HomeMy WebLinkAbout5589-1GENERAL NOTES
1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE
CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN
BOOK'). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS
OTHERWISE NOTED.
2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE
RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE 'GREEN BOOK', THE CONTRACTOR
SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION.
3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT
DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION
SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC
RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610.
5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES
DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC
EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR
OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES.
7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES
5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE
GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE
REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES
LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND
MOVEMENT.
9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A
SEPARATE PERMIT FOR THAT PURPOSE.
10. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER,
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE
LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO
AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT
1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION.
11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT
LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION,
DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL
UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR
FACILITIES.
12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT
APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE
WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS.
13. CURVE DATA REFERS TO THE FACE OF CURB.
14. STA110NING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED.
15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE
CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING
CONSTRUCTION.
16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS
WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER.
17. REMOVAL AND REPLACEMENT OF EXISTING SURVEYCONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT
TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND
SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION
SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO
CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE
MONUMENT.
18. THE CONTRACTOR+ SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A
MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR
RESIDENTS AND EMERGENCY VEHICLES.
19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING
ADEQUATE WATERING, AT ALL TIMES.
20. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES
PER HOUR.
21. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE
DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING
CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL.
22. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR.
23. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE
REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED
DENSITY IS OBTAINED.
24. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET
IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY
NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS.
25. THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE TIME
OF CONSTRUCTION AND SHALL CONFORM TO THE CITY OF FONTANA STANDARD DETAILS.
26. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING
CONCRETE.
27. THE SEWER CONTRACTOR SHALL STAMP AN 'S' IN THE FACE OF THE CURB AT THE LOCATION OF THE
SEWER LATERAL.,
28. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED,
INSPECTED AND APPROVED.
29. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF
STREETS.
30. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT.
31. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF
THE CITY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING.
32. ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET
SECTIONS SHALL BE RECOMMENDED BY A GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF
FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH GRADING.
33. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE
BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING.
34. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING,
BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC
ENGINEER.
35. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED
BY THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER.
36. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO
SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER.
R-4TANERS1000611111110 mj� opgqi� I 101 ED 1- 19, "p Ilit,
AIR -QUALITY -MITIGATION -NOTES
BACM AQ -1
• ALL CLEARING, GRADING, EARTH -MOVING, OR EXCAVATION ACTIVITIES SHALL CEASE WHEN
WINDS EXCEED 25 MPH PER SCAQMD GUIDELINES IN ORDER TO LIMIT FUG11VE DUST EMISSIONS.
• THE CONTRACTOR SHALL ENSURE THAT ALL DISTURBED UNPAVED ROADS AND DISTURBED
AREAS WITHIN THE PROJECT ARE WATERED AT LEAST THREE (3) TIMES DAILY DURING DRY
WEATHER. WATERING, WITH COMPLETE COVERAGE OF DISTURBED AREAS, SHALL OCCUR AT
LEAST THREE TIMES A DAY, PREFERABLY IN THE MID-MORNING, AFTERNOON, AND AFTER WORK
IS DONE FOR THE DAY.
• THE CONTRACTOR SHALL ENSURE THAT TRAFFIC SPEEDS ON UNPAVED ROADS AND PROJECT
SITE AREAS ARE REDUCED TO 15 MILES PER HOUR OR LESS.
BACM AQ -2
THE CALIFORNIA AIR RESOURCES BOARD, IN TITLE 13, CHAPTER 10, SECTION 2485, DIVISION 3 OF
THE OF THE CALIFORNIA CODE OF REGULATIONS, IMPOSES A REQUIREMENT THAT HEAVY DUTY
TRUCKS ACCESSING THE SITE SHALL NOT IDLE FOR GREATER THAN FIVE MINUTES AT ANY LOCATION.
THIS MEASURE IS INTENDED TO APPLY TO CONSTRUCTION TRAFFIC. GRADING PLANS SHALL
REFERENCE THAT A SIGN SHALL BE POSTED ON-SITE STATING THAT CONSTRUCTION WORKERS NEED
TO SHUT OFF ENGINES AT OR BEFORE FIVE MINUTES OF IDLING (41).
MM AQ -1
DURING GRADING ACTIVITY, THE CONTRACTOR SHALL ENSURE THAT ALL RUBBER 11RED DOZERS,
SCRAPERS, AND GRADERS SHALL BE CALIFORNIA AIR RESOURCES BOARD (CARB) TIER 3 CERTIFIED
OR BETTER. ADDITIONALLY, DURING GRADING ACTIVITY, THE CONTRACTOR SHALL ENSURE THE TOTAL
HORSEPOWER -HOURS PER DAY FOR ALL EQUIPMENT SHALL NOT EXCEED 18,560
HORSEPOWER -HOURS PER DAY.
MM AQ -2
IN ORDER TO REDUCE PROJECT -RELATED AIR POLLUTANT AND GREENHOUSE GAS (GHG) EMISSIONS,
AND PROMOTE SUSTAINABILITY THROUGH CONSERVATION OF ENERGY AND OTHER NATURAL
RESOURCES, BUILDING AND SITE PLAN DESIGNS SHALL ENSURE THE PROJECT ENERGY EFFICIENCIES
SURPASS (EXCEED) APPLICABLE (2014) CALIFORNIA TITLE 24 ENERGY EFFICIENCY STANDARDS BY A
MINIMUM OF 5 PERCENT. VERIFICATION OF INCREASED ENERGY EFFICIENCIES SHALL BE DOCUMENTED
IN TITLE 24 COMPLIANCE REPORTS PROVIDED BY THE APPLICANT, AND REVIEWED AND APPROVED BY
THE CITY PRIOR TO THE ISSUANCE OF THE FIRST BUILDING PERMIT.
MM AQ -3
TO REDUCE ENERGY DEMAND ASSOCIATED WITH POTABLE WATER CONVEYANCE, THE PROJECT SHALL
IMPLEMENT THE FOLLOWING:
• U.S. EPA CERTIFIED WATERSENSE LABELED OR EQUIVALENT FAUCETS, HIGH -EFFICIENCY TOILETS
(HETS), AND WATER -CONSERVING SHOWER HEADS.
GENERALTER MITIGATION MEASURES FROM SWIP SPECIFIC PLAN DRAFT ENVIRONMENTAL IMPACT
REPORT
• 4.2-1 A: ALL CONSTRUCTION EQUIPMENT SHALL BE MAINTAINED IN GOOD OPERATION CONDITION
SO AS TO REDUCE EMISSIONS. THE CONSTRUCTION CONTRACTOR SHALL ENSURE THAT ALL
CONSTRUCTION EQUIPMENT IS BEING PROPERLY SERVICED AND MAINTAINED AS PER THE
MANUFACTURER'S SPECIFICATION. MAINTENANCE RECORDS SHALL BE AVAILABLE AT THE
CONSTRUCTION SITE FOR CITY VERIFICATION. [GPEIR MM AQ -1]
• 4.2-16: PRIOR TO THE ISSUANCE OF ANY GRADING PERMITS, ALL APPLICANTS SHALL SUBMIT
CONSTRUCTION PLANS TO THE CITY OF FONTANA DENOTING THE PROPOSED SCHEDULE AND
PROJECTED EQUIPMENT USE. CONSTRUCTION CONTRACTORS SHALL PROVIDE EVIDENCE THAT LOW
EMISSION MOBILE CONSTRUCTION EQUIPMENT WILL BE UTILIZED, OR THAT THEIR USE WAS
INVESTIGATED AND FOUND TO BE INFEASIBLE FOR THE PROJECT. CONTRACTORS SHALL ALSO
CONFORM TO ANY CONSTRUCTION MEASURES IMPOSED BY THE SCAQMD AS WELL AS CITY
PLANNING STAFF. [GPEIR MM AQ- 2]
• 4.6-1C: ALL PAINTS AND COATINGS SHALL MEET OR EXCEED PERFORMANCE STANDARDS NOTED
IN SCAQMD RULE 1113. [GPEIR MM AQ -3]
• 4.2-11): PROJECTS THAT RESULT IN THE CONSTRUCTION OF MORE THAN 19 SINGLE-FAMILY
RESIDENTIAL UNITS, 40 MULTIFAMILY RESIDENTIAL UNITS, OR 45,000 SQUARE FEET OF
RETAIL/COMMERCIAL/INDUSTRIAL SPACE SHALL BE REQUIRED TO APPLY PAINTS EITHER BY
HAND OR HIGH VOLUME, LOW PRESSURE (HVLP) SPRAY. [GPEIR MM AQ -4]
• 4.2-1E: ALL ASPHALT SHALL MEET OR EXCEED PERFORMANCE STANDARDS NOTED IN SCAQMD
RULE 1108. [GPEIR MM AQ -5]
• 4.2-1F PRIOR TO THE ISSUANCE OF GRADING PERMITS OR APPROVAL OF GRADING PLANS FOR
FUTURE DEVELOPMENT PROJECTS WITHIN THE ADDED AREA, FUTURE DEVELOPMENTS SHALL
INCLUDE A DUST CONTROL PLAN AS PART OF THE CONSTRUCTION CONTRACT STANDARD
SPECIFICATIONS. THE DUST CONTROL PLAN SHALL INCLUDE MEASURES TO MEET THE
REQUIREMENTS OF SCAQMD RULES 402 AND 403.
• 4.2-2A: ALL 'LARGE-SCALE" PROJECT APPLICANTS SHALL PROVIDE INCENTIVES TO USE MASS
TRANSIT INCLUDING THE PLACEMENT OF BUS STOP SHELTERS ALONG MAJOR THOROUGHFARES
IF NOT SO EQUIPPED. (CITY STAFF SHALL DETERMINE WHAT DENOTES A 'LARGE-SCALE'
PROJECT.) [GPEIR MM AQ -7]
• 4.2-2B: ALL 'LARGE-SCALE" PROJECT APPLICANTS SHALL INCORPORATE A BIKE/WALKING PATH
BETWEEN THESE SHELTERS, THE PROPOSED RESIDENTIAL AREAS, AND THE PROPOSED
COMMERCIAL AREAS. THESE PATHS SHALL BE UT AND CONFIGURED SO AS TO AVOID
POTENTIAL CONFLICT WITH ROADWAYS AND RAILROAD ACTIVITIES. [GPEIR MM AQ -8]
• 4.2-2C: ALL INDUSTRIAL AND COMMERCIAL FACILITIES SHALL POST SIGNS REQUIRING THAT
TRUCKS SHALL NOT BE LEFT IDLING FOR PROLONGED PERIODS PURSUANT TO TITLE 13 OF THE
CALIFORNIA CODE OF REGULATIONS, SECTION 2485, WHICH LIMITS IDLE TIMES TO NOT MORE
THAN FIVE MINUTES. [GPEIR MM AQ -9]
• 4.2-21): THE CITY SHALL REQUIRE THAT BOTH INDUSTRIAL AND COMMERCIAL USES DESIGNATE
PREFERENTIAL PARKING FOR VANPOOLS. [GPEIR MM AQ -10]
• 4.2-2E THE PROPOSED COMMERCIAL AND INDUSTRIAL AREAS SHALL INCORPORATE FOOD
SERVICE [GPEIR MM AQ -11]
• 4.2-2F: ALL INDUSTRIAL AND COMMERCIAL SITE TENANTS WITH 50 OR MORE EMPLOYEES SHALL
BE REQUIRED TO POST BOTH BUS AND METROLINK SCHEDULES IN CONSPICUOUS AREAS. [GPEIR
MM AQ -12]
• 4.2-2G: ALL INDUSTRIAL AND COMMERCIAL SITE TENANTS WITH 50 OR MORE EMPLOYEES
SHALL BE REQUESTED TO CONFIGURE THEIR OPERATING SCHEDULES AROUND THE METROUNK
SCHEDULE TO THE EXTENT REASONABLY FEASIBLE. [GPEIR MM AQ -13]
• 4.2-2H: ALL RESIDENTIAL AND COMMERCIAL STRUCTURES SHALL BE REQUIRED TO
INCORPORATE HIGH EFFICIENCYAOW POLLUTING HEATING, AIR CONDITIONING, APPLIANCES, AND
WATER HEATERS. [GPEIR MM AQ -14]
• 4.2-21: ALL RESIDENTIAL AND COMMERCIAL STRUCTURES SHALL BE REQUIRED TO INCORPORATE
THERMAL PANE WINDOWS AND WEATHER-STRIPPING. [GPEIR MM AQ -15]
• 4.2-2J: ALL RESIDENTIAL, COMMERCIAL, AND INDUSTRIAL STRUCTURES SHALL BE REQUIRED TO
INCORPORATE LIGHT COLORED ROOFING MATERIALS. [GPEIR MM AQ -16]
• 4.2-2K: PRIOR TO APPROVAL OF FUTURE DEVELOPMENT PROJECTS WITHIN THE 2010 ADDED
AREA, THE CITY OF FONTANA REDEVELOPMENT AGENCY SHALL CONDUCT PROJECT -LEVEL
ENVIRONMENTAL REVIEW TO DETERMINE POTENTIAL VEHICLE EMISSION IMPACTS ASSOCIATED WITH
THE PROJECT(S). MITIGATION MEASURES SHALL BE DEVELOPED FOR EACH PROJECT AS IT IS
CONSIDERED TO MITIGATE POTENTIALLY SIGNIFICANT IMPACTS TO THE EXTENT FEASIBLE.
POTENTIAL MITIGATION MEASURES MAY REQUIRE THAT FACILITIES WITH OVER 250 EMPLOYEES
(FULL OR PART-11ME EMPLOYEES AT A WORKSITE FOR A CONSECUTIVE SIX-MONTH PERIOD
CALCULATED AS A MONTHLY AVERAGE), AS REQUIRED BY THE AIR QUALITY MANAGEMENT PLAN,
IMPLEMENT TRANSPORTATION DEMAND MANAGEMENT (TDM) PROGRAMS.
NOTE:
STREET CONSTRUCTION NOTES
THE QUANTITIES SHOWN HEREON ARE ESTIMATES ONLY. THE CONTRACTORS SHALL PREPARE
THEIR OWN QUANTITIES AND BID A COMPLETE JOB.
A. CONTRACTOR TO ADJUST ALL VALVE COVERS AND MANHOLE RIMS TO GRADE
AFTER FINAL PAVING HAS BEEN INSTALLED.
* THE PAVEMENT SECTIONS AND COMPACTION REQUIREMENTS ARE PRELIMINARY. FINAL SECTIONS
AND COMPACTION REQUIREMENTS WILL BE AS DIRECTED BY THE SOILS ENGINEER AT THE
COMPLETION OF THE ROUGH GRADING OPERATION AND UPON COMPLETION OF R -VALUE TESTS.
UTILITY PROVIDERS
ELECTRICITY
SOUTHERN CALIFORNIA EDISON
7951 REDWOOD AVENUE
FONTANA, CA 92336
(909) 357-6203
WATER
FONTANA WATER COMPANY
15966 ARROW ROUTE
FONTANA, CALIFORNIA 92335
(909) 822-2201
GAS
SOUTHERN CALIFORNIA GAS CO.
1981 W. LUGONIA AVENUE
REDLANDS, CA 92374
(800) 427-2200
CIVIL ENGINEER
HUITT-ZOLLARS, INC
3990 CONCOURS, #330
ONTARIO, CA 91764
PHONE (909) 941-7799
FAX (909) 941-7789
CONTACT: MAURICE MURAD
OWNER/DEVELOPER
OAKMONT INDUSTRIAL GROUP
3520 PIEDMONT ROAD SUITE 100
ATLANTA, GA 30305
PH: 949-215-3796
CONTACT: JOHN ATWELL
TELEPHONE
AT&T
3939 E CORONADO STREET
ANAHEIM, CA 92807
(714) 237-6155
SEWER
CITY OF FONTANA
8353 SIERRA AVENUE
FONTANA, CA 92335
(909) 350-6632
CABLE
SPECTRUM
1500 AUTO CENTER DRIVE
ONTARIO, CA 91761
(800) 892-2253
SOILS ENGINEER/GEOTECH
SOUTHERN CALIFORNIA GEOTECHNICAL, INC.
22885 SAM RANCH PARKWAY, SUITE E
YORBA LINDA, CA 92887
PHONE (714) 685-1115
FAX (714) 685-1118
CONTACT: JOHN SEMINARA
s
E
ABBREVIATIONS
VC
CONSTRUCTION NOTES
TP
TOP OF PAVEMENT
TC
TOP OF CURB
QvanlnnEs
O
CONSTRUCT 8" CONCRETE CURB AND GUTTER PER CITY OF FONTANA STD. NO. 1000 ...........................
706
LF
O5
CONSTRUCT CONCRETE SIDEWALK PER CITY OF FONTANA STD. NO. 1006 ......................................
3,186
SF
O
CONSTRUCT 4.5" MIN. AC PAVEMENT OVER 9" CAB OVER 12" MIN 959 COMPACTED
GRADE BREAK
HP
HIGH POINT
NATIVE SUBGRADE PER CITY OF FONTANA . S.TD.. NO.. 400 ......................................................
13,725
SF
t5
CONSTRUCT COMMERCIAL DRIVEWAY PER CITY OF FONTANA STD. NO. 1002 ...................................
1,598
SF
5o
CONSTRUCT LOCAL DEPRESSION AT CATCH BASIN PER CITY OF FONTANA
LOCAL DEPRESSION
EP
EDGE OF PAVEMENT
STD. 3003 (CASE A), H=4...........................................................................................
1
EA
6o
SAWCUT AND REMOVE EXISTING AC PAVING.....................................................................9,071
P.I.P. -
SF
6t
SAWCUT AND REMOVE EXISTING PCC CURB & GUTTER...........................................................
178
LF
s2
SAWCUT AND REMOVE EXISTING PCC SIDEWALK...................................................................
712
SF
7o
REMOVE EXISTING CMP INLET SEE STORM DRAIN PLAN, DWG 5414 .............................................
1
EA
78
RELOCATE EXISTING UTILITY PULLBOX BY OTHERS............................................................. 1
EA
8o
RELOCATE EXISTING FIRE HYDRANT BY OTHERS...................................................................
1
EA
81
RELOCATE EXISTING STREET LIGHT & APPURTENANCES BY OTHERS ................................................
1
EA
82
REMOVE EXISTING WATER METER BY WATER COMPANY...............................................................
1
EA
83
RELOCATE EXISTING STREET LIGHT PULLBOX BY OTHERS............................................................
1
EA
92
EXISTING OVERHEAD POWER LINES TO BE UNDERGROUNDED AND POLES REMOVED BY SCE .....................
93
COLD PLANE EXISTING AC MINIMUM 0.10' DEPTH & AC OVERLAY TO MATCH EXISTING ...........................
306
SF
94
TIE -OUT AND RESET EXISTING SURVEY MONUMENT..................................................................3
EA
195
SAWCUT & REMOVE EXISTING DRIVEWAY AND APPURTENANCES......................................................
1
EA
* THE PAVEMENT SECTIONS AND COMPACTION REQUIREMENTS ARE PRELIMINARY. FINAL SECTIONS
AND COMPACTION REQUIREMENTS WILL BE AS DIRECTED BY THE SOILS ENGINEER AT THE
COMPLETION OF THE ROUGH GRADING OPERATION AND UPON COMPLETION OF R -VALUE TESTS.
UTILITY PROVIDERS
ELECTRICITY
SOUTHERN CALIFORNIA EDISON
7951 REDWOOD AVENUE
FONTANA, CA 92336
(909) 357-6203
WATER
FONTANA WATER COMPANY
15966 ARROW ROUTE
FONTANA, CALIFORNIA 92335
(909) 822-2201
GAS
SOUTHERN CALIFORNIA GAS CO.
1981 W. LUGONIA AVENUE
REDLANDS, CA 92374
(800) 427-2200
CIVIL ENGINEER
HUITT-ZOLLARS, INC
3990 CONCOURS, #330
ONTARIO, CA 91764
PHONE (909) 941-7799
FAX (909) 941-7789
CONTACT: MAURICE MURAD
OWNER/DEVELOPER
OAKMONT INDUSTRIAL GROUP
3520 PIEDMONT ROAD SUITE 100
ATLANTA, GA 30305
PH: 949-215-3796
CONTACT: JOHN ATWELL
TELEPHONE
AT&T
3939 E CORONADO STREET
ANAHEIM, CA 92807
(714) 237-6155
SEWER
CITY OF FONTANA
8353 SIERRA AVENUE
FONTANA, CA 92335
(909) 350-6632
CABLE
SPECTRUM
1500 AUTO CENTER DRIVE
ONTARIO, CA 91761
(800) 892-2253
SOILS ENGINEER/GEOTECH
SOUTHERN CALIFORNIA GEOTECHNICAL, INC.
22885 SAM RANCH PARKWAY, SUITE E
YORBA LINDA, CA 92887
PHONE (714) 685-1115
FAX (714) 685-1118
CONTACT: JOHN SEMINARA
s
E
ABBREVIATIONS
VC
VERTICAL CURVE
TP
TOP OF PAVEMENT
TC
TOP OF CURB
EL
ELEVATION
FL
FLOWLINE
FG
FINISH GRADE
FS
FINISH SURFACE
CF
CURB FACE
GB
GRADE BREAK
HP
HIGH POINT
INV
INVERT ELEVATION
TG
TOP OF GRATE
CB
CATCH BASIN
RD
ROOF DRAIN
LD
LOCAL DEPRESSION
EP
EDGE OF PAVEMENT
COTG -
CLEANOUT TOP OF GRATE
SMH- SEWER MANHOLE
R
RIDGE LINE
P.I.P. -
PROTECT IN PLACE
CL
CENTERLINE
DWY
DRIVEWAY
C&G
CURB AND GUTTER
TB
TOP OF BERM
TW
TOP OF WALL
EG
EXISTING GROUND
PP
POWER POLE
LEGEND
RIGHT OF
WAY
LOT LINE
1
EASEMENT
EXISTING
SEWER
EXISTING
WATER
EXISTING
ELECTRICAL
EXISTING
GAS
AC PAVEMENT REMOVAL
NTERs,AT LEGEND
10 Ti x
{ LIMITS
SLOVER AVENUE
Lm
SANTA ANA AVENUE A
W
Lu
2 412
e 2 e
e �
ROSE AVENUE
Cr
� e 2
y
e
Q.
U U
JURUPA AVENUE
VICINITY MAP
NOT TO SCALE
SHEET 3
SHEET INDEX MAP
SCALE: 1"=200'
SHEET INDEX
SHEET NO.
DESCRIPTION
1
TITLE SHEET & TYPICAL SECTIONS AND DETAILS
2
STREET IMPROVEMENT PLANS AND PROFILES
3
STREET CROSS SECTIONS
PROP. W'LY
R/W
EXIST EXIST. E'LY
EXIST. W'LY CL R/W
R/W
34' 33'
2' 32'
12' 22' 22' 11' 10
6" 5' 6.5' TRAVEL
LANE
29;
_- I EXIST. AC/AB -----
i f +- - - - - - - - - - -
PROP. SW --- --- /\ T ----------------------------------------- FUTURE. SW
'L
PROP. C&G PROP. AC/AB EXIST. C&G
CATAWBA AVENUE - TYPICAL SECTION
N.T.S.
TI=6.5 (COLLECTOR)
BENCH MARK: NO. REVISION DESCRIPTION DATE ENGR. CITY DATE I CITY OF FONTANA, CALIFORNIA
D SHOULD CONSTRUCTION OF THE �%�OFESS/�
CITY OF FONTANA BENCHMARK N0. 289 Oul
NGVD29, ELEVATION=1032.22' REQUIRED IMPROVEMENTS NOT p. QR ' ' • T
.. ������ Di]pGOo MCt]C1� p�Q�r
FOUND RAILROAD SPIKE IN POWER POLE, NE CORNER CATAWBA COMMENCE WITHIN TWO YEARS %���;• ���CE H' li,P , yc�
AVENUE &SANTA ANA AVENUE o OF THE DATE OF APPROVAL 00� ;.��NO. 333669 ?�� Huitt-Zollars, Inc. Ontario DRAWN BY: CATAWBA AVENUE SCALE:
SHOWN HEREON AND CARRIED / 3. m
BASIS OF BEARING: DIAL TWO WORKING FORTH IN A DILIGENT MANNER, 00 EXPIRATION : m/
3990 CONCOURS, SUITE 330 *ONTARIO, CALIFORNIA 91764 • (909) 941-7799 HZ STAFF AS SHOWN
:
BEFORE ��. DAYS BEFORE THE CITY ENGINEER MAY REQUIRE �j *'•. 6-30-2018 : *�0 DESIGNED BY: TITLE SHEET - STREET CROSS SECTION DATE:
THE BEARING OF NORTH 89'45'02 EAST OF THE CENTERLINE YOU DIG YOU DIG REVISIONS TO THE PLANS TO LI, • o O STRUCTIO NOTES & QUANTITY ESTIMATE 12/2016
OF SANTA ANA AVENUE PER PARCEL MAP NO. 19527 FILED J •.. Clvl\, ,• �Q / APPROVED BY MAURICE H. MURAD R.C.E. EXPIRES DATE DLW
IN BOOK 243 PAGES 54, 55 AND 56, OF PARCEL MAPS, TOLL FREE 1-800-227-2600 BRING THEM INTO CONFORMANCE 119j�. •., .-'���� CHECKED BY: APPROVED B . DWG. NO.:
RECORDS OF SAN BERNARDINO COUNTY HAS BEEN TAKEN AS A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT WITH STANDARDS IN EFFECT. %X OF =V\ 33366 6-30-18 / 30�� M.H.M. v t-� Z, -zz 1
THE BASIS OF BEARING FOR THIS SURVEY. 24A��
CITY ENGINEER R.C.E. 51152 DATE: 3