
2 1
RB
4
GDPR
5
RN
5
A
6
4
LB
GRADE CROSSING
4
PROJECT
7
5
LN
5
4 3
JUNIPER AVE. - SG 48.90
GATE CIRCUIT PLAN
SH OF 17
SCALE:
AS SHOWN
Q
«0.e,�a *
��` s
0f CAL%'
ENTERPRISES, INC.
Date N�2`l
DESIGNED BY:
J. POSTIER
6 L -BELL 6
7 7
TU REV.
/C7,�—GjaT —
OSAN6AG DIAMMM.,,M WORKING
BEFOREYOU DIGTOLLFREE00
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
BY COMPETENT AUTHORITY.
'ER' CIRCUIT JUMPERS SHOWN IN
HEAVY LINES TO BE ADDED BY FIELD FORCES.
INTERNAL LIGHTING AND MOTOR CIRCUITS
TO BE 09-10 OTHER CIRCUITS •14-16.
REVISION DESCRIPTION
ISSUED FOR BI
08-31-2016
I DATE I ENGR. I CITY I DATE I
SHOULD CONSTRUCTION OF THE REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN TWO
YEARS OF THE DATE OF APPROVAL SHOWN HEREON
AND CARRIED FORTH IN A DILIGENT MANNER, THE
CITY ENGINEER MAY REQUIRE REVISIONS TO THE
PLANS TO BRING THEM INTO CONFORMANCE WITH
STANDARDS IN EFFECT.
7 COND
°6 U.G.
7 COND
"14 U.G.
1
RXE
1
R -MOTOR -UP
2
RNE
2
RER1
3
RE
3
ER
4
RB
4
GDPR
5
RN
5
6
R -BELL
6
GRADE CROSSING
7
PROJECT
7
GB
TBI -4
LB
RB B
T[33-7E
R 6S N
LN 370 AH
SEE
SG 48-50
SH. 2
❑ - DATA RECORDER CO
GATE ARM
AGATE
LAMP
TBl-2
RECTIFER
PANEL
SUPPORTING ARM
JUNCTION BOX
--------- —I
I
I
W. C.
MODEL 3593
B C3 4
A ° ° A R
RED = IN
YELLOW = OUT
1 2
G'X8' XING
HOUSE INDEX
NO: RS -15
F E88'0N4�
PREPARED UNDER THE SUPERVISION OF:
CITY OF
FO NTANA, CALIFORNIA
p0
GRADE CROSSING
PEDESTRIAN IMPROVEMENT
PROJECT
E" ` °°* Fy
`e
PACIFIC RAILWAY
DRAWN BY:
R. TORRES
JUNIPER AVE. - SG 48.90
GATE CIRCUIT PLAN
SH OF 17
SCALE:
AS SHOWN
Q
«0.e,�a *
��` s
0f CAL%'
ENTERPRISES, INC.
Date N�2`l
DESIGNED BY:
J. POSTIER
DATE:
08/31/16
CHECKED BY:
PURCELL
PPRO
Iry FNCINFFR r ` 511F9 �` / /
DRAWING NO.:
5445
1E
IX
JENNIFER PURCELL, P.E.J.