Loading...
HomeMy WebLinkAbout4866-18... F-11 F2 �a R4 F6] F71 F-81 CONSTRUCTIONNOTES EX/S71NG SIX (6) 1 1/2" HIGH DENS/TY POL METHYLENE (HDPE) CONDUITS EXISTING 2" CONDUIT. EX/S71NG PULL BOX (16 OR 16E) EXISTING TRAFFIC SIGNAL CONTROLLER. EXISTING P48 SPLICE VA UL T PULL BOX. EXlS11NG 6 PAIR #22 AWG COMMUNICA 770N INTERCONNECT CABLE TO REMAIN IN PLACE. FURNISH AND INSTALL ONE (1) 96 -STRAND SMFO CABLE IN THE BLUE 1 1/2" HDPE CONDUIT. WHERE CABLE PASSES THROUGH SPLICE VAULT, COIL 50' OF 96-S77?AND SMFO CABLE. SEE SPECIAL PROVISIONS FOR DETAILS. FURNISH AND INSTALL 12-S77?AND SMFO CABLE IN EXISTING COMMUNICA TION CONDUIT. FURNISH AND /l1/STALL WALL INTERCONNECT CENTER (WC) AND SPLICE TRAY /N EXlS11NG TRAFFIC CONTROLLER CAB/NET. INSTALL AND TERM/NATE 12-SI7?AND SMFO CABLE PER FIBER ASSIGNMENT SCHEDULE. Fl 1] FURNISH AND INSTALL SPLICE ENCLOSURE AND FUSION SPLICE SIX (6) STRANDS OF 96 -STRAND . , SMFO CABLE TO THE APPROPRIA TE STRANDS OF 12 -STRAND SMFO CABLE PER FIBER ASSIGNMENT SCHEDULE. COIL MINIMUM OF 16' OF 12-S77?AND SMFO AND 50' OF 96-S77?AND SMFO CABLE FOR SLACK IN SPLICE VA UL T. F12 FURNISH AND INSTALL FIBER OP77C MODEMS IN TRAFFIC CONTROLLER CABINET. COMPLETE CONNECTION BETWEEN WIC, CONTROLLER MODEM, AND VIDEO DETECTION MODEM. r. f t TD WEsj 1"=20' 20 10 0 20 40 60 AUTOCAD FILENAME: S:\TRAFFIC\Lauren\Summit Ave Fber Installation\basemapkdwg