Loading...
HomeMy WebLinkAbout4866-21" '' , CONSTRUCTIONNOTES P-1 EXIS77NG SIX (6) 1 1/2" HIGH DENSITY POL YETHYLENE (HDPE) CONDUITS. F6] EXIS77NG P48 SPLICE VA UL T PULL BOX. F81 FURNISH AND INSTALL ONE (1) 96 -STRAND SMFO CABLE /N THE BLUE 1 1/2» HDPE CONDUIT. WHERE CABLE PASSES THROUGH SPLICE VAULT COIL 50' OF 96 -STRAND SMFO CABLE. SEE SPECIAL PROWSIONS FOR DETAILS. [1�EX/SANG HDPE 6 PACK WITH EX/SANG 96 -STRAND SMFO CABLE TO REMAIN. 15 DISCONNECT 96 -STRAND SMFO CABLE FROM WIC INSIDE TRAFFIC SIGNAL CONTROLLER CABINET AND PULL BACK TO NEAREST P48 SPLICE VA UL T. FROM SPLICE VAUL T FURNISH AND INSTALL 12 -STRAND SMFO CABLE /N /TS PLACE, 7FRM/NA TF PER FIBER OPTIC SCHEDULE. 2� FURNISH AND INSTALL SPL/CE ENCLOSURE AND FUS/ON SPL/CE APPROPR/ATE STRANDS OF 96 -STRAND SMFO CABLE FROM SIERRA LAKES PKWY/AGUSTA EAST TO 96 -STRAND SMFO CABLE FROM SIERRA LAKES PKWY/S/ERRA A VE PER FIBER OP11C SCHEDULE. ALSO FUS/ON SPLICE TO APPROPRIATE STRANDS OF 12 -STRAND SMFO CABLE GO/NG TO TRAFF/C SIGNAL CONTROLLER CAB/NET AT SIERRA LAKES PKWY/S/ERRA A lE PER FIBER OP11C SCHEDULE. w ♦ I , r TO EAST A ro 1"=20' 20 10 0 20 40 60 AUTOCAD FL.ENAME: S:\TRAFFIC\Lauren\Summit Ave Fiber Installation\basemapAdwg