HomeMy WebLinkAbout5461-1GENERAL NOTES STREET IMPROVEMENT PLANS JUNIPER AVENUE & ATHENS LANE 1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED. 2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION. 3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610. 5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. 8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE OTENTIAL EXISTS FOR GROUND MOVEMENT. 9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE. 10. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION. 11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES. 12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS. 13. CURVE DATA REFERS TO THE FACE OF CURB. 14. STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED. 15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION. 16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER. 17. REMOVAL AND REPLACEMENT OF EXISTING SURVEYCONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT. 18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES. 20. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES PER HOUR. 21. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL. 22. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR. 23. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED. 24. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS. 25. THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE TIME OF CONSTRUCTION AND SHALL CONFORM TO THE CITY OF FONTANA STANDARD DETAILS. 26. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE. 27. THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER LATERAL. 28. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED. 29. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS. 30. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT. 31. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF THE CITY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING. 32, ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET SECTIONS SHALL BE RECOMMENDED BY A GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH GRADING. 33. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING. 34. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER. 35. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER. 36. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER. BENCHMARK GLO CORNER INTERSECTION CITRUS AND BASELINE I. D. 357 YEAR 9/67 ELEV. 1395.00 FEET TOLL FREE `=�- 1-800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT REV. REVISION DESCRIPTION CITY OF FONTANA PARCEL MAP 18420 CONSTRUCTION NOTES Ol CONSTRUCT 8" PCC CURB & GUTTER PER CITY OF FONTANA STANDARD PLAN NO. 1000 22) CONSTRUCT CURB RETURN ACCESS RAMP PER CITY OF FONTANA STANDARD PLAN NO. 1003 © CONSTRUCT CONCRETE SIDEWALK PER CITY OF FONTANA STANDARD PLAN NO. 1006 ® INSTALL STREET LIGTHT PER STREET LIGHT PLAN. Q5 CONSTRUCT 8' WIDE STANDARD CROSS GUTTER PER CITY OF FONTANA STANDARD PLAN NO. 403 ® CONSTRUCT 8" ASPHALT CONCRETE DIKE PER CITY OF FONTANA STANDARD PLAN NO. 1007 O7 RELOCATE EXISTING POWER POLE (BY OTHERS) ® INSTALL WATER METER PER FONTANA WATER PLANS AND STANDARDS. O9 CONSTRUCT CONCRETE DRIVEWAY APPROACH PER CITY OF FONTANA STANDARD PLAN 1002. (W=24, X=3'). 1� CONSTRUCT 4.5" A.C. PAVEMENT (MIN) OVER 12" (MIN) OF 959 COMPACTED NATIVE SUBGRADE, PER FONTANA STANDARD PLAN NO. 400. 11 CONSTRUCT 6" HIGH CONCRETE CURB PER CITY OF FONTANA STANDARD PLAN NO. 1000 Q CONSTRUCT 32' LENGTH STANDARD BARRICADE PER CITY OF FONTANA STANDARD PLAN NO. 4000 © CONSTRUCT 36" X 1- DEEP CONCRETE V -GUTTER ® CONSTRUCT 6" PCC CURB & GUTTER PER CITY OF FONTANA STANDARD PLAN NO. 1000 ® INSTALL FIRE HYDRANT PER FONTANA WATER STANDARD PLAN. n-rY'q 73 L. F. 2 3, 813 SQ. FF. 2 328 SQ. FT. 51 L.F. 3 4 4 6,668 SQ. FT. 127 L.F. 68 L. F. 131 SQ. FT. 258 L. F. 1 WEST q EAST 618 , I_ 0.5' 5' I I I I 1 2,%7 PROP. CONC. SIDEWALK -J PROP. PARKWAY i i PROP. 6" CONC. CURB & GUTTER I I I I I I LEGEND - - - CENTERLINE - - -� - - PROPERTY LINE FL FLOWLINE TC TOP OF CURB EP EDGE OF PAVEMENT -----------SS------SEWER LINE STA. STATION PROP. PROPOSED EXIST. EXISTING L.S. LANDSCAPE UTILITY CONTACTS: THE CONTRACTOR SHALL NOTIFY THE FOLLOWING UTILITIES OR AGENCIES A MINIMUM OF TWO WORKING DAYS PRIOR TO COMMENCING CONSTRUCTION. AT&T (510) 645-2929 CITY OF FONTANA: (909) 350-7610 TIME WARNER CABLE. • (909) 975-3398 SOUTHERN CALIFORNIA GAS COMPANY: (909) 335-7583 FONTANA WATER COMPANY.• (909) 201-7333 SOUTHERN CALIFORNIA EDISION COMPANY.• (909) 928-8270 INLAND EMPIRE UTILITIES AGENCY.• (909) 993-1600 PRIVATE ENGINEER'S NOTICE TO CONTRACTOR: The existence and location of any underground utility pipes and/or structures shown on these plans were obtained by a search of the available records. These locations are approximate and shall be confirmed by the contractor so that any necessary adjustment can be made in alignment and/or grade of the proposed improvement. The contractor is required to take due precautionary measures to protect any utility lines shown and any other lines not on record or not shown on these plans. Construction contractor agrees that in accordance with generally accepted construction practices, he will be required to assume sole and complete responsibility for job site conditions during the course of construction of the project, including the safety of all persons and property. This requirement shall be made to apply continuously and not be limited to normal working hours. Construction contractor further agrees to defend, indemnify and hold design professional harmless from any and all liability, real or alleged, in connection with the performance of work on this project, excepting liability arising from the sole negligence of the design professional. k --PROP. CONC. SIDEWALK PROP. PARKWAY TYPICAL STREET SECTION ATHENS LANE (PROPOSED) NOT TO SCALE WEST EAST �. 68' FE 1 1 0.5' 1 I 1 1 1 E PROP. CONC. SIDEWALK -J PROP. PARKWAY 2,%" E 34 ) 34' I I 22' I 13' 1 1 I �7 EXIST. PAVEMENT��'' EXIST GRADE EXIST 8" CONC. CURB & GUTTER TYPICAL STREET SECTION (JUNIPER AVENUE) NOT TO SCALE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH DATE ENGR. CITY DATE STANDARDS IN EFFECT. °` CO24 ~ �o +r '1- "' l7 tr �sT CMI rE OF C4003 Prepared Under The Supervision Of LANDEVELOPMENT ENGINEERING, INC. 7340 E. FLORENCE AVENUE, SUITE. 211 DOWNEY, CA 90240 DRAWN BY: (562) 325-9893 TEL EAV (562) 309-8161 FAX DESIGNED BY: e ngineering®yohoo.com EAV Jz,�� Date : 3.3b�r` CHECKED BY: PAB�O B. SANCHtZ R.C.E. 29664 E//PBS CITY OF FONTANA, CALIFORNIA STREET IMPROVEMENT PLAN SCALE: PARCEL MAP 18424 AS SHOWN GENREAL NOTES & CONSTRUCTION NOTES DATE: 3-30-2016 'PRODRAWING NO.: 1 CTI T tIV�aIN • DATE:I & 5461 5