Loading...
HomeMy WebLinkAbout5510-2•14/11/2016 - IEUA GENERAL NOTES 1. THE CONTRACTOR SHALL TAKE ALL PRECAUTI❑NARY MEASURES NECESSARY TO PROTECT EXISTING IMPROVEMENTS, WHICH ARE TO REMAIN IN PLACE, FROM DAMAGE. ANY IMPROVEMENTS DAMAGED BY THE CONTRACTOR'S ❑PERATI❑NS SHALL BE EXPEDITIOUSLY REPAIRED OR RECONSTRUCTED TO THE ENGINEER'S SATISFACTI❑N AT THE CONTRACTOR'S EXPENSE WITH❑UT ADDITI❑NAL COMPENSATION. 2. CONTRACTOR SHALL FIELD LOCATE ALL EXISTING PIPING AND EQUIPMENT THAT CONFLICTS WITH C❑NSTRUCTI❑N AND REMOVE AND REPLACE AS REQUIRED. AFTER CONSTRUCTION IS COMPLETE, EXISTING PIPING SYSTEMS SHALL BE RETURNED TO THE SAME OR BETTER CONDITION THAN AS BEFORE. ALL FIELD REL❑CATI❑N OF EXISTING PIPING SHALL BE RECORDED ON RECORD DRAWINGS. IN AREAS WHERE GAS PIPING IS LOCATED, CONTRACTOR SHALL POTHOLE AND LOCATE GAS PIPING BEFORE EXCAVATI❑N OF THE AREA. 3. THE CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTI❑NS TO PREVENT DAMAGE TO THE EXISTING STRUCTURES OR OTHER EXISTING IMPROVEMENTS TO REMAIN. CONTRACTOR SHALL ALSO PR❑VIDE ALL NECESSARY BRACING, SCAFFOLDING OR OTHER MEASURES NECESSARY FOR CONSTRUCTION. 4. REMOVAL, ABANDONMENT OR TEMPORARY REL❑CATION OF EXISTING PIPES OR UTILITIES SHALL BE SCHEDULED WITH THE ENGINEER TO AVOID UNNECESSARY DISRUPTION OF PLANT ❑PERATI❑NS. 5. ELEVATI❑NS. SHOWN ARE BASED ON THE AS -BUILT DRAWINGS. CONTRACTOR SHALL FIELD VERIFY AND ADJUST ELEVATI❑NS AS REQUIRED TO MAINTAIN DIMENSI❑NAL RELATIONSHIPS DEPICTED IN THE DRAWINGS. 6. CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING AND SUPERVISING AN AIR M❑NIT❑RING PROGRAM WHILE WORK IS BEING PERFORMED ON, IN OR ADJACENT TO ANY OF THE ENCLOSED SPACES. THE CONTRACTOR SHALL COMPLY WITH CAL -OSHA AND ALL OTHER LOCAL AGENCY REQUIREMENTS. 7. CONTRACTOR SHALL RESTORE ALL EXISTING PAVED AREAS, DISTURBED DURING C❑NSRUCTI❑N INCLUDING INSTALLATION OF PIPELINES, DRAINS AND ELECTRICAL DUCTS TO ORIGINAL CONDITI❑N. CURB AND GUTTER, AREA DRAINS, AND ALL SITE DRAINAGE AFFECTED BY THE WORK SHALL BE RETURNED TO THE SAME OR BETTER CONDITION AFTER WORK IS COMPLETED. 8. THE CONTRACTOR SHALL RESTORE ALL LANDSCAPING TO CORRECT GRADE UPON C❑MPLETI❑N. THIS SHALL INCLUDE REPLANTING OF TREES OF COMPARABLE SIZE TO EXISTING (MIN 6' BOX) FOR ANY DESTROYED BY THE PROJECT, WITHIN 45 DAYS OF COMPLETION. 9. THE CONTRACTOR SHALL COMPLY WITH STATE DEPARTMENT OF HEALTH SERVICE CRITERIA FOR THE SEPARATION OF POTABLE WATER MAINS AND SANITARY SEWERS AS SET FORTH IN SECTION 64630, TITLE 22 OF THE CALIFORNIA ADMINISTRATIVE CODE. 10. ADJUST ALL MANHOLES, VALVE BOXES AND PULL BOXES TO FINISHED GRADE UNLESS OTHERWISE SHOWN OR DIRECTED. MANHOLES IN OPEN, UNPAVED AREAS SHALL BE SET SIX(6) INCHES ABOVE GRADE. w " 11. THE CONTRACTOR SHALL NOTIFY THE ENGINEER AS SPECIFIED 72 HOURS IN ADVANCE OF MAKING ANY C❑NNECTI❑N TO AN ACTIVE PIPELINE OR UTILITY SYSTEM, AND SHALL RECEIVE THE ENGINEER'S CONSENT BEFORE PROCEEDING. w w 12. THE CONTRACTOR SHALL SCHEDULE HIS WORK TO CONTINUOUSLY MAINTAIN PLANT OPERATIONS AND SHALL NOT UNDULY RESTRICT PLANT ACCESS OR CIRCULATI❑N. 13. THE CONTRACTOR SHALL PR❑VIDE ADEQUATE SANITARY CONVENIENCES FOR THE USE OF ALL PERSONS AT THE C❑NSTRUCTI❑N SITE OF THE WORK. SUCH CONVENIENCES SHALL INCLUDE CHEMICAL TOILETS OR WATER CLOSETS LOCATED AT APPROPRIATE L❑CATI❑NS. AT C❑MPLETI❑N OF THE WORK ALL SUCH CONVENIENCES SHALL BE REMOVED AND THE SITE LEFT IN SANITARY CONDITION. 14. THE CONTRACTOR SHALL FURNISH POTABLE WATER FOR A DRINKING SOURCE OTHER THAN THE EXISTING PLANT UTILITY WATER SUPPLY, WHICH SHALL MEET ALL THE REQUIREMENTS OF THE COUNTY AND STATE HEALTH DEPARTMENTS. CONTRACTOR SHALL ALSO SUPPLY AMPLE SIGNS THROUGHOUT THE WORK SITE AREA ADVISING HIS EMPLOYEES THAT THE PLANT WATER IS NOT POTABLE. 15. THE CONTRACTOR SHALL PR❑VIDE AT HIS OWN COST ALL ELECTRICAL POWER NECESSARY FOR C❑NSTRUCTI❑N, TESTING, GENERAL AND SECURITY LIGHTING AND ALL OTHER PURPOSES, WHETHER SUPPLIED THROUGH TEMPORARY OR PERMANENT FACILITIES. 16. THE CONTRACTOR SHALL NOTE THAT THERE MAY BE OTHER PROJECTS UNDER CONSTRUCTI❑N AT THIS SITE AND/OR NEARBY SITE. CONTRACTOR SHALL COORDINATE WITH THE OTHER CONTRACTORS PRESENT ON THE SITE DURING THE COURSE OF C❑NSTRUCTI❑N. 17. AREAS WHERE MECHANICAL COMPACTI❑N OR BACKFILL CANNOT BE ACCOMPLISHED SHALL USE A 2 -SACK CEMENT/SAND SLURRY FOR BACKFILL PER SECTI❑N 02560 IN THE SPECIFICATI❑NS. 18. IRRIGATI❑N LINES ARE NOT MARKED AND SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CORRECT AT NO COST TO AGENCY. 19. ELECTRICAL CONDUIT RUNS PARALLEL TO PROJECT AND CROSSES VICINITY SHOWN. CONTRACTOR SHALL PROBE TO 4' AND ANY DRAINAGE SHALL BE RESPONSIBILITY OF THE CONTRACTOR ON THESE LATERALS. 20. THE CONTRACTOR SHALL SUBMIT C❑PIES OF HIS DEPARTMENT OF INDUSTRIAL SAFETY PERMIT TO IEUA AND TO THE CITY OF ONTARIO. IEUA GENERAL PIPING NOTES 1. LAY PIPE TO UNIFORM GRADE BETWEEN INDICATED ELEVATION POINTS. MINIMUM COVER SHALL BE 3'-0' UNLESS OTHERWISE SHOWN. 2. SIZE OF FITTINGS SHOWN ON DRAWINGS SHALL CORRESPOND TO ADJACENT STRAIGHT RUN OF PIPE, UNLESS OTHERWISE INDICATED. TYPE OF J❑INT AND FITTING MATERIAL SHALL BE THE SAME AS SHOWN FOR ADJACENT STRAIGHT RUN OF PIPE. 3. ALL SEWER MAINS SHALL BE BELL AND SPIGOT, EXTRA -STRENGTH VITRIFIED CLAY PIPE (VCP) UNLESS OTHERWISE NOTED ON THE PLANS. 4. UNLESS OTHERWISE APPROVED, LOW PRESSURE WATER TEST FOR GRAVITY SEWER LINES AND PRESSURE WATER TEST FOR THE PRESSURIZED PIPELINE SHALL BE PERFORMED IN CORF❑RMANCE WITH SECTI❑N 306-1.4 OF THE STANDARD SPECIFICATI❑NS FOR PUBLIC WORKS CONSTRUCTION. 5. PRI❑R TO STARTING C❑NSTRUCTI❑N, THE CONTRACTOR SHALL VERIFY LOCATI❑N AND ELEVATION OF EXISTING SEWER MAIN(S) AND NOTIFY AND OBTAIN APPROVAL OF THE DESIGN ENGINEER AND IEUA OF ANY VARIATI❑N FROM DESIGN. 6. ALL TRENCHING AND/OR SH❑RING SHALL MEET REQUIREMENTS OF CAL -OSHA. 7. L❑CATION AND NUMBER OF PIPE HANGERS AND PIPE SUPPORTS SHOWN IS ONLY APPROXIMATE. FINAL SUPPORT REQUIREMENTS SHALL BE DETERMINED IN THE FIELD AND APPROVED BY THE ENGINEER PRI❑R TO INSTALLATI❑N. 8. APPROPRIATE STANDARD WALL PIPE DETAIL SHALL BE USED WHEREVER PIPING PASSES FROM A STRUCTURE TO BACKFILL. 9. ALL FLEXIBLE CONNECTORS OR FLANGED COUPLING ADAPTERS SHOWN ON DRAWINGS BELOW GROUND SHALL BE PROVIDED WITH THRUST TIES, BLOCKS, OR ANCHORS UNLESS OTHERWISE NOTED. THRUST PR❑TECTI❑N SHALL BE ADEQUATE FOR THE TEST PRESSURES INDICATED. 10. SYMBOLS, LEGENDS, AND PIPE USE IDENTIFICATIONS SHOWN SHALL BE FOLLOWED THROUGHOUT THE DRAWINGS, WHEREVER APPLICABLE. ALL OF THE VARIOUS APPLICATIONS ARE NOT NECESSARILY USED IN THE PROJECT. 11. ALL PIPING SPECIFIED TO BE PRESSURE TESTED, EXCEPT FLANGED, WELDED GROOVED END OR SCREWED PIPING, SHALL BE PROVIDED WITH THRUST PROTECTION AT ALL DIRECTION CHANGES, UNLESS OTHERWISE NOTED. SEE THRUST DETAILS AND NOTES ON DRAWINGS. 12. NUMBER AND L❑CATI❑N OF UNI❑NS SHOWN ON DRAWINGS ARE ONLY APPROXIMATE. PROVIDE ALL UNIONS NECESSARY TO FACILITATE CONVENIENT REMOVAL OF VALVES AND MECHANICAL EQUIPMENT. 13. UPON APPROVAL BY THE ENGINEER, ALL PIPELINES SHOWN ON DRAWINGS TO BE ABANDONED SHALL BE PROPERLY CUT AND PLUGGED WITH N❑N-METALLIC GROUT OR CEMENT CONCRETE. Southland Engineering 2200 BUSINESS WAY, Ste. 100 RIVERSIDE, CA. 92501 (951) 788-8488 Designed Drawn Checked Date IEUA SEWER GENERAL NOTES 1. ALL WORK SHALL BE DONE IN STRICT CONFORMANCE WITH THE PROJECT SPECIFICATIONS AS APPROVED BY THE INLAND EMPIRE UTILITIES AGENCY (IEUA), THE CITY OF ONTARIO AND THE CITY OF FONTANA AND THE STANDARD SPECIFICATI❑NS FOR PUBLIC WORKS CONSTRUCTION (LATEST EDITION) AND THE IEUA STANDARD DETAIL SHEET OF THIS PLAN SET (SHEET NO. 4) AS APPROPRIATE. 2. ANY CONTRACTOR PERFORMING WORK ON THIS PROJECT SHALL FAMILIARIZE HIMSELF WITH THE SITE AND SHALL BE SOLELY RESPONSIBLE FOR ANY DAMAGE TO EXISTING FACILITIES RESULTING DIRECTLY OR INDIRECTLY FROM HIS ❑PERATI❑NS, WHETHER OR NOT SHOWN ON THESE PLANS. 3. ALL OBSTRUCTIONS WITHIN THE AREA TO BE IMPROVED ARE TO BE REMOVED OR RELOCATED AT THE DIRECTI❑N OF THE ENGINEER. UTILITIES ARE TO BE RELOCATED BY THEIR RESPECTIVE OWNERS. THE CONTRACTOR IS REFERRED TO SECTION 5 OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. 4. UTILITY LINE L❑CATI❑NS WERE TAKEN FROM RECORD AND WERE NOT LOCATED IN THE FIELD UNLESS OTHERWISE NOTED ON THE PLAN. THE CONTRACTOR IS REFERRED TO SECTI❑N 5 OF THE STANDARD SPECIFICATI❑NS FOR PUBLIC WORKS CONSTRUCTION. 5. IN CASE OF ANY ACCIDENTS INVOLVING SAFETY MATTERS COVERED BY SECTI❑N 6424 OF THE CALIFORNIA LABOR CODE, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE STATE DIVISI❑N OF INDUSTRIAL SAFETY. 6. CALL UNDERGROUND SERVICE ALERT (800-422-4133) FOR UNDERGROUND LOCATIONS 48 HOURS BEFORE DIGGING. 7. THE CONTRACTOR SHALL OBTAIN A TRAFFIC CONTROL PERMIT 48 -HRS PRIOR TO THE TIME OF CONSTRUCTION WITHIN THE PUBLIC RIGHT -❑F -WAY. THE CONTRACTOR IS REFERRED TO SECTION 7-10.3 OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. 8. THE CONTRACTOR SHALL RENEW OR REPLACE ANY EXISTING TRAFFIC STRIPING AND/OR PAVEMENT MARKINGS WHICH DURING HIS OPERATI❑NS HAVE BEEN EITHER REMOVED OR THE EFFECTIVENESS OF WHICH HAS BEEN REDUCED. RENEWAL OF PAVEMENT STRIPING & MARKINGS SHALL BE DONE IN CONFORMANCE WITH SECTI❑N 310-5.6 OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. 9. ALL SEWER MAINS SHALL BE BELL & SPIGOT, EXTRA -STRENGTH VIRTIFIED CLAY PIPE (VCP) UNLESS OTHER WISE NOTED ON THE PLANS. 10. PRIOR TO STARTING C❑NSTRUCTI❑N, THE CONTRACTOR SHALL VERIFY L❑CATION AND ELEVATION OF EXISTING SEWER MAIN(S) AND NOTIFY AND OBTAIN APPROVAL OF THE DESIGN ENGINEER AND IEUA OF ANY VARIATION FROM DESIGN. 11. CONSTRUCTION SHALL NOT BEGIN ON FACILITIES TO BE OWNED BY IEUA UNTIL AFTER THE ISSUANCE OF A PERMIT BY IEUA TO ALLOW THE CONSTRUCTION AND ALSO AFTER A PRE-CONSTRUCTI❑N CONFERENCE TO BE HELD AT LEAST 1 WEEK PRIOR TO BEGINNING CONSTRUCTION. 12. IN ADDITION, IEUA AND THE CITY OF ONTARIO AND THE CITY OF FONTANA SHALL BE NOTIFIED A MINIMUM OF 48 HOURS PRI❑R TO ANY CONSTRUCTI❑N IN THE VICINITY OF THE TRUNK SEWER OR ANY FACILITIES OWNED AND OPERATED BY IEUA AND/OR THE CITY OF ONTARIO AND THE CITY OF FONTANA. 13. ALL TRENCHING AND/OR SHORING SHALL MEET REQUIREMENTS OF CAL -OSHA. 14. THE CONTRACTOR SHALL SUBMIT COPIES OF HIS DEPARTMENT OF INDUSTRIAL SAFETY PERMIT TO IEUA AND TO THE CITY OF ONTARIO AND THE CITY OF FONTANA. 15. SHOP DRAWINGS AS REQUIRED BY THE PERMIT SHALL BE APPROVED BY IEUA PRIOR TO BEGINNING OF THE C❑NSTRUCTI❑N. 16. UNLESS OTHERWISE APPROVED, LOW PRESSURE WATER TEST FOR THE GRAVITY SEWER LINES AND PRESSURE WATER TEST FOR THE PRESSURIZED PIPELINES SHALL BE PERFORMED IN CONFORMANCE WITH SECTION 306-1.4. OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. IEUA PIPE SUPPORT NOTES 1. ALL CROSSING HOUSE LATERALS 10' AND SMALLER SHALL BE SUPPORTED BY USE OF CASE 3 PIPE SUPPORT DETAIL. 2. ALL N❑N-METALLIC CROSSING PIPELINE AND CONDUITS WITH 18' OR LESS CLEARANCE, EXCEPT THOSE COVERED BY NOTE 1 ABOVE, SHALL BE SUPPORTED BY CASE 2 PIPE SUPPORT DETAIL. 3. ALL NON-METALLIC CROSSING PIPELINE AND CONDUITS NOT COVERED BY THE ABOVE NOTES 1 OR 2 SHALL BE SUPPORTED BY THE USE OF CASE 2 PIPE SUPPORT DETAIL. 4. BACKFILL SHALL BE BROUGHT UP UNIFORMLY ALONG BOTH SIDES OF PROTECTED PIPE AND SUPPORT SO AS TO INDUCE NO UNBALANCED FORCE. 5. CROSSING METALLIC CONDUITS 3 INCHES (NOMINAL SIZE) AND LARGER SHALL BE BACKFILLED TO 2'-0' BELOW THE CROSSING CONDUIT WITH MATERIALS AS DESCRIBED IN THE DISTRICT'S STANDARD SPECIFICATIONS FOR PIPE BEDDING AND TRENCH BACKFILL. THE TRENCH SHALL THEN BE BACKFILLED TO 12 INCHES OVER THE CONDUIT WITH CLEAN, MOISTENED SAND (SAND EQUIVALENT OVER 30), BROUGHT UP IN LAYERS OF NOT OVER 6 INCHES AND MECHANICALLY COMPACTED TO A RELATIVE DENSITY OF AT LEAST 90% WITH SPECIAL ATTENTI❑N BEING GIVEN TO THE PIPE BOTTOM AND HAUNCH AREAS OF THE BACKFILL. 6. IF BEDDING IS REMOVED FROM THE EXISTING PIPE THAT WILL REMAIN IN PLACE, THE PIPE SHALL BE EMBEDDED WITH CONCRETE AT NO EXTRA COST TO THE AGENCY. 7. UNLESS OTHERWISE INDICATED, CONCRETE SHALL BE CLASS 420-C-2000. CONDUCT OF CONSTRUCTION THE CONTRACT DRAWINGS AND SPECIFICATI❑NS REPRESENT THE FINISHED WORK AND ENGINEER'S RIGHT TO INSPECT OR SUSPEND THE WORK IS LIMITED THERETO. THE ENGINEER WILL NOT BE RESPONSIBLE FOR AND WILL NOT HAVE CONTROL OR CHARGE OF C❑NSTRUCTI❑N MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES, OR FOR SAFETY PRECAUTI❑NS AND PROGRAMS IN C❑NNECTI❑N WITH THE WORK. THE ENGINEER WILL NOT BE RESPONSIBLE FOR AND WILL NOT HAVE CONTROL OR CHARGE OVER THE ACTS OR ❑MISSI❑NS OF THE CONTRACTOR, SUBCONTRACTORS, OR ANY OF THEIR AGENTS OR EMPLOYEES, OR ANY OTHER PERSONS PERFORMING ANY DF THE WORK. PRIVATE ENGINEER'S NOTICE TO CONTRACTOR THE EXISTENCE AND L❑CATI❑N OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES SHOWN ON THESE PLANS ARE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. THESE L❑CATI❑NS ARE APPROXIMATE AND SHALL BE CONFIRMED BY THE CONTRACTOR, SO THAT ANY NECESSARY ADJUSTMENT CAN BE MADE IN ALIGNMENT AND/OR GRADE OF THE PROPOSED IMPROVEMENT. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT ANY UTILITY LINES SHOWN AND ANY OTHER LINES NOT ON RECORD ❑R NOT SHOWN ON THESE PLANS. CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE C❑NDITI❑NS DURING THE COURSE OF C❑NSTRUCTI❑N OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY) THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. REV. NO. DATE BY APRVD DESCRIPTION REVIEWED BY: car CITY OF ONTARIO GENERAL NOTES 1. ALL WORK SHALL BE DONE IN STRICT CONFORMANCE WITH THE CURRENT CITY OF ONTARIO STANDARD SPECIFICATI❑NS AND STANDARD DRAWINGS AND CURRENT APWA STANDARD SPECIFICATIONS AND STANDARD DRAWINGS UNLESS OTHERWISE APPROVED BY THE CITY ENGINEER. 2. ANY CONTRACTOR PERFORMING WORK ON THIS PROJECT SHALL FAMILIARIZE HIMSELF/HERSELF WITH THE SITE AND SHALL BE SOLELY RESPONSIBLE FOR ANY DAMAGE TO EXISTING FACILITIES RESULTING DIRECTLY OR INDIRECTLY FROM HIS/HER ❑PERATI❑NS, WHETHER OR NOT THE FACILITY IS SHOWN ON THESE PLANS. 3. ALL ❑BSTRUCTI❑NS WITHIN THE AREA TO BE IMPROVED SHALL BE REMOVED AND/OR RELOCATED AT THE DIRECTION OF THE CITY ENGINEER. UTILITIES ARE TO BE RELOCATED BY THEIR RESPECTIVE OWNERS UNLESS NOTED OTHERWISE. THE CONTRACTOR IS REFERRED TO SECTI❑N 5 OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION. 4. UTILITY LINE L❑CATI❑NS WERE TAKEN FROM AVAILABLE RECORD DATA AND WERE NOT LOCATED IN THE FIELD, UNLESS OTHERWISE NOTED ON THE PLAN. THE CONTRACTOR IS REFERRED TO SECTI❑N 5 OF THE STANDARD SPECIFICATI❑NS. 5. IN CASE OF ANY ACCIDENTS INVOLVING SAFETY MATTERS COVERED BY SECTI❑N 6409(B) OF THE CALIFORNIA LABOR CODE, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE STATE DIVISI❑N OF INDUSTRIAL SAFETY. 6. STATE LAW (SB 3019) REQUIRES THE CONTRACTOR TO CONTACT UNDERGROUND SERVICE ALERT AND OBTAIN AN IDENTIFICATI❑N NUMBER PRI❑R TO THE ISSUANCE OF CITY'S ENCROACHMENT PERMIT. THE CONTRACTOR SHALL NOTIFY UNDERGROUND SERVICE ALERT AT 1-800-227-2600 A MINIMUM OF 48 HOURS IN ADVANCE OF ANY C❑NSTRUCTI❑N ACTIVITIES. 7. PRIOR TO THE START OF ANY WORK THE CONTRACTOR SHALL OBTAIN A BUSINESS LICENSE FROM THE CITY OF ONTARIO. THE CONTRACTOR SHALL ALSO OBTAIN AN ENCROACHMENT PERMIT FROM THE ENGINEERING DEPARTMENT NO LESS THAN 48 HOURS PRIOR TO START OF ANY CONSTRUCTION WITHIN THE PUBLIC RIGHT-OF-WAY. 8. THE CONTRACTOR SHALL OBTAIN A TRAFFIC CONTROL PERMIT 48 HOURS PRI❑R TO TIME OF CONSTRUCTION WITHIN THE PUBLIC RIGHT-OF-WAY. THE CONTRACTOR IS REFERRED TO SECTI❑N 7-10.3 OF THE STANDARD SPECIFICATI❑NS FOR PUBLIC WORKS CONSTRUCTION. 9. THE CONTRACTOR SHALL RENEW OR REPLACE ANY EXISTING TRAFFIC STRIPING AND/OR PAVEMENT MARKINGS, WHICH DURING HIS ❑PERATI❑NS HAVE BEEN EITHER REMOVED OR THE EFFECTIVENESS OF WHICH HAS BEEN REDUCED. RENEWAL OF TRAFFIC STRIPING AND MARKINGS SHALL BE DONE USING REFLECTIVE THERMO-PLASTIC MARKINGS IN CONFORMANCE WITH SECTION 84 & 85 OF THE CALTRANS STANDARD SPECIFICATI❑NS AND AS DIRECTED BY THE ENGINEER. ALL REGULATORY, WARNING, AND GUIDE SIGNS SHALL HAVE 3M DIAMOND, VIP GRADE SHEETING WITH SERIES 1160 PROTECTIVE OVERLAY FILM. 10. THE LAND SURVEYORS ACT, SECTION 8771 OF THE BUSINESS & PR❑FESSI❑NAL CODE, AND SECTI❑NS 732.5, 1492-5, 1810-5 OF THE STREETS AND HIGHWAY CODE REQUIRE THAT SURVEY MONUMENTS SHALL BE PROTECTED AND PERPETUATED. 'IT SHALL BE THE RESPONSIBILITY OF THE DEVELOPER OR OTHERS PERFORMING THE C❑NSTRUCTI❑N WORK TO RETAIN A QUALIFIED REGISTERED CIVIL ENGINEER AND/OR LICENSED LAND SURVEYOR PRI❑R TO THE START OF C❑NSTRUCTI❑N TO LOCATE, REFERENCE AND FILE THE NECESSARY CORNER RECORDS WITH THE COUNTY SURVEYOR'S OFFICE FOR SURVEY CONTROL POINTS/ MONUMENTS THAT EXIST AS SHOWN ON RECORDED TRACT MAPS, PARCEL MAPS, RECORDS OF SURVEYS AND HIGHWAY MAPS, AND MAY BE DISTURBED OR DAMAGED BY THE PROPOSED C❑NSTRUCTI❑N.' AFTER THE COMPLETION OF THE PROPOSED C❑NSTRUCTI❑N, SAID MONUMENTS AND/OR CONTROL SURVEY POINTS SHALL BE RESET TO THE NEW SURFACE IN ACCORDANCE WITH CURRENT PR❑FESSI❑NAL LAND SURVEYING PRACTICES. CORNER RECORDS SHALL BE FILED WITH THE COUNTY SURVEYOR FOR ALL THE NEW MONUMENTS SET. 11. THE DEVELOPER SHALL PR❑VIDE THE CITY WITH A COMPLETED SET OF 'AS BUILT', MYLAR DRAWINGS PRIOR TO THE FINAL INSPECTI❑N. 12. A CITY ACCEPTED/APPROVED SET OF PLANS SHALL BE KEPT ON THE JOB SITE AT ALL TIMES. 13. A PRE-C❑NSTRUCTI❑N MEETING SHALL OCCUR PRI❑R TO CONSTRUCTI❑N. ATTENDEES SHALL INCLUDE A CITY REPRESENTATIVE AND THE CONTRACTOR WHO WILL PERFORM THE WORK. 'CUT -SHEETS' SHALL BE PROVIDED TO THE CITY AT THIS MEETING FOR ITS REVIEW. 14. CITY ACCEPTANCE OF PLANS DOES NOT RELIEVE THE DEVELOPER FROM RESPONSIBILITY FOR THE C❑RRECTI❑N OF ERROR AND OMISSION DISCOVERED DURING C❑NSTRUCTI❑N. UPON REQUEST OF THE CITY INSPECT❑R, THE REQUIRED PLAN REVISIONS SHALL BE PROMPTLY SUBMITTED TO THE CITY ENGINEER FOR REVIEW. 15. ANY REQUIRED RIGHT -❑F -WAY OR EASEMENT SHALL BE DEDICATED TO AND ACCEPTED BY THE CITY PRIOR TO COMMENCEMENT OF CONSTRUCTION OF THE IMPROVEMENTS WITHIN THE REQUIRED RIGHT-OF-WAY OR EASEMENT. CITY OF FONTANA GENERAL NOTES 1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISI❑NS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS C❑NSTRUCTI❑N (GREEN BOOK). ALL REFERENCE SPECIFICATI❑NS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED. 2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE GREEN BOOK, THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RES❑LUTI❑N. 3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 4. C❑NSTRUCTI❑N PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRI❑R TO THE START OF ANY WORK. INSPECTI❑N COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT -❑F -WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610. 5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS, AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST N❑N-METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 6. IT SHALL BE THE RESP❑NSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATI❑N OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. 8. THE WALLS AND FACES OF ALL EXCAVATORS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SH❑RING, SL❑PING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT. 9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT -❑F -WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE. 10. THE LOCATI❑NS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION) HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE L❑CATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTI❑N TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATI❑N. 11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES UNCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISI❑N, LANDSCAPING, LANDSCAPE IRRIGATI❑N, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRI❑R TO WORK AROUND THEIR FACILITIES. 12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITH❑UT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE ❑PERATI❑N AND WATER REQUIREMENTS. PROJECT ANAGER 11- 17- I 1. DATE SCALE AS SHOWN Bar Scale shown below is one inch on original drawing. If NOT one inch on this sheet, adjust scales accordingly. 0" =a 1" Inle nd Empire Utilities Agency A MUNICIPAL WATER DISTRICT CITY OF FONTANA GENERAL NOTES CONTINUED 13. STATIONING REFERS TO THE CENTERLINE OF SEWER EXCEPT WHERE OTHERWISE NOTED. 14. ADEQUATE C❑NTRUCTI❑N CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATI❑N OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTI❑N. 15. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITH❑UT PRI❑R NOTIFICATION TO THE CITY ENGINEER. 16. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS C❑NSTRUCTI❑N SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRI❑R TO C❑NSTRUCTI❑N S❑ THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT. 17. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE C❑NSTRUCTI❑N AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 18. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES. 19. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT -❑F -WAY DURING C❑NSTRUCTI❑N WITH❑UT PRI❑R WRITTEN APPROVAL. 20. NO TRENCH BACKFILL SHALL TAKE PLACE WITH❑UT PRIOR APPROVAL OF THE CITY INSPECT❑R. 21. A GE❑TECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED. 22. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTI❑N OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS. 23. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE. 24. IF SEWER C❑NSTRUCTI❑N IS TO BE DONE IN PHASES, THE CONTRACTOR SHALL PROVIDE A TERMINAL CLEANOUT AT THE PHASE BOUNDARYM NOT MORE THAN 150 FEET FROM THE DOWNSTREAM MANHOLE, SEE CITY OF FONTANA STANDARD DETAIL FOR TERMINAL CLEANOUT. 25. SANITARY SEWER LINES SHALL BE CONSTRUCTED OF BELL AND SPIG❑T OR BAND SEAL TYPE VITRIFIED CLAY PIPE (V.C.P.) EXTRA STRENGTH CLASS AND SHALL CONFORM TO THE PROVISI❑NS OF THE ASTM DESIGNATION C700 FOR V.C.P. 26. NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY WITH❑UT PRIOR APPROVAL OF THE CITY ENGINEER. 27. SHORT VCP STUBS WITH FLEXIBLE COMPRESSION JOINTS SHALL BE USED AT MANHOLE WALLS TO ALLOW FOR MINOR DEFLECTI❑NS IN ALIGNMENT. 28. PRI❑R TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE EXISTING FACILITIES, AND VERIFY ELEVATION AND L❑CATI❑N OF CONNECTIONS. CITY APPROVAL OF CONNECTIONS TO EXISTING FACILITIES DOES NOT IMPLY CORRECTNESS OF ELEVATIONS OR L❑CATIONS SHOWN ON THE PLANS. 29. ALL 4' HOUSE LATERALS SHALL BE INSTALLED AT A 2% MINIMUM GRADE UNLESS OTHERWISE APPROVED BY THE CITY ENGINEER. 30. TERMINATE ALL 4' HOUSE SEWER LATERALS 3 FEET INSIDE THE LOT WITH A PLUG 12' BELOW THE GROUND SURFACE. WHEN PUBLIC UTILITY EASEMENTS EXIST NEXT TO THE STREET RIGHT OF WAY, THE LATERAL SHALL TERMINATE 3 FEET INSIDE THE LOT AS MEASURED FROM THE UTILITY EASEMENT. 31. THE SEWER CONTRACTOR SHALL STAMP AN ?S? IN THE FACE OF THE CURB AT THE LOCATI❑N OF THE SEWER LATERAL. 32. IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND ALL AFFECTED AGENCIES IMMEDIATELY. 33. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, . INSPECTED AND APPROVED. 34. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRI❑R TO PAVING OF STREETS. 35. APPROVED S❑IL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRI❑R TO PLACEMENT. 36. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING. 37. UPON C❑MPLETI❑N OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTI❑N OF THE CITY TRAFFIC ENGINEER. 38. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PR❑VIDE RECORD DRAWINGS TO THE CITY ENGINEER. DECLARATION OF ENGINEER OF RECORD I HEREBY DECLARE THAT IN MY PROFESSI❑NAL ❑PINION, THE DESIGN OF THE IMPROVEMENTS AS SHOWN ON THESE PLANS COMPLIES WITH THE CURRENT ENGINEERING STANDARDS AND PRACTICES. AS THE ENGINEER IN RESPONSIBLE CHARGE OF THE DESIGN OF THESE IMPROVEMENTS, I ACCEPT FULL RESPONSIBILITY FOR SUCH DESIGN. I UNDERSTAND AND ACKNOWLEDGE THAT THE PLAN CHECK OF THESE PLANS BY THE CITY IS A REVIEW FOR THE LIMITED PURPOSE OF ENSURING THAT THESE PLANS COMPLY WITH CITY STANDARDS/ PROCEDURES AND OTHER APPLICABLE CODES AND ORDINANCES. THE PLAN REVIEW PROCESS IS NOT A DETERMINATI❑N OF THE TECHNICAL ADEQUACY OF THE DESIGN OF THE IMPROVEMENTS. SUCH PLAN CHECK DOES NOT THEREFORE RELIEVE ME • MY DES N RE ❑NSIBILITY. ALLEN W. MARTIN RCE' 38463 OFFICE ADDRESS 6075 Kimball Avenue Chino, California 91708 Telephone (909) 993-1600 MAILING ADDRESS Post Office Box 9020 Chino Hills, California 91709 \\i/it,) Ih DE CITY OF FONTANA: DWG NO. 5510 CITY OF ONTARIO: PROJECT NO. M-952 GENERAL NOTES GREEN FIBER 11591 ETIWANDA AVENUE 8" NON -RECLAIMABLE WASTEWATER LATERAL SHEET NO. 2 of 5 PROJECT NO. CW17101.01 .. DRAWING NO. D3373-002 5E10