Loading...
HomeMy WebLinkAbout5445-3r a 0 c� 0 0 4 0 ev 0 c a a, U) 0 E CL .E Q m z 0 0 0 W 0 c 0 e� 0 E s M .c 0 0 c c W c a u 0 a z 0 2 0 c C. J 0 0 2a -s i 0 0 H 0 u 2 W, 0 rn n J2 vd V* aip 6 IL ® W � J W z w F Ld �Ld o__j U cr d Z CITY OF FONTANA GENERAL NOTES FOR SIGNING AND STRIPING PLANS 1. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA DEPARTMENT OF ENGINEERING PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITH IN THE CITY LIMITS. CALL (909) 350-7610. 2, ALL WORK, MATERIALS, EQUIPMENT AND TEMPORARY TRAFFIC CONTROL SHALL CONFORM TO THESE PLANS, THE CITY OF FONTANA STANDARD SPECIFICATIONS, THE CITY'S SPECIAL PROVISIONS, SECTION E, THE STANDARD PLANS AND SPECIFICATIONS OF THE STATE OF CALIFORNIA, DATED 2015, AND THE CALIFORNIA MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES, DATED 2014, 3. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN TEMPORARY TRAFFIC CONTROL AT ALL TIMES, 4, ALL SIGNS SHALL BE INSTALLED PER CITY STANDARD DETAIL 4003, UNLESS OTHERWISE SHOWN ON THE PLANS, 5. ALL STRIPING AND PAVEMENT MARKINGS SHALL BE ALKYD THERMOPLASTIC UNLESS OTHERWISE NOTED. 6. SUBSTITUTE TYPE "C" RAISED PAVEMENT MARKERS FOR TYPE "G" MARKERS ON DETAIL 38 ON ROADWAYS WITH RAISED MEDIANS. 7. SUBSTITUTE DETAIL 14A STRIPING FOR DETAIL 12 STRIPING FOR ROADWAYS WITH RAISED MEDIANS, 8. STRIPING AND PAVEMENT MARKINGS TO BE REMOVED SHALL BE REMOVED BY SANDBLASTING OR OTHER APPROVED METHODS, NONE OF WHICH SHALL DAMAGE THE PAVEMENT. THE 'BLACK OUT' METHOD OF REMOVAL IS NOT PERMITTED, ANY PAVEMENT DAMAGED BY REMOVALS SHALL BE REPAIRED PER APPROVAL OF THE CITY ENGINEER AT NO COST TO THE CITY. 9, CONTROL POINTS OR "CAT TRACKING" SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO APPLICATION OF PAVEMENT STRIPING AND LEGENDS. NOTIFY THE CITY AT LEAST TWO DAYS PRIOR FOR APPROVAL OF "CAT TRACKING," 12, THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION, CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS. 13. CURVE DATA REFERS TO THE FACE OF CURB. 14, STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED. 15, ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION. 16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCHMARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER, 17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCHMARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT, 18, THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES, A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES. 20. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES PER HOUR, 10, STRIPING AND PAVEMENT MARKINGS SHALL BE APPLIED IN ACCORDANCE WITH MANUFACTURERS SPECIFICATIONS, 21. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED 11. BLUE RAISED PAVEMENT MARKERS SHALL BE INSTALLED AT ALL FIRE HYDRANT LOCATIONS PER CITY STANDARD PLANS. ON TO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL. 12, AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS AND ELECTRONIC AUTOCAD FILES TO THE CITY ENGINEER. CIT`}' OF FONTANA GENERAL NOTES FOR STREET IMPROVEMENT PLANS 1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED, 2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION, 3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610, 5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 6, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. 8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA .TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT. 9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT-OF-WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE. 10. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO, THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION. 11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES. Governments 01 R� T el DIAL TWO WORKING BEFORE DAYS BEFORE YOU DIG YOU DIG TOLL FREE 1-800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT 22. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR. 23, A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION, FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED, 24. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODABLE SWALES ENTERING OR LEAVING IMPROVEMENTS. 25, THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE TIME OF CONSTRUCTION AND SHALL CONFORM TO THE CITY OF FONTANA STANDARD DETAILS, 26, ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE, 27. THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER LATERAL, 28. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED. 29, ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS. 30. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT. 31, PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF THE CITY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING. 32, ACTUAL THICKNESS OF A.C. PAVEMENT AND/ OR BASE COURSE MATERIAL FOR STRUCTURAL STREET SECTIONS SHALL BE RECOMMENDED BY A GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH GRADING, 33 ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING. 34 UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER, 35 CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER. 36 AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER. REV, I REVISION DESCRIPTION ISSUED FOR BID 08-31-2016 AS -BUILT NAME: aseYMiYashita COMPANY: ` JD B, Inc. SIGNATURE:- =— DATE: 5/4/18 DATE I ENGR, I CITY I DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH STANDARDS IN EFFECT, CITY OF FONTANA GENERAL NOTES FOR TRAFFIC SIGNAL PLANS 1. ALL WORK, MATERIALS, EQUIPMENT AND TEMPORARY TRAFFIC CONTROL SHALL CONFORM TO THESE PLANS, THE CITY OF FONTANA STANDARD SPECIFICATIONS, THE CITY'S SPECIAL PROVISIONS, SECTION E, THE STANDARD PLANS AND SPECIFICATIONS OF THE STATE OF CALIFORNIA, DATED 2010, AND THE CALIFORNIA MANUAL OF TRAFFIC CONTROL DEVICES, DATED 2014, 2, ALL REQUIRED CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA ENGINEERING DIVISION PRIOR TO COMMENCENT OF WORK. 3. CONTRACTOR SHALL FURNISH ALL EQUIPMENT, MATERIALS, AND HARDWARE TO CONSTRUCT THE TRAFFIC SIGNAL AND LIGHTING AS SHOWN ON THE PLANS, EXCEPT ANY CITY FURNISHED OR PROVIDED AS NOTED IN SECTION E, 4. LOCATION OF ALL UNDERGROUND FACILITITES ARE APPROXIMATE. CONTRACTOR SHALL BE RESPONSIBLE FOR THE LOCATION AND PROTECTION OF ALL EXISTING FACILITIES WITHIN THE AREA OF CONSTRUCTION. THE CITY ENGINEER SHALL BE NOTIFIED OF ANY DISCREPENCIES OR CONFLICTS PRIOR TO COMMENCING WORK. CONTRACTOR SHALL RELOCATE AND/OR REPLACE ANY LANDSCAPING OR SPRINKLERS AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER. 5, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING SURVEY MONUMENTS OR MARKERS DURING CONSTRUCTION. 6. ALL PULLBOXES SHALL BE Na. 6 AND CONDUIT SHALL BE 3" RIGID METAL UNLESS OTHERWISE SHOWN. 7, ALL VEHICLE INDICATIONS SHALL BE 12" AND HAVE L.E.D. SIGNAL MODULES. ALL PEDESTRIAN HEADS SHALL HAVE L.E.D. PEDESTRIAN MODULES & UTILIZE PEDESTRAIN COUNTDOWN TIMERS PER SPECIAL PROVISIONS, 8, ANY EXISTING TRAFFIC SIGNALS AND LIGHTING SHALL REMAIN IN OPERATION UNTIL REPLACED WITH NEW CONSTRUCTION. 9. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT EQUIPMENT LOCATIONS PRIOR TO FINAL PLACEMENT. SEE DETAIL THIS SHEET AND SECTION E. 10. CONTROLLER AND SERVICE CABINETS SHALL NOT BE SUBJECTED TO WATER FROM SPRINKLERS. CONTRACTOR SHALL MODIFY SPRINKLERS SYSTEMS AS NECESSARY. 11, CONTRACTOR SHALL INSTALL CITY -SUPPLIED REINFORCING CABLES AND ASSOCIATED HARDWARE (2 PER SIGN) ON OVERHEAD REFLECTIVE STREET NAME SIGNS IN ACCORDANCE WITH CITY DESIGN STANDARD 4005, 12, THE CONTRACTOR SHALL REPAIR/REPLACE ANY AND ALL DAMAGED LANDSCAPING, IRRIGATION, SIDEWALK, PAVEMENT OR ROADWAY STRIPING TO THE SATISFACTION OF THE ENGINEER, 13, CONTRACTOR SHALL REFER TO THE CITY ENGINEER IN THE EVENT OF A CONFLICT OR POTENTIAL CONFLICT WITH THESE PLANS AND, OR SPECIFICATIONS FOR THIS PROJECT. 14, ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION ON OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION, 15, THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER. 16. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCHMARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED, THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT, 17, THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL. 18, NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR. 19, A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED. 20. CARE SHOULD BE TAKEN TO PREVENT GRADE 5, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS. 21, ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE, 22. NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER. 23, IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND ALL AFFECTED AGENCIES IMMEDIATELY. 24, NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED, 25, APPROVED SOIL STERILANT 15 REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT. 26, UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER. 27. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER, 28. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER, INDEX N0: G-03 PREPARED UNDER THE SUPERVISION OF: CITY OF FONTANA, CALIFORNIA GRADE CROSSING PEDESTRIAN IMPROVEMENT PROJECT DRAWN BY: SCALE: ff CITY F FONTANA L, PALMER AS SHOWN l q DESIGNEa By, GENERAL NOTES DATA: !��°° L. PALMER 07/08/16 Dote :f�CHECKED BY: APPROV DRAWING NO..O KEYVAN PIRBAZARI, P.E. K. PIRBAZARI I N IN C DATE. 7 5445 1