HomeMy WebLinkAbout5504-1GENERAL NOTES:
1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE
CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN
BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE
NOTED.
2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CANNOT BE
RESOLVED BY REFERENCE -TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL
IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION.
3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT
DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL
BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC
RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610.
5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES
DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC
EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR
OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES.
7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES
5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
8. THE WALL$, AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED
BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF
THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET
SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT.
9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A
SEPARATE PERMIT FOR THAT PURPOSE.
10. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND
ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO.
THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 811 TWO WORKING DAYS BEFORE
EXCAVATION.
11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT
LIMITED Tb; ,GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION,
DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY
COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES.
12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY
AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR AGENCY
AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION
AND WATER REQUIREMENTS.
13. CURVE DATA REFERS TO THE FACE OF CURB.
14. STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED.
15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE
CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE
FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION.
16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH
MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER.
17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT
TIES AND BENCHMARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND
SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL
BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO
THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES.
A MINIMUM 12 -FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR
RESIDENTS,AND EMERGENCY VEHICLES.
r
19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL,
INCLUDING ADEQUATE WATERING, AT ALL TIMES.
20. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES
PER HOUR.
21. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED
ONTO PUBLIC OR PRIVATE- PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT
PRIOR WRITTEN APPROVAL.
22. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR.
23. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE
REQUIRED "DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED
DENSITY IS OBTAINED.
CITY OF FONTANA
JUNIPER AVENUE AND FOOTHILL BOULEVARD
STREET IMPROVEMENT PLAN
PROJECT SITE
VICINITY MAP
NOT TO SCALE
24.
CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING
1 a
CONT. GENERAL NOTES:
53 LF
STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE
REMOVE EXISTING PCC SIDEWALK.
400 SF
1
TEMPORARY NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS.
N/A
Highland Ave
AND REMOVE TO THE LIMITS SHOWN ON THIS PLAN. ALL REMOVALS SHALL BE
CONSTRUCT A.0 PAVEMENT
31.
PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF
25.
THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE TIME
8" CURB OVER 12" MIN 95% COMPACTED NATIVE PER CITY OF FONTANA
THE CITY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING.
Walnut St
OF CONSTRUCTION AND SHALL CONFORM TO THE CITY OF FONTANA STANDARD DETAILS.
EX. SANITARY SEWER MANHOLE
OCONSTRUCT
CURB RAMP PER DETAIL "1" OVER 12" MIN 95% COMPACTED NATIVE
1 EA
32.
Baseline
26.
ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH
CONSTRUCT CURB RAMP PER DETAIL "2" OVER 12" MIN 95% COMPACTED NATIVE PER
SECTIONS SHALL BE RECOMMENDED BY A GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA
5
Ave
1 EA
FOR APPROVAL UPON COMPLETION OF ROUGH GRADING.
27.
THE SEWER CONTRACTOR SHALL STAMP "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE
33.
ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE
5 TON
Miller Ave
CONSTRUCT 4" THICK P.C.C. SIDEWALK OVER 12" MIN 95% COMPACTED
PAVING CONTRACTOR UPON COMPLETION OF PAVING.
28.
NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED,
34
UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES,
REMOVE PORTION OF LOCAL DEPRESSION AND CONSTRUCT PCC LOCAL DEPRESSION PER
INSPECTED AND APPROVED.
(D15CITY
AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
29.
ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING
a�
>>
CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY
>
OF STREETS.
>
a�
Q
30.
QQ
36.
AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO
11
>
Q
o
PEDESTRIAN PUSH BUTTON AND POST PER CALTRANS STANDARD PLAN
to
c
(D
2 EA
co
PROTECT POLE IN PLACE AND ADJUST HEIGHT OF PUSH BUTTON TO ENSURE IT
°D
E
13
0
=3
a)
GPROTECT
�
i
N
C
cu
cu
N/A
-
p
U
EX. STREET SIGN
in
2
a_
REMOVE WALL
Foothill
Olvd
-
EXISTING CURB & GUTTER
•'j
REMOVE TREES/LANDSCAPE
PROJECT SITE
VICINITY MAP
NOT TO SCALE
24.
CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING
1 a
CONT. GENERAL NOTES:
53 LF
STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE
REMOVE EXISTING PCC SIDEWALK.
400 SF
OREMOVAL
TEMPORARY NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS.
N/A
~ EX. TREES/LANDSCAPE
AND REMOVE TO THE LIMITS SHOWN ON THIS PLAN. ALL REMOVALS SHALL BE
CONSTRUCT A.0 PAVEMENT
31.
PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF
25.
THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE TIME
8" CURB OVER 12" MIN 95% COMPACTED NATIVE PER CITY OF FONTANA
THE CITY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING.
OF CONSTRUCTION AND SHALL CONFORM TO THE CITY OF FONTANA STANDARD DETAILS.
EX. SANITARY SEWER MANHOLE
OCONSTRUCT
CURB RAMP PER DETAIL "1" OVER 12" MIN 95% COMPACTED NATIVE
1 EA
32.
ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET
26.
ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH
CONSTRUCT CURB RAMP PER DETAIL "2" OVER 12" MIN 95% COMPACTED NATIVE PER
SECTIONS SHALL BE RECOMMENDED BY A GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA
5
EXISTING CONCRETE.
1 EA
FOR APPROVAL UPON COMPLETION OF ROUGH GRADING.
27.
THE SEWER CONTRACTOR SHALL STAMP "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE
33.
ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE
5 TON
A SEWER -LATERAL.
CONSTRUCT 4" THICK P.C.C. SIDEWALK OVER 12" MIN 95% COMPACTED
PAVING CONTRACTOR UPON COMPLETION OF PAVING.
28.
NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED,
34
UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES,
REMOVE PORTION OF LOCAL DEPRESSION AND CONSTRUCT PCC LOCAL DEPRESSION PER
INSPECTED AND APPROVED.
(D15CITY
AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
29.
ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING
35.
CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY
OF STREETS.
200 SF
THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER.
30.
APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT.
36.
AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO
11
ADJUST EXISTING PULLBOX.
2 EA
SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER.
UNDERGROUND SERVICE ALERT (USA)
IT'S THE LAW!
DIAL BEFORE •
YOU DIG! •
CALL AT LEAST
TWO WORKING DAYS Know what's below.
BEFORE YOU DIG Call before you dig.
SHOULD CONSTRUCTION OF THE REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN TWO
YEARS OF THE DATE OF APPROVAL SHOWN HEREON
AND CARRIED FORTH IN A DILIGENT MANNER, THE
CITY ENGINEER MAY REQUIRE REVISIONS TO THE
PLANS TO BRING THEM INTO CONFORMANCE WITH
REV. REVISION DESCRIPTION DATE ENGR. CITY DATE
STANDARDS IN EFFECT.
DATUM STATEMENT
ASIS OF BEARING
THE BASIS OF BEARINGS FOR THIS SURVEY IS THE CENTERLINE
OF JUNIPER AVENUE HAVING A BEARING OF N 0'04'30" E, AS
SHOWN ON PARCEL MAP 2134, RECORDED IN BOOK 18, PAGE 1
OF PARCEL MAPS, RECORDS OF SAN BERNARDINO COUNTY,
CALIFORNIA.
VERTICAL CONTRO
"ELEVATIONS SHOWN HEREON ARE IN TERMS
WITH THE NORTH AMERICAN VERTICAL DATUM OF
1988 (NAVD88) BASED LOCALLY UPON THE
FOLLOWING BENCHMARK IN THE CITY OF FONTANA"
BENCHMARK NO. ELEVATION
264 1321.02'
THE RIGHT OF WAY SHOWN IS BASED UPON AVAILABLE COUNTY
ASSESSOR'S MAP INFORMATION.
THESE PLANS ARE BASED UPON A SURVEY CONDUCTED ON
2/13/16 BY RMD SURVEYING CORPORATION, RIALTO, CALIFORNIA
OQROFESS/O/,� _ '' KOA CORpomnON
\NG G (-1 1 Fti PLANNING & ENGINEERING
c�
W 3190 C Shelby Street
No. 75793 '° Ontario, California 91764
Tel: (909) 890-9693 Fax: (909) 890-9694
# EXP. 6/30/18 ,�
BENCH MARK: B.M. NO. 264 ELEVATION= 1,321.02
ciwu �P
OF CDESCRIPTION: THE BENCHMARK FOR THIS SURVEY IS OF THE CITY OF FONTANA BENCHMARK NO.
AL�F
264 BEING AN "X' IN THE WEST END OF THE SWCR OF JUNIPER AVE AND PAINE
STREET.
CONSTRUCTION NOTES AND QUANTITIES
QTY
1 a
REMOVE EXISTING PCC CURB.
53 LF
1 b
REMOVE EXISTING PCC SIDEWALK.
400 SF
OREMOVAL
LIMIT. SAWCUT CONCRETE, ASPHALT, AND OTHER HARDSCAPE SURFACE
N/A
~ EX. TREES/LANDSCAPE
AND REMOVE TO THE LIMITS SHOWN ON THIS PLAN. ALL REMOVALS SHALL BE
CONSTRUCT A.0 PAVEMENT
DISPOSED OF BY THE CONTRACTOR, UNDER CLEARING AND GRUBBING.
OCONSTRUCT
8" CURB OVER 12" MIN 95% COMPACTED NATIVE PER CITY OF FONTANA
53 LF
STANDARD PLAN NO. 1000. VARY CURB TO MATCH NEW CURB RAMP.
EX. SANITARY SEWER MANHOLE
OCONSTRUCT
CURB RAMP PER DETAIL "1" OVER 12" MIN 95% COMPACTED NATIVE
1 EA
PER MODIFIED CITY OF FONTANA STANDARD PLAN NO 1004.
EX. WATER METER
-
CONSTRUCT CURB RAMP PER DETAIL "2" OVER 12" MIN 95% COMPACTED NATIVE PER
5
MODIFIED APWA STANDARD PLAN NO 111-5 CASE A TYPE 2.
1 EA
6
CONSTRUCT 6.5" MIN. AC PAVEMENT OVER 12" OF 95% COMPACTED NATIVE
125 SF
SUBGRADE PER CITY STD. 401
5 TON
CONSTRUCT 4" THICK P.C.C. SIDEWALK OVER 12" MIN 95% COMPACTED
(D50NATIVE
PER CITY OF FONTANA STANDARD PLAN NO.1006.
SF
-------------------------------------------------------
REMOVE PORTION OF LOCAL DEPRESSION AND CONSTRUCT PCC LOCAL DEPRESSION PER
(D15CITY
OF FONTANA STANDARD 3003. (CASE B)
SF
OPROTECT
IN PLACE.
N/A
GRIND 0.1' MIN. OF EXISTING AC PAVEMENT AND OVERLAY 0.1' MIN. OF AC
200 SF
10
PAVEMENT PER DETAIL "3"
1.5 TON
TRAFFIC SIGNAL NOTES AND QUANTITIES
11
ADJUST EXISTING PULLBOX.
2 EA
PEDESTRIAN PUSH BUTTON AND POST PER CALTRANS STANDARD PLAN
OINSTALL
12
ES -7A, DETAIL B.
2 EA
FENCE
PROTECT POLE IN PLACE AND ADJUST HEIGHT OF PUSH BUTTON TO ENSURE IT
;}
13
0
IS 42" ABOVE FINISHED GROUND.
1 EA
GPROTECT
EXISTING POLE AND REMOVE PEDESTRIAN PUSH BUTTON.
1 EA
aPROTECT
EXISTING TRAFFIC SIGNAL EQUIPMENT IN PLACE
N/A
LEGEND:
CONSTRUCT P.C.C. SIDEWALK
~ EX. TREES/LANDSCAPE
CONSTRUCT A.0 PAVEMENT
r EX. STREET LIGHT
171 7_7
PROPOSED GRIND AND OVERLAY
EX. SANITARY SEWER MANHOLE
a)
EX. WATER METER
-
EXISTING CENTERLINE
- -
EXISTING RIGHT-OF-WAY
it
EX. SEWER METER
EXISTING SIDEWALK
0
EX. WATER VALVE
-------------------------------------------------------
REMOVE EXISTING SIDEWALK
m
EX. MAILBOX
PROPOSED SIDEWALK
--------- - x ------- = -
EXISTING CHAIN LINK FENCE
EX. FIRE HYDRANT
X x
REMOVE EXISTING CHAIN LINK
FENCE
;}
EX. POWER POLE
x -x-
PROPOSED CHAIN LINK FENCE
C
EX. STREET SIGN
- -
EXISTING WALL
REMOVE WALL
-
EXISTING CURB & GUTTER
•'j
REMOVE TREES/LANDSCAPE
PROPOSED CURB & GUTTER
REMOVE STREET LIGHT
--- - - ----
EXISTING GAS LINE
REMOVE POWER POLE
EXISTING WATER LINE
EXISTING SEWER
'?
REMOVE TELEPHONE PEDESTAL
----- 4-;i ----
EXISTING OVERHEAD LINE
m
REMOVE MAIL BOX
- -- - -- .-.. - -- -
EXISTING STORM DRAIN LINE
®
PROPOSED MAIL BOX
---- ----
EXISTING TELEPHONE LINE
61
PROPOSED STREET SIGN
LEGEND:
®-F-- PROPOSED
SIGNAL EQUIPMENT
OPROPOSED
TYPE E LOOP
PROPOSED
TYPE D LOOP
-�-',-_ -- EXISTING SIGNAL
EQUIPMENT
INDEX OF
SHEETS=
EXISTING TYPE E LOOP
SHEET
1
-TITLE SHEET
SHEET
2
-STREET IMPROVEMENT PLAN
,171SHEET
3
-TRAFFIC SIGNAL PLAN
V' '' EXISTING TYPE D LOOP
'f
L J
Prepared Under The Supervision Of :
DRAWN BY:
DESIGNED BY:
DATE: Ups Q ./s CHECKED BY:
;UA R.C.E. 75793
CITY OF FONTANA, CALIFORNIA
STREET IMPROVEMENT PLAN
JUNI;ERAVENUE SCALE:
D As Noted
DATE:
FOOT OULEVARD
A;ITYE
D DRAWING NO.: 1
DATE T • 6s - l(0 5504 3
NGIN R R.C.E. 51152