HomeMy WebLinkAbout5503-1GENERAL NOTES 1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ('GREEN BOOK") AND THE STATE OF CALIFORNIA D. 0. T. STD. SPEC'S AND PLANS. ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED. 2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK', THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION. 3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 4. ADVANCE CONSTRUCTION SIGNING INDICATING DURATION OF PROJECT SHALL BE IN PLACE ONE WEEK PRIOR TO IMPLEMENTING DETOURS. 5. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK, INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610. 6. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 7. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. B. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. 9. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT. 10. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE. 11. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTRACT UNDERGROUND SERVICE ALERT AT 1-800227-2600 TWO WORKING DAYS BEFORE EXCAVATION. 12. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS, ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES. 13. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS. 14. STATIONING REFERS TO THE CENTERLINE OF STORM DRAIN EXCEPT WHERE OTHERWISE NOTED. 15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION. 16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER. 17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT. 18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES. 20. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL. 21. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR. 22. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION, FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED. 23. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS. 24. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE. 25. NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER. 26. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE EXISTING FACILITIES, AND VERIFY ELEVATION AND LOCATION OF CONNECTIONS. CITY APPROVAL OF CONNECTIONS TO EXISTING FACILITIES DOES NOT IMPLY CORRECTNESS OF ELEVATIONS OR LOCATIONS SHOWN ON THE PLANS. 27. IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND ALL AFFECTED AGENCIES IMMEDIATELY. 28 NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED. 29. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OR STREETS. 30. APPROVED SOILS STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT. 31. ALL MANHOLES, CLGANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING. 32. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER. 33. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER. 34. RHE CONCRETE COATING ON THE INSIDE OF ALL REINFORCED CONCRETE PIPES MUST BE INCREASED TO PROVIDE A MINIMUM OF 1-1/2' OVER THE REINFORCING WHEN THE r DESIGN VELOCITIES EXCEED 20 FEET PER SECOND. THE CONCRETE DESIGN STRENGTH L IN THESE REACHES SHALL BE 1c=5,000 psi FOR VELOCITIES EXCEEDING 20 FEET PER SECONDAND ",000 psi FOR VELOCITIES EXCEEDING 30 FEET PER SECOND.' n wev n 35. MINIMUM DLOADFOR ALL R.C.P.IS1350. DIS CITY OF FONTANA CASA GRANDE AVENUE STORM DRAIN MPSD LINE "C" ----J191L Iii II I ���� � I �Itl['I' IIS 5��� I'i'II.I i W�QMP BMP: SHEET 4 LI � j' - ( TRACT =62I II SII �'-7- -� i [i, , sII --------------------------+' it TRACT V67\6- -- 7UN/C - x- TRACT T74M I TRACT 18875 [ III I I I I I I INDEX MAP SCALE:1'=150' LEGEND A.C. ASPHALTIC CONCRETE (R) RIDGE LINE PRIVATE ENGINEER'S NOTICE TO CONTRACTORS B.C. BEGIN CURVE RM RIGHT OF WAY B.V.C. BEG. VERTICAL CURVE P.C.C. PORTLAND CEMENT CONCRETE THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES OR STRUCTURES SHOWN ON THESE PLANS ARE OBTAINED B.W. BACK SIDEWALK T.FTG. TOP OF FOOTING BY A SEARCH OF AVAILABLE RECORDS; TO THE BEST OF OUR KNOWLEDGE, THERE ARE NO EXISTING UTILITIES EXCEPT THOSE C.B. CATCH BASIN THDW TOP OF HEADWALL SHOWN ON THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE C.L. CENTERLINE NT UTILITY LINES SHOWN ON THESE DRAWINGS. THE CONTRACTOR FURTHER ASSUMES ALL LIABILITY AND RESPONSIBILITY FOR D/L DAY LIGHT T.C. TOP TAN. TANGENT CURB E.C. END CURVE THE UTILITY PIPES, CONDUITS OR STRUCTURES SHOWN OR NOT SHOWN ON THESE DRAWINGS. E.P. EDGE PAVEMENT W WIDTH E.G. EDGE GRADE V VERTICAL DEPTH THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR THE JOB SITE CONDITIONS E.V.C. END VERTICAL CURVE (590.69) EXISTING ELEVATION DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT; INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS F.L. FLOW LINE 590.69 PROPOSED ELEVATION SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL DEFEND, F.S. FINISH SURFACE [590.69) FUTURE ELEVATION INDEMNIFY, AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN G.B. GRADE BREAK SLOPE 2:1 CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE H.P. HIGH POINT NEGLIGENCE OF THE OWNER OR THE ENGINEER. INV, INVERT AC PAVEMENT MWD METROPOLITAN WATER DISTRICT ® REMOVAL CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AND SHALL REPORT ALL DISCREPANCIES TO THE ENGINEER WVWD WEST VALLEY WATER DISTRICT PRIOR TO THE COMMENCEMENT OF ANY WORK. IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE ENGINEER OF O.C. ON CURVE ® GRIND WQ WATER QUALITY EDGE OF PAVEMENT ANY DISCREPANCIES. BEGINNING OF WORK MEANS ACCEPTANCE OF CONDITIONS. WQCB WATER QUALITY CATCH BASIN Qbmp WATER QUALITY FLOW RATE (CFS) CONTRACTOR SHALL COMPLY WITH ALL N.P.D.E.S. REQUIREMENTS. CITY OF FONTANA UTILITY NOTIFICATION LIST CONTRACTOR SHALL ADJUST TO FINISH GRADE ALL MANHOLE RIMS, WATER VALVE BOXES, UTILITY BOXES AND LIDS, ETC CONTRACTOR SHALL PROVIDE ALL THE NECESSARY PIPE FITTINGS TO COMPLETE THE WORK. THE ENGINEER PREPARING THESE PLANS SHALL NOT BE HELD RESPONSIBLE OR LIABLE FOR UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. ALL CHANGES TO THESE PLANS MUST BE REQUESTED IN WRITING AND MUST BE APPROVED BY THE ENGINEER OF RECORD. QUANTITIES SHOWN HEREON ARE PROVIDED FOR PERMIT AND BONDING PURPOSES ONLY. CONTRACTOR SHALL BE RESPONSIBLE FOR DETERMINING THEIR OWN QUANTITIES PRIOR TO BIDDING AND CONSTRUCTION. THE ENGINEER IS NOT RESPONSIBLE FOR DISCREPANCIES IN FINAL CONSTRUCTION QUANTITIES. REINFORCED POLYETHYLENE LINER REINFORCED POLYETHYLENE LINER SHALL BE PPL -24 CONTAINMENT MEMBRANE LINER BY BTL LINERS OR APPROVED EQUAL BY MWD. THE CONTAINMENT MEMBRANE LINER SHALL ENCOMPASS THE PIPE AND STRUCTURES 360 DEGREES. INSTALLATION SHALL BE PERFORMED BY APPROVED / CERTIFIED INSTALLER. INSTALLATION SHALL BE APPROVED BY MWD. M.W.D. CONSTRUCTION NOTES: 1. NOTIFY MR. JESSE FRANCO JR. OF M.W.D.'S WATER SYSTEM OPERATIONS GROUP, TELEPHONE (909)392-7184, AT LEAST TWO (2) WORKING DAYS (MONDAY THROUGH THURSDAY) PRIOR TO ANY WORK IN THE VICINITY OF MWD'S FACILITIES AND RIGHT-OF-WAY. 2. EXISTING PIPELINE IS ADEQUATE FOR AASHTO H-20 LOADING, WITH A MINIMUM 4 FEET OF COVER, DURING CONSTRUCTION, WITH A MINIMUM 5 FEET OF COVER, EQUIPMENT IMPOSING LOADS NO GREATER THAN THOSE IMPOSED BY A LOADED CATERPILLAR 657E OR A 666B SCRAPER MAY OPERATE OVER THE PIPELINE, PROVIDED THE GROUND IS MAINTAINED IN A SMOOTH CONDITION ON BOTH SIDES OF THE PIPELINE. 3. A LIST AND SPECIFICATIONS OF ALL CONSTRUCTION EQUIPMENT PROPOSED TO BE USED OVER THE PIPELINE MUST BE SUBMITTED FOR M.W.D.'S REVIEW AND APPROVAL AT LEAST 30 DAYS PRIOR TO CONSTRUCTION. 4. ALL M.W.D.'S STRUCTURES SHALL BE NOTED AND LOCATED PRIOR TO ANY CONSTRUCTION WORK. WHEN A MANHOLE OR OTHER M.W.D. FACILITY MUST BE MODIFIED TO ACCOMMODATE THE CONSTRUCTION, THE FACILITY SHALL BE MODIFIED BY M.W.D. FORCES. 5. THE FOLLOWING LOADING RESTRICTIONS APPLY: RIALTO PIPELINES THE VIBRATORY ROLLER AND COMPACTOR MUST NOT BE OPERATED IN VIBRATORY MODE WITHIN 30 FEET OF THE CENTERLINE OF THE PIPELINE. WHEN THE COVER IS A MINIMUM OF 4 FEET AND NO GREATER THAN THAT SHOWN IN THE FOLLOWING TABLE, ALL OF THE LISTED EQUIPMENT EXCEPT THE CAT SCRAPER MAY OPERATE OVER THE RIALTO PIPELINE BETWEEN THE STATIONS SHOWN ON THE TABLE BELOW. EXCEPT WHERE RESTRICTIONS APPLY ON THE TABLE BELOW, WHEN THE COVER IS A MINIMUM OF 5 FEET AND NO GREATER THAN SHOWN ON THE FOLLOWING TABLE, AND WHEN THE GROUND IS MAINTAINED IN A SMOOTH CONDITION WITH A UNIFORM SLOPE FOR THREE VEHICLE LENGTHS ON EACH SIDE OF THE PIPELINE, LOADED CAT SCRAPERS MAY OPERATE OVER THE RIALTO PIPELINE BETWEEN THE STATIONS SHOWN ON THE TABLE BELOW. SEWER: CITY OF FONTANA 8353 SIERRA AVENUE FONTANA, CA 92335 PHONE: 909.350.6632 GAS: SOUTHERN CALIFORNIA GAS COMPANY 16231 VALLEY BLVD. FONTANA, CA 92335 PHONE: 909.428.8411 ELECTRIC: SOUTHERN CALIFORNIA EDISON COMPANY 7951 REDWOOD AVE. FONTANA, CA. 92336 PHONE: 909.357.6221 SHEETINDEX CABLE: TIME WARNER CABLE 1205 DUPONT AVENUE ONTARIO, CA. 91761 PHONE: 909.390.4738 TELEPHONE: AT&T 11464 TELEGRAPH ROAD SANTA FE SPRINGS, CA 90670 PHONE: 714.666.5415 WATER: WEST VALLEY WATER DISTRICT 855 W. BASELINE ROAD RIALTO, CA 92377 PHONE: 909.875.1361 METROPOLITAN WATER DISTRICT WATER SYSTEM OPERATION GROUP ATTN: JESSE FRANCO JR. 909.392.7184 OR CELL: 818.468.5188 TITLE 1 CASA GRANDE AVENUE STORM DRAIN 2-3 STRUCTURAL SOURCE CONTROL BMP PLAN, PROFILE AND DETAILS 4 LATERAL PROFILES, DETAILS AND SECTIONS 5-7 WATER QUALITY CONSTRUCTION NOTES O INSTALL 6" PVC STORM DRAIN O INSTALL 12' PVC STORM DRAIN O INSTALL 12' PVC CLEANOUT O INSTALL TORRENT RESOURCES MAXWELL PLUS DRAINAGE SYSTEM (DETAIL SHT 4) O INSTALL 24"X24' JENSEN PRECAST CATCH BASIN (DETAIL SHT 4) O INSTALL 45" ELBOW *r V MAX. SIZE SELECTED NATIVE BEDDING COMPACTED TO 90% NOTES: 1. TRENCH WIDTH SHALL BE CONTROLLED TO TOP OF PIPE ZONE. 2.TRENCH DEPTHS OF GREATER THAN S SHALL HAVE ADEQUATE SHORING. 3, GLASS II AGG.BASE ALL TRENCHES LESS THAN 100' IN LENGTH. NOTE: COMPACTION SHALL BE 90% IN ALL ZONES UNLESS OTHERWISE SPECIFIED. TRENCH STABILITY SHALL CONFORM TO CAL -OSHA REQUIREMENTS. VICINITY MAP NOT TO SCALE TOP OF STRUCTURAL PVMT. SUBGRADE 3" MAX. SIZE NATIVE SOIL COMPACTED 95% 1:1 SLOPE OR FLATTER �/\ \ OR ADEQUATE SHORING 90% COMPACTED \\ \\ NATIVE BACKFILL 6" MAX. SIZE DE ROAD " IW O INSTALL 84" R.C.P. STORM DRAIN (D -LOAD PER PROFILE). 982 L.F. O CONSTRUCT MANHOLE PER CITY OF FONTANA STD. PLAN 3012. 3 EA. TOP OF STRUCTURAL PVMT. SUBGRADE 3" MAX. SIZE NATIVE SOIL COMPACTED 95% 6' MIN. 6" MIN. I I I = v z I H 8" MAX. 8" MAX. = I I I III= w 111 _ 0 N- w - a 111 = r a o it T STORM DRAIN PIPE BEDDING MATERIAL SHALL MEET OR EXCEED SECTION 306-1.2.1, STD. SPECS FOR PUBLIC WORKS CONSTRUCTION, LATEST EDITION. LOCALLY EXCAVATED NATIVE MATERIALS MAY BE BLENDED TO THE REQUIRED SAND EQUIVALENCY OF 30 OR GREATER RCP TRENCH DET, NOT TO SCALE I _a N 0 z z R 1:1 SLOPE OR FLATTER �/\ \ OR ADEQUATE SHORING 90% COMPACTED \\ \\ NATIVE BACKFILL 6" MAX. SIZE INSTALL 78" R.C.P. STORM DRAIN (D -LOAD PER PROFILE). 118 L.F. 6' MIN. 6" MIN. I I I = v z I H 8" MAX. 8" MAX. = I I I III= w 111 _ 0 N- w - a 111 = r a o it T STORM DRAIN PIPE BEDDING MATERIAL SHALL MEET OR EXCEED SECTION 306-1.2.1, STD. SPECS FOR PUBLIC WORKS CONSTRUCTION, LATEST EDITION. LOCALLY EXCAVATED NATIVE MATERIALS MAY BE BLENDED TO THE REQUIRED SAND EQUIVALENCY OF 30 OR GREATER RCP TRENCH DET, NOT TO SCALE I _a N 0 z z R N z 5 O_ 2f z w Ld w O 0_ D_ z of of O w z Lu a w z Q CD Q Q U Lo M CV I Z DF CONSTRUCTION NOTES QUANTITIES O INSTALL 24" R.C.P. STORM DRAIN (D -LOAD PER PROFILE). L.F. O INSTALL 78" R.C.P. STORM DRAIN (D -LOAD PER PROFILE). 118 L.F. O INSTALL 84" R.C.P. STORM DRAIN (D -LOAD PER PROFILE). 982 L.F. O CONSTRUCT MANHOLE PER CITY OF FONTANA STD. PLAN 3012. 3 EA. OS CONSTRUCT CATCH BASIN PER CITY OF FONTANA STD. PLAN 3004. 1 EA. O REMOVE EXISTING PIPE CLOSURE. 1 EA. CONSTRUCT PIPE CLOSURE (TYPE SHOWN ON PLAN) PER SAN BERNARDINO COUNTY FLOOD CONTROL DISTRICT STD. PLAN 176. 1 EA. O CONSTRUCT MODIFIED TRANSITION STRUCTURE R.C.B. TO PIPE SPPWC STD. PLAN 342-2. 2 EA. Og CONSTRUCT TRANSITION STRUCTURE REFERENCING MODIFIED SPPWC STD. PLAN 343-2. 2 EA. 10 CONSTRUCT TRANSITION STRUCTURE REFERENCING MODIFIED SPPWC STD. PLAN 344-2. 2 EA. 11 CONSTRUCT 3 BARREL 5' WIDE x THIGH R.C.B. PER CALTRANS STD. D81. 81 L.F. 12 CONSTRUCT MANHOLE ACCESS IN R.C.B. DECK PER CALTRANS STD. D82 AND SPPWC 323-2. 3 EA. 13 CUT AND REMOVE EXISTING STORM DRAIN PIPE. 30t L.F. 14 CONSTRUCT CONCRETE COLLAR PER CITY STD. PLAN 3022. 1 EA. 15 CONSTRUCT JUNCTION STRUCTURE PER CITY STD. PLAN 3009. 1 EA. IS)CONSTRUCT INLET MODIFIED'TYPE V" PER DETAILS ON SHEET 3. 1 EA. 17 INSTALL REINFORCED POLYETHYLENE LINER (SEE NOTE HEREON). 4,400 S.F. QUANTITIES 18 RELOCATE EXISTING WATER LINE & APPURTENANCES PER SEPARATE WATER PLANS. - 44 L.F. 19 CONSTRUCT TRENCH REPAIR PER CITY STD. PLAN 1008. 3,250 S.F. 118 L.F. 1 EA.r OWNIMUDENELOPER 1 EA' MADOLE AND ASSOCIATES, INC. NORTH FONTANA INVESTMENT CO., LLC 1 EA. 9302 PITTSBURGH AVE., SUITE 230 RANCHO 1156 N. MOUNTAIN AVE. UPLAND, 3 EA CUCAMONGA, CA 91730 PHONE: 909.481.6322 CA 91786-0670 PHONE: FAX: 909.481.6320 909.985.0971 CONTACT: MARK BERTONE CONTACT: STACEY SASSAMAN N z 5 O_ 2f z w Ld w O 0_ D_ z of of O w z Lu a w z Q CD Q Q U Lo M CV I Z DF