Loading...
HomeMy WebLinkAbout5524-1SIGNING AND STRIPING GENERAL NOTES: 1. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA DEPARTMENT OF ENGINEERING PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610. 2. ALL WORK, MATERIALS, EQUIPMENT AND TEMPORARY TRAFFIC CONTROL SHALL CONFORM TO THESE PLANS, THE CITY OF FONTANA STANDARD SPECIFICATIONS, THE STANDARD PLANS AND SPECIFICATIONS OF THE STATE OF CALIFORNIA, DATED 2015, AND THE CALIFORNIA MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES, DATE 2014. 3. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN TEMPORARY TRAFFIC CONTROL AT ALL TIMES. 4. ALL SIGNS SHALL BE INSTALLED PER CITY STANDARD DETAIL 4003, UNLESS OTHERWISE SHOWN ON THE PLANS. 5. ALL STRIPING AND PAVEMENT MARKINGS SHALL BE ALKYD THERMOPLASTIC UNLESS OTHERWISE NOTED. it MATCHLINE: STA.47+00 SEE SHEET 2 6. SUBSTITUTE TYPE "C" PAVEMENT MARKERS FOR TYPE "G" MARKERS ON DETAIL 38 ON HIGHWAYS WITH RAISED MEDIANS. 7. STRIPING AND PAVEMENT MARKINGS TO BE REMOVED SHALL BE REMOVED BY SANDBLASTING. 8. CONTROL POINTS OR "CAT TRACKING" SHALL BE APPROVED BY THE CITY ENGINEER PRIOR TO APPLICATION OF PAVEMENT STRIPING AND LEGENDS. NOTIFY THE CITY AT LEAST TWO DAYS PRIOR FOR APPROVAL OF "CRT TRACKING". 9. BLUE RAISED PAVEMENT MARKERS SHALL BE INSTALLED AT ALL FIRE HYDRANT LOCATIONS PER CITY STANDARD PLANS. 10. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORDS, WHO SHALL PROVIDE RECORD DRAWINGS AND ELECTRONIC AUTOCAD FILES TO THE CITY ENGINEER. SIGNING AND STRIPING CONSTRUCTION NOTES: E ; EXISTING SIGN TO REMAIN. INSTALL SIGN AND POST AS SHOWN. ® RELOCATE EXISTING SIGN AND POST TO NEW LOCATION AS SHOWN. ® INSTALL THERMOPLASTIC PAVEMENT MARKING AS SHOWN PER CA-MUTCO STANWM& 0 INSTALL THERMOPLASTIC 12" SOLID WHITE LIMIT UNE OR CROSSWALK MARKING. ®� REMOVE CONFLICTING STRIPING OR LEGENDS. IWALL THERMOPLASTIC Be WHITE CHEVRON STRIPE AT 45 DEGREES AND 20' SPACING. INSTALL THERMOPLASTIC 4" DOUBLE YELLOW CENTERUNE STRIPE — DETAIL 22 INSTALL THERMOPLASTIC 4" WHITE RIGHT EDGE UNE STRIPE — DETAIL 278. INSTALL THERMOPLASTIC 8" WHITE CHANNEUZING LANE UNE STRIPE — DETAIL 38. NOTE: REMOVE ALL CONFLICTING STRIPING OR LEGENDS. OEXISTING SIGNALIZED INTERSECTION MATCHLINE: STA.44+00 SEE BELOW LEFT BANANA AVENUE Know what's below. Call before you dig. WOODLAND DRIVE BANANA AVENUE (45) SCALE: 1 " = 40' 20 0 20 40 60 C6 m Lo 0 c 0 c 0 m 0 CL i 0 0 c9 0 0 I cp I U '1 0 L U 0 a Ci L W k 0 0 O a� 0 ME 0 Z N a3 0 0 0 PM TYPE N(L) I �? / " (1111J I Ek 1c — �� ----------------------`o---- ----------- ------ ---- 20' TAPER Nd o� W Z �_ 900 N� o 0 N O 2 w N M — cWi� ------------------ — -- -- -- ---------- ----- ----- ----------------- --- ---�`\ - --R26(CA) /� W 22 "SLOW" PM 'SCHOOL" PM IS XX IX. S/W Mp i BANANA AVENUE (45) SCALE: 1 " = 40' 20 0 20 40 60 C6 m Lo 0 c 0 c 0 m 0 CL i 0 0 c9 0 0 I cp I U '1 0 L U 0 a Ci L W k 0 0 O a� 0 ME 0 Z N a3 0 0 0