Loading...
HomeMy WebLinkAbout4866-5R _.11 R CONSTRUCTION NOTES w .1 w .1 1 DIAL BEFORETWO WORKING' .•IG } Y��DAYS BEFORE, :11 YOU 1.,1 TO SIERRA LAKE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH STANDARDS IN EFFECT. U No. C 40964 Exp. 3-31-11 CIVIL Prepared Under The Supervision Of : DRAWN BY: LP APPROVED BY: •• DH/LP r-4 ( A -Q- NN 1 DATE 3/o7/A CHECKED BY: FELIPE MOLINOS R.C.E. 40964 MP 1888 Y TO SAPPHIRE WAY z Q n U n O AUTOCAD FILENAME: S:\TRAFnC\Lauren\Summit Ave Fiber Installation\basemap&dwg CITY OF FO NTANA, CALIFORNIA FIBER OPTIC INSTALLATION PLAN BEECH AVE, SUMMIT AVE, SCAIE:1 "-20' CITRUS AVE, & DATE: -)SIERRA LAK5S PKWY 12/08/10 APPR ` BY• 7�p DRAWING NO.:rJ °A i 4866 A F1 EXISTING SIX (6) 1 1/2" HIGH DENY TY POL YL HYLENE (HDPE) CONDU/TS. • - F21 EXISTING 2" CONDUIT. ® EXISTING TRAFFIC SIGNAL CONTROLLER. M ... EXISTING P48 PULL BOX. © EXISTING P48 SPLICE VA UL T PULL BOX. R F71 EXISTING 6 PAIR 122 A WG COMMUNICA LION INTERCONNECT CABLE TO REMAIN IN PLACE. - F81 FURNISH AND INSTALL ONE (1) 96 -STRAND SMFO CABLE IN THE BLUE 1 1/2" HDPE CONDUIT. WHERE CABLE PASSES THROUGH SPLICE VAULT. COIL 50' OF 96 -STRAND SMFO CABLE. SEE SPECIAL PRO VISIONS FOR DETAILS. F9]- • ° 1FURNISH AND INSTALL 12 -STRAND SMFO CABLE IN EXISTING COMMUNICA LION CONDUIT. n10 FURNISH AND INSTALL WALL INTERCONNECT CENTER (WIC) AND SPLICE TRA Y IN EXIS77NG TRAFFIC CONTROLLER CAB/NET. INSTALL AND TERM/NA TE 12-57RAND SMFO CABLE PER FIBER ASSIGNMENT SCHEDULE. F111 FURNISH AND INSTALL SPLICE ENCLOSURE AND FUSION SPLICE SIX (6) STRANDS OF 96 -STRAND SMFO CABLE TO THE APPROPRIA TE STRANDS OF 12-S77?AND SMFO CABLE PER FIBER ASSIGNMENT SCHEDULE. COIL MINIMUM OF 16' OF 12 -STRAND SMFO AND 50' OF 96 -STRAND SMFO CABLE FOR SLACK IN SPLICE VAULT. - f,1 n12 FURNISH AND INSTALL FIBER OPTIC MODEMS IN TRAFFIC CONTROLLER CABINET. COMPLETE CONNECTION BETWEEN WIC, CONTROLLER MODEM, AND !/IDEO DETECTION MODEM. w .1 w .1 1 DIAL BEFORETWO WORKING' .•IG } Y��DAYS BEFORE, :11 YOU 1.,1 TO SIERRA LAKE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH STANDARDS IN EFFECT. U No. C 40964 Exp. 3-31-11 CIVIL Prepared Under The Supervision Of : DRAWN BY: LP APPROVED BY: •• DH/LP r-4 ( A -Q- NN 1 DATE 3/o7/A CHECKED BY: FELIPE MOLINOS R.C.E. 40964 MP 1888 Y TO SAPPHIRE WAY z Q n U n O AUTOCAD FILENAME: S:\TRAFnC\Lauren\Summit Ave Fiber Installation\basemap&dwg CITY OF FO NTANA, CALIFORNIA FIBER OPTIC INSTALLATION PLAN BEECH AVE, SUMMIT AVE, SCAIE:1 "-20' CITRUS AVE, & DATE: -)SIERRA LAK5S PKWY 12/08/10 APPR ` BY• 7�p DRAWING NO.:rJ °A i 4866 A TO SIERRA LAKE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH STANDARDS IN EFFECT. U No. C 40964 Exp. 3-31-11 CIVIL Prepared Under The Supervision Of : DRAWN BY: LP APPROVED BY: •• DH/LP r-4 ( A -Q- NN 1 DATE 3/o7/A CHECKED BY: FELIPE MOLINOS R.C.E. 40964 MP 1888 Y TO SAPPHIRE WAY z Q n U n O AUTOCAD FILENAME: S:\TRAFnC\Lauren\Summit Ave Fiber Installation\basemap&dwg CITY OF FO NTANA, CALIFORNIA FIBER OPTIC INSTALLATION PLAN BEECH AVE, SUMMIT AVE, SCAIE:1 "-20' CITRUS AVE, & DATE: -)SIERRA LAK5S PKWY 12/08/10 APPR ` BY• 7�p DRAWING NO.:rJ °A i 4866 A