HomeMy WebLinkAbout4866-9" 1
0
Fl-ol
CONSTRUCTIONNOTES
EX/SANG SIX (6) 1 1/2" HIGH DENS/TY POL METHYLENE (HDPE) CONDUITS.
EXIS77NG 2" CONDUIT.
EX/SANG PULL BOX (16 OR 16E).
EX/S77NG 7R4FFIC SIGNAL CONTROLLER.
EXIS77NG P48 SPLICE VAULT PULL BOX.
EXIS77NG 6 PAIR 122 A WG COMMUN/CA 770N /NTERCONNECT CABLE TO REMAIN /N PLACE.
FURNISH AND INSTALL ONE (1) 96-S77?AND SMFO CABLE /N THE BLUE 1 1/2" HDPE CONDUIT.
WHERE CABLE PASSES THROUGH SPLICE VAUL T, COIL 50' OF 96-S77?AND SMFO CABLE. SEE
SPECIAL PROWS/ONS FOR DETAILS.
FURNISH AND INSTALL 12 -STRAND SMFO CABLE /N EXISTING COMMUNICA 770N CONDUIT.
FURNISH AND INSTALL WALL INTERCONNECT CENTER (WC) AND SPLICE TRAY IN EX/SANG TRAFFIC
CONTROLLER CABINET. INSTALL AND TERMINATE 12 -STRAND SMFO CABLE PER FABER ASSIGNMENT
SCHEDULE.
F11] FURNISH AND INSTALL SPLICE ENCLOSURE AND FUSION SPLICE SIX (6) STRANDS OF 96 -STRAND
SMFO CABLE TO THE APPROPRIA 7E STRANDS OF 12 -STRAND SMFO CABLE PER FIBER ASSIGNMENT
SCHEDULE COIL MIN/MUM OF 16' OF 12 -STRAND SMFO AND 50' OF 96 -STRAND SMFO CABLE FOR
SLACK /N SPLICE VAUL T.
F12] FURNISH AND INSTALL FIBER OP77C MODEMS /N TRAFFIC CONTROLLER CABINET. COMPLETE
CONNEC710N BE11NEEN WI'C, CONTROLLER MODEM, AND WDEO DE1EC770N MODEM.
r.
1" = 20'
0 20 40
4
60
AUTOCAD FtIENAME: S:\TRAFFIC\Lauren\Summit Ave Fier Insto1krUon\basemapkdwg
0