Loading...
HomeMy WebLinkAbout5504-3TRAFFIC SIGNAL GENERAL NOTES r 9. 1, 1. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA DEPARTMENT OF ENGINEERING PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITH IN THE CITY LIMITS. CALL (909) 350-7610. 2. ALL WORK, MATERIALS, EQUIPMENT AND TEMPORARY TRAFFIC CONTROL SHALL CONFORM TO THESE PLANS, THE CITY OF FONTANA STANDARD SPECIFICATIONS, THE STANDARD PLANS AND SPECIFICATIONS OF THE STATE OF CALIFORNIA, DATED 2010, AND THE CALIFORNIA MANUAL OF TRAFFIC CONTROL DEVICES, DATED 2014. 3. LOCATION OF ALL UNDERGROUND FACILITIES ARE APPROXIMATE. THE CONTRACTOR SHALL POTHOLE TO DETERMINE THE EXACT LOCATIONS AND VERIFY ALL CONDITIONS ON THE JOB SITE. HAND DIG FOUNDATIONS UNTIL CLEAR OF ANY OBSTRUCTIONS. PHONE UNDERGROUND SERVICE ALERT AT (800) 227-2600, TWO (2) WORKING DAYS BEFORE DIGGING. 4. CONTRACTOR SHALL FURNISH ALL EQUIPMENT, MATERIALS, AND HARDWARE TO CONSTRUCT THE TRAFFIC SIGNAL AND LIGHTING AS SHOWN ON THE PLANS, EXCEPT ANY CITY FURNISHED OR PROVIDED AS NOTED IN SECTION E. 5. ALL PULLBOXES SHALL BE No. 6 AND CONDUIT SHALL BE 3" RIGID METAL UNLESS OTHERWISE SHOWN. - 6. CONTRACTOR SHALL MAKE APPLICATION FOR ELECTRIC SERVICE AND SCHEDULING WITH SOUTHERN CALIFORNIA EDISON COMPANY FOUR WEEKS IN ADVANCE OF NEED. 7. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT EQUIPMENT LOCATIONS PRIOR TO FINAL PLACEMENT. SEE DETAIL THIS SHEET AND SECTION E. 8. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS, AND SIDEWALK AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE ENGINEER. 9. CONTROLLER AND SERVICE CABINETS SHALL NOT BE SUBJECTED TO WATER FROM SPRINKLERS. CONTRACTOR SHALL MODIFY SPRINKLERS SYSTEMS AS NECESSARY. 10. ANY EXISTING TRAFFIC SIGNALS AND LIGHTING SHALL REMAIN IN OPERATION UNTIL REPLACED WITH NEW TRAFFIC SIGNALS AND LIGHTING. 11. CONTRACTOR SHALL REFER TO THE CITY ENGINEER IN THE EVENT OF A CONFLICT OR POTENTIAL CONFLICT WITH THESE PLANS AND,OR SPECIFICATIONS FOR THIS PROJECT. 12. TRENCH REPAIRS SHALL BE PER SPECIAL PROVISIONS, SECTION E AND CITY STANDARD PLAN '1008. 13. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS AND ELECTRONIC AUTOCAD FILES TO THE CITY ENGINEER. 1 r. 0� 4 1 DETAIL "4" 1 ui 9+00 UNDERGROUND SERVICE ALERT (USA) IT'S THE LAW! DIAL BEFORE D YOU DIG! CALL AT LEAST TWO WORKING DAYS Know what's below. BEFORE YOU DIG Call before you dig. LOOP DETECTORS (TYP.) TRAFFIC SIGNAL NOTES GADJUST EXISTING PULLBOX. 12 INSTALL PEDESTRIAN PUSH BUTTON AND POST PER CALTRANS STANDARD PLAN ES -7A, DETAIL B. 13 PROTECT POLE IN PLACE AND ADJUST HEIGHT OF PUSH BUTTON TO ENSURE IT 0 IS 42" ABOVE FINISHED GROUND. GPROTECT EXISTING POLE AND REMOVE PEDESTRIAN PUSH BUTTON. 15 PROTECT EXISTING TRAFFIC SIGNAL EQUIPMENT IN PLACE 16 INSTALL NEW NO 6 PULLBOX SREMOVE AND SALVAGE EQUIPMENT AB ABANDON, IF APPLIED TO CONDUIT, REMOVE CONDUCTORS. CB INSTALL CONDUIT INTO EXISTING PULLBOX 1. CONTRACTOR SHALL REPLACE ANY LOOPS DAMAGED BY CONSTRUCTION. DETAIL "5" EX R/W //-4 J�� - ���� • .—.�—iii 11+00 POLE SCHEDULE STANDARD MAST ARM TYPE E LOOP SIGNAL MTGS PED PUSH BTN LOCATION LED R.S.N.S. REMARKS No. TYPE HEIGHT SIGNAL LUM LUMINAIRE VEHICLE MAST PED PHASE QUAD ARW A I B AO PPB POST 3'4" - - - - - - - - - < -1.5' 2.5' B PPB - - - - - _ - - - F - - REMOVE EX PPB AND POST POST(R)3'4" OC PPB POST 3'4" - - - - - - - - - F- 7' 2.75' ALL EQUIPMENT SHALL BE NEW, UNLESS OTHERWISE NOTED WITH (R) REMOVE. NOTE: POTHOLING REQUIRED FOR ALL POLES. LEGEND: -44}— PROPOSED SIGNAL EQUIPMENT OPROPOSED TYPE E LOOP PROPOSED TYPE D LOOP --- EXISTING SIGNAL EQUIPMENT SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH REV. REVISION DESCRIPTION DATE ENCR. CITY DATE STANDARDS IN EFFECT. DETAIL "4" 1"=5' m i I I CR i RE -ROUT EX CABLE AB TO NEW PPI3. Q CURB FACE A -A m d w a B.C.R. a 1 B POLE LOCATION DETAIL W N QUADRANT PUSH BUTTON LOCATION (TOP VIEW) E 3 I \ I � II \ I I \ I \ I I � CB j 12 0000 15 I 000 15 d t Ir _ \0 1 \ \ \` \\ ' LOOP \ DETECTORS Ile, DETAIL 5" 1 it = 5' KOA �OD�D A ���T Prepared Under The Supervision Of QROF E SS/ON 1t s-1 = C lJ1\t� 1 V \NG GV114ee, PLANNING & ENGINEERING s 3190 C Shelby Street y DRAWN BY: No. 75793 Ontario, California 91764 Tel: (909) 890-9693 Fax: (909) 890-9694 * EXP. 6/30/18 ,f DESIGNED BY: BENCH MARK: B.M. NO. 264 ELEVATION= 1,321.02 Sl awe �P OF CAUFDESCRIPTION: THE BENCHMARK FOR THIS SURVEY IS OF THE CITY OF FONTANA BENCHMARK NO. -1QQ //,, // CHECKED BY: 264 BEING AN "X" IN THE WEST END OF THE SWCR OF JUNIPER AVE AND PAINE f DATE: 1Its STREET. MING N. R.C.E. 75793 North 0 20 40 SCALE 1"=20' CITY OF FONTANA, CALIFORNIA TRAFFIC SIGNAL MODIFICATION JUNIPER AVENUE SCALE: AND As Noted DATE: FO L BOULEVARD [;C;EN B 4 DRAWING NO.: 3 DATE:! �• �l0 5504 3 GINEERR.C.E. 51152