HomeMy WebLinkAbout4866-17_,
w O
F111 FURNISH AND INSTALL SPL /CE ENCLOSURE AND FUSION SPLICE SIX (6) STRANDS OF 96 -STRAND
SMFO CABLE TO THE APPROPRIA TE STRANDS OF 12-S77?AND SMFO CABLE PER FIBER ASSIGNMENT
SCHEDULE. COIL MIN/MUM OF 16' OF 12 -STRAND SMFO AND 50' OF 96-S77?AND SMFO CABLE FOR
SLACK /N SPLICE VA UL T.
[12 FURNISH AND INSTALL FIFER OPTIC MODEMS /N TRAFFIC CONTROLLER CABINET. COMPLETE
CONNECTION BETHEEN WIC, CONTROLLER MODEM, AND IWlDEO DETECTION MODEM.
1"-20'
20 10 0 20 40 60
o�
1217
C�Q
AUTOCAD FILENAME: S:\TRAFFlC\Lauren\Summit Ave Fiber Installation\basemapA dwg
CONSTRUCTIONNOTES
P-1EX/S71NG
SIX (6) 1 1/2" HIGH DENS/TY POL METHYLENE (HDPE) CONDUITS.
r2
EX/SANG 2" CONDUIT.
FJJ
EX/SANG PULL BOX (1b' OR #6E).
�4
EX/SANG TRAFFIC SIGNAL CONTROLLER.
�6
EX/SJING P48 SPLICE VAULT PULL BOX.
-.•� F71
EXIS77NG 6 PAIR 122 AWG COMMUNlCA170N INTERCONNECT CABLE TO REMA/N /N PLACE.
F.31'.�
FURNISH AND INSTALL ONE (1) 96 -STRAND SMFO CABLE /N THE BLUE 1 1/2HDPE CONDUIT.
WHERE CABLE PASSES THROUGH SPLICE VAULT, COIL 50' OF 96 -STRAND SMFO CABLE. SEE
SPEC/AL PRODS/ONS FOR DETAILS.
�9
FURN/SH AND INSTALL 12 -STRAND SMFO CABLE IN EX/STING COMMUN/CA 11ON CONDUIT.
n10
FURNISH AND INS TALL WALL INTERCONNECT CENTER (WIC) AND SPLICE TRA Y /N EXIST/NG TRAFF/C
CONTROLLER CAB/NET. INSTALL AND TERM/NATE 12 -STRAND SMFO CABLE PER FIBER ASSIGNMENT
SCHEDULE.
w O
F111 FURNISH AND INSTALL SPL /CE ENCLOSURE AND FUSION SPLICE SIX (6) STRANDS OF 96 -STRAND
SMFO CABLE TO THE APPROPRIA TE STRANDS OF 12-S77?AND SMFO CABLE PER FIBER ASSIGNMENT
SCHEDULE. COIL MIN/MUM OF 16' OF 12 -STRAND SMFO AND 50' OF 96-S77?AND SMFO CABLE FOR
SLACK /N SPLICE VA UL T.
[12 FURNISH AND INSTALL FIFER OPTIC MODEMS /N TRAFFIC CONTROLLER CABINET. COMPLETE
CONNECTION BETHEEN WIC, CONTROLLER MODEM, AND IWlDEO DETECTION MODEM.
1"-20'
20 10 0 20 40 60
o�
1217
C�Q
AUTOCAD FILENAME: S:\TRAFFlC\Lauren\Summit Ave Fiber Installation\basemapA dwg