SEWER IMPROVEMENT PLAN
SIERRA LAKES PARKWAY
z
5 � 3TE��
FORQ N. FRONTAGE RD. m
SEWER GENERAL NOTES
1.
ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE
UNIT
STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK'. ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE
OINSTALL
THE LATEST EDITION UNLESS OTHERWISE NOTED.
2.
WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO
OINSTALL
PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR
EA.
RESOLUTION.
3.
ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
4.
CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR
44
TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY
EA./L.F.
WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610.
5.
THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA
EA.
MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER.
6.
IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL
TIMES.
7.
THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM
THE CALIFORNIA STATE DIVISION OF INDUSTRIAL
SAFETY.
8.
THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE
GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA.
-TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT.
9.
NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE.
10.
THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF
THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER
PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING
DAYS BEFORE EXCAVATION.
11.
THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC,
CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND
CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES.
12.
THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION.
CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS.
13.
STATIONING REFERS TO THE CENTERLINE OF SEWER EXCEPT WHERE OTHERWISE NOTED.
14.
ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE
PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING
DURING CONSTRUCTION.
15.
THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCHMARKS WITHOUT PRIOR NOTIFICATION TO THE
CITY ENGINEER.
16.
REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE
DONE BY A REGISTERED CML ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF
THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO
MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
17.
THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE
MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES.
18.
THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES.
19.
THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY
ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL
20.
NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR.
21.
A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE
RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED.
22.
-CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE
SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS.
23.
ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE.
24.
IF SEWER CONSTRUCTION IS TO BE DONE IN PHASES, THE CONTRACTOR SHALL PROVIDE A TERMINAL CLEANOUT AT THE PHASE BOUNDARY, NOT
MORE THAN 150 FEET FROM THE DOWNSTREAM MANHOLE, SEE CITY OF FONTANA STANDARD DETAIL FOR TERMINAL CLEANOUT.
s f �
IMPORTANT NOTICE
SECTION 4212/4217 OF THE GOVERNMENT
CODE REQUIRES A DIG ALERT IDENTIFICATION
NUMBER BE ISSUED BEFORE A PERMIT TO
EXCAVATE WILL BE VALID.
A Rr_T
FA
DIAL TWO WORKING
BEFORE DAYS BEFORE
YOU DIG YOU DIG
T13LL FREE -800-227-2600
A PUBLIC SERVICE BY UIB SERVICE ALER'
TRACT 18881 (ON-SITE)
CITY OF FONTANA
25. SANITARY SEWER LINES SHALL BE CONSTRUCTED OF BELL AND SPIGOT OR BAND SEAL TYPE VITRIFIED CLAY PIPE (V.C.P.) EXTRA STRENGTH
CLASS AND SHALL CONFORM TO THE PROVISIONS OF THE ASTM DESIGNATION C700 FOR V.C.P.
26. NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER.
27. SHORT VCP STUBS WITH FLEXIBLE COMPRESSION JOINTS SHALL BE USED AT MANHOLE WALLS TO ALLOW FOR MINOR DEFLECTIONS IN ALIGNMENT.
28. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE EXISTING FACILITIES, AND VERIFY ELEVATION AND LOCATION OF CONNECTIONS. CITY
APPROVAL OF CONNECTIONS TO EXISTING FACILITIES DOES NOT IMPLY CORRECTNESS OF ELEVATIONS OR LOCATIONS SHOWN ON THE PLANS.
29. ALL 4" HOUSE LATERALS SHALL BE INSTALLED AT A 2% MINIMUM GRADE UNLESS OTHERWISE APPROVED BY THE CITY ENGINEER.
30. TERMINATE ALL 4" HOUSE SEWER LATERALS 3 FEET INSIDE THE LOT WITH A PLUG 12" BELOW THE GROUND SURFACE. WHEN PUBLIC UTILITY
EASEMENTS EXIST NEXT TO THE STREET RIGHT OF WAY,
THE LATERAL SHALL TERMINATE 3 FEET INSIDE THE LOT AS MEASURED FROM THE UTILITY EASEMENT.
31. THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER LATERAL
32. IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER
AND ALL AFFECTED AGENCIES IMMEDIATELY.
33. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED.
34. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS.
35. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT.
36. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON
COMPLETION OF PAVING.
37. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES
TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
38. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE
CITY ENGINEER.
PRIVATE ENGINEER'S N0110E TO CONTRACTOR
1. CONTRACTOR AGREES THAT THEY SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF
CONSTRUCTION, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO
NORMAL WORKING HOURS. THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE CITY, OWNER AND ENGINEER HARMLESS FROM ANY AND ALL
LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE
SOLE NEGLIGENCE OF THE OWNER OR ENGINEER.
2. ALL UNDERGROUND UTILITIES OR STRUCTURES, REPORTED OR FOUND IN PUBLIC RECORDS, ARE INDICATED WITH THEIR APPROXIMATE LOCATION AND
EXTENT. THE OWNER, BY ACCEPTING THESE PLANS OR PROCEEDING WITH THE IMPROVEMENTS HERON, AGREES TO ASSUME LIABILITY AND HOLD THE
ENGINEER HARMLESS FOR ANY DAMAGES RESULTING FROM THE EXISTENCE OF UNDERGROUND UTILITIES OR STRUCTURES NOT REPORTED OR
INDICATED ON PUBLIC RECORDS, OR THOSE CONSTRUCTED IN VARIANCE WITH REPORTED OR RECORD LOCATIONS. THE CONTRACTOR IS REQUIRED TO
TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES OR STRUCTURES SHOWN AND ANY OTHERS FOUND AT THE SITE, IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE OWNERS OF ALL UTILITIES OR STRUCTURES CONCERNED BEFORE STARTING WORK.
3. THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS.
ALL CHANGES TO THESE PLANS MUST BE REQUESTED IN WRITING AND MUST BE APPROVED BY THE ENGINEER OF RECORDED OF THESE PLANS.
4. THE ENGINEER DOES NOT RECOMMEND OR ENDORSE THE USE OF ASBESTOS CEMENT WATER PIPE OR ANY PRODUCTS CONTAINING ASBESTOS DUE
TO THE HEALTH HAZARD CONNECTED WITH SUCH PRODUCTS. SPECIFICATIONS HEREON OF ANY SUCH PRODUCT IS AT THE SOLE DIRECTION OF THE
JURISDICTION AGENCY CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL CONSTRUCTION, CONNECTION AND REMOVAL OF ASBESTOS PRODUCTS
AND SHALL ADHERE TO ALL O.S.H.A. AND E.P.A. GUIDELINES TO MINIMIZE HEALTH HAZARDS.
5. QUANTITIES SHOWN HEREON ARE PROVIDED FOR BONDING PURPOSES ONLY. CONTRACTORS SHALL BE RESPONSIBLE FOR DETERMINING HIS OWN
QUANTITIES PRIOR TO BIDDING FOR CONSTRUCTION. THE ENGINEER IS NOT RESPONSIBLE FOR THIS DISCREPANCIES IN FINAL CONSTRUCTION
QUANTITIES.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO VERIFY ALL DIMENSIONS AND CONDITIONS SHOWN HEREON AT THE JOB SITE PRIOR TO
ANY CONSTRUCTIONS. SHOULD HERE BE ANY DISCREPANCY, ADAMS STREETER CIVIL ENGINEERS, INC. SHALL BE NOTIFIED AT ONCE. SUBSTANTIAL
REVISIONS TO THE PLAN SHALL BE APPROVED BY THE ENGINEER IN WRITING PRIOR TO IMPLEMENTATION OF SUCH REVISIONS IN THE FIELD.
BEGINNING OF CONSTRUCTION MEANS ACCEPTANCE OF CONDITIONS.
7. CONTRACTOR IS TO NOTIFY "UNDERGROUND SERVICE ALERT' AT 1-800-422-4133 AT LEAST TWO (2) WORKING DAYS PRIOR START OF WORK SO AS
TO HAVE LOCATION OF UNDERGROUND UTILITIES LOCATED AND MARKED FOR CONSTRUCITON/SAFETY COORDINATION
8. CONTRACTOR SHALL COMPLY WITH ALL REQUIREMENTS OF FEDERAL, STATE AND LOCAL LAWS AND REGULATIONS PERTAINING TO THE CLEAN AIR AND
CLEAN WATER ACT.
SHOULD CONSTRUCTION OF THE REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN TWO
YEARS OF THE DATE OF APPROVAL SHOWN HEREON
AND CARRIED FORTH IN A DILIGENT MANNER, THE
CITY ENGINEER MAY REQUIRE REVISIONS TO THE
REV. PLANS TO BRING THEM INTO CONFORMANCE WITH
REVISION DESCRIP110N DATE ENGR. 1 CITY DATE STANDARDS IN EFFECT.
m
VICINITY MAP
N. T. S.
HIGLAND I AVE.
SEWER CONSTRUCTION NOTES:
NO.
DESCRIPTION
UNIT
OTY.
OINSTALL
8" V.C.P., C700 EXTRA STRENGTH, SEWER, AND REPAIR TRENCH PER CITY STD. PLAN NO. 1008.
LF.
3,668
OINSTALL
STANDARD CAST IN PLACE MANHOLE FOR SEWER PER CITY OF FONTANA STD. PLAN NO. 2001 (I.D. = 48").
EA.
19
OJOIN
PROPOSED 8" V.C.P. SEWER TO EXISTING MANHOLE
EA.
1
44
INSTALL 4" V.C.P., C700 EXTRA STRENGTH, SEWER LATERAL AND CLEANOUT PER CITY OF FONTANA STD. PLAN NO. 2005 & 2006.
EA./L.F.
96/3,352
O5
INSTALL BACK -WATER VALVE PER CALIFORNIA PLUMBING CODE, LATEST EDITION.
EA.
18
*LOTS REQUIRING BACK -WATER VALVES: 15, 16, 24, 25, 30, 31, 32, 55, 56, 61, 62, 70, 71, 72, 73, 81, 82, 91.
Prepared Under The
Supervision Of:
��QROFESS/�,9
A. PS k ST,p�, l F�
Off' F,+ y DRAWN BY:
W � C 70862 m ADAMS STREETER Cin
� Z CIvil Engineers
y ss caponEe Part, Inrim, CA 92606 1 949.4741M I - � DESIGNED BY:
OIV1`\FO���Q li.S Date: 9/23/16 CHECKE B :
F CA NS
NICHOLAS A. STREETER R.C.E. 70862
LEGEND
- -S- -
EXISTING SANITARY SEWER MAINLINE
-�
PROPOSED SEWER- LINE WITH FLOW DIRECTION
8+19.11
PROPOSED SEWER STATIONING
MH #1
SANITARY SEWER MANHOLE WITH
MANHOLE NUMBER CALLOUT
P.O.0
POINT OF CONNECTION
P.U.E.
PUBLIC UTILITY EASEMENT
SHEET INDEX
TITLE SHEET, CONSTRUCTION NOTES & QUANTITIES 1
INDEX MAP 2
SEWER PLAN AND PROFILE 3-11
CITY OF FONTANA, CALIFORNIA
SEWER IMPROVEMENT PLANS
ON-SITE SANITARY SEWER SCALE:
fAP!AV�ED
MPROVEMENT PLAN FOR TRACT 18881 As Noted
DATE:
TITLE SHEET 9/23/2016
DATE. l� ,�3 �/G DRAWING NO.: 1
RI .AR�o SANDOVAI R.C.E. 51152 5535
U
0
a-
0
N
U
O
-6
W
0
0
N
N
Q
cn
a
Q
a,
N
I
w
w
I
cn
w
U)
z
0
I
0
N
Ln
X
i
Q)
3
W
i
Q)
0
i
V)
W
0
Q
E
Q)
>
a
Q)
0
cn
T)
0
N
I
i
Ln
0
N
i
WA