HomeMy WebLinkAbout4866-20CONSTRUCTIONNOTES
nl EX/S17NG SIX (6) 1 1/2" HIGH DENS/TY POL METHYLENE (HDPE) CONDU/TS.
F-2] EXlS11NG 2" CONDUIT.
F41 EX/SIIN6 TRAFFIC SIGNAL CONTROLLER.
F6] EX/S71NG P48 SPL/CE CAUL T PULL BOX.
"F71 EX/S71NG 6 PAIR 122 AWG COMMUNICATION INTERCONNECT CABLE TO REMAIN /N PLACE.
F.31 FURNISH AND INSTALL ONE (1) 96 -STRAND SMFO CABLE IN THE BLUE 1 1/2" HDPE CONDUIT.
WHERE CABLE PASSES THROUGH SPL/CE VAULT, COIL 50' OF 96-S77?AND SMFO CABLE. SEE
SPEC/AL PROMS/ONS FOR DETAILS.
F91 FURNISH AND INSTALL 12-57RAND SMFO CABLE IN EX/SUNG COMMUN/CA 110N CONDU/T.
F10] FURNISH AND INSTALL WALL INTERCONNECT CENTER (WIC) AND SPL/CE 7RAY /N EXlS11NG TRAFFIC
CONTROLLER CAB/NET. INSTALL AND TERM/NATE 12-S77?AND SMFO CABLE PER FIBER ASSIGNMENT
SCHEDULE.
FIJI FURNISH AND INSTALL SPL/CE ENCLOSURE AND FUS/ON SPLICE SIX (6) STRANDS OF 96 -STRAND
SMFO CABLE TO THE APPROPRIATE STRANDS OF 12 -STRAND SMFO CABLE PER FIBER ASSIGNMENT
SCHEDULE. COIL MINIMUM OF 16" OF 12 -STRAND SMFO AND 50' OF 96 -STRAND SMFO CABLE FOR
SLACK IN SPLICE VAULT.
[-1-21 FURNISH AND INSTALL FIBER OPTIC MODEMS IN TRAFFIC CONTROLLER CABINET. COMPLETE
CONNEC77ON BETWEEN WIC, CONTROLLER MODEM, AND VIDEO DETECTION MODEM.
w f
w • �
"t,
w •1
w V� I
w
1"=20'
20 10 0 20 40 60
MOCAD nU NMF- S:\TRAFFIC\Lauren\Summit Ave Fiber Installation\basemapkdwg