HomeMy WebLinkAbout4866-7_,
6
r.
CONS TRUCT/ONNOTES
a
F-11EX/SUNG SIX (6) 1 1/2" HIGH DENS/TY POL YETNYLENE (HDPE) CONDO/TS
F2-] EXlS11N6 2' CONDUIT.
F4 EXlS11NG TRAFF/C SIGNAL CONTROLLER.
F,51 EXISANG P48 PULL BOX.
�6 EX/SUNG P48 SPLICE VAULT PULL BOX.
F7] EX/571NG 6 PAIR #22 AWG COMMON/CA AON INTERCONNECT CABLE TO REMAIN IN PLACE.
�8 FURNISH AND INSTALL ONE (1) 96 -STRAND SMFO CABLE /N THE BLUE 1 1/2" HDPE CONDO/T.
WHERE CABLE PASSES THROUGH SPLICE VAULT, COIL 50' OF 96-S77?AND SMFO CABLE. SEE
SPECIAL PRO14S/ONS FOR DETAILS.
ng FURNISH AND /l1/STALL 12 -STRAND SMFO CABLE /N EX/SANG COMMUNICA 17ON CONDUIT.
F101 FURNISH AND INSTALL WALL INTERCONNECT CENTER (WIC) AND SPLICE TRA Y IN EX/S71N6 TRAFFIC
CONTROLLER CAB/NET. INSTALL AND TERM/NA lE' 12-S7RAND SMFO CABLE PER FIBER ASSIGNMENT
SCHEDULE.
nll FURNISH AND INSTALL SPLICE ENCLOSURE AND FUS/ON SPL/CE SV( (6) STRANDS OF 96 -STRAND
SMFO CABLE TO THE APPROPRIATE STRANDS OF 12 -STRAND SMFO CABLE PER FIBER ASSIGNMENT
SCHEDULE. COIL MINIMUM OF 16' OF 12 -STRAND SMFO AND 50' OF 96-S7RAND SMFO CABLE FOR
SLACK /N SPLICE VAULT.
F12] -f URNISH AND INSTALL FIBER OPAC MODEMS IN TRAFf7C CONTROLLER CABINET. COMPLETE
CONNECTION BETWEEN WIC, CONTROLLER MODEM, AND WDE0 DETECAON MODEM.
1� FURNISH AND INSTALL SPLICE ENCLOSURE AND FUS/ON SPL/CE 96 -STRAND SMFD CABLE GO/NG
TO P48 SPLICE FAULT LOCA 70 ON SOUTH HEST CORNER AT BEECH AlE/SUMMITS Alm TO
96 -STRAND SMFO CABLE CONIINU/NG TO SUMMIT A VE/BOULDER WAY AND TO 96 -STRAND SMFO
CABLE CONANU/NG TO BEECH AIiE/FALCON RIDGE PER F/BER ASSIGNMENT SCHEDULE.
!. .
r'i 1
1, 321 ' TO
ANTELOPE LANE
01 ' TO FALCON RIDGE
1" = 20'
20 10 0 20 40 60
Fm EMM
82X TO BOULDER WY
SUMMIT
TO SAPPHIRE WA Y
AUTOCAD FILENAME: S:\TRAFFIC\Lauren\Summit Ave Fiber Installation\basemopkdwg I