1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, T 14E CITY OF FONTANA STANDARD PLANS, THE
CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORK5 CONSTRUCTION ('GREEN
BOOK'). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE
NOTED.
2. WHEN A TECHNICAL CONFLICT 15 FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED
BY REFERENCE TO PRECEDENCE PROVISIONS IN THE 'GREEN BOOK; THE CONTRACTOR SHALL IMMEDIATELY
REPORT SAID CONFLICT TO 774E CITY ENGINEER FOR RESOLUTION.
3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMP'IUNITY DEVELOPMENT
DEPARTMENT, ENGINEERING DIVISION PRIOR TO T 14E START OF ANY WORK. INSPECTION COORDINATION SHALL BE
REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY
WITHIN THE CITY LIMITS. CALL (909) 350-7610.
5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED
IN V4E STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS
OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER
TRAFFIC CONTROL DEVICES AT ALL TIMES.
7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET
OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY
8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY
SNORING, SLOPING OF THE GROUND OR OTHER APPROVED MEAN5 PURSUANT TO THE REQUIREMENTS OF THE
DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LE -55 THAN FIVE (5) FEET SHALL
AL50 BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT.
9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE
PERMIT FOR T FLAT PURPOSE:
10. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND
ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO.
THE CONTRACTOR SHALL CONTACT_ UNDERGROUND SERVICE ALERT AT 1-8010-227-2600 TWO WORKING DAYS
BEFORE EXCAVATION.
11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT
LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC
WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES
SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES.
12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE
AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE
OPERATION AND WATER REQUIREMENTS.
13. STATIONING REFERS TO THE CENTERLINE OF SEWER EXCEPT WHERE OTHERWISE NOTED.
14. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO
CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR T 14E
PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION.
15. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS
HM40UT PRIOR NOTIFICATION TO THE CITY ENGINEER.
16. REMOVAL AND REPLACEMENT OF EXISTING SURVEYCONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES
AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR.
SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF 774I5 CONSTRUCTION SHALL BE REPLACED.
THE CONTRACTOR SHALL NOTIFY T 14E ENGINEER ONE WEEK PRIOR TO CONSTRUCTION 50 THAT TIES TO
MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
CITY.OFFONTANA
E"uFJ%fER
-- _OVEMEN-T :- _-N
_ ACT
NOE
Y
1 c I = BASELINE A VENUE
--------
Z r 1
2 3 4 5 6 7 8
Q� �----- --- --- -- - 9
1 SE SHET2 -�
i
KII.VGSTON COUR
i _ I 10
_O-- -- o
1�mo ME
1 �
1 ' 1 19 18 17 16 15 14 13 12I all
11
.-
I , _ 17-11
�--- --� INDtX MAP
60 30 0 60 120
GRAPHIC SCALE
SCALE: In = 60
17.
T 14E CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIME5. A MINIMUM
2q.
ALL 4' HOUSE LATERALS SHALL BE INSTALLED AT A 2X MINIMUM GRADE UNLE55 OTHERWISE APPROVED BY THE
12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND
�STONECREEK
CITY ENGINEER.
W
EMERGENCY VEHICLES.
BROOK LN.
30.
TERMINATE ALL 4' HOUSE SEWER LATERALS 3 FEET INSIDE THE LOT WITH A PLUG 12' BELOW THE GROUND
18.
THE CONTRACTOR 514AU PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING
SURFACE. WHEN PUBLIC UTILITY EASEMENTS EXIST NEXT TO THE STREET RIGHT OF WAY, THE LATERAL
ADEQUATE WATERING, AT ALL TIME5.
SHALL TERMINATE 3 FEET IN51DE THE LOT AS MEASURED FROM THE UTILITY EASEMENT.
19.
THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED
31.
THE SEWER CONTRACTOR SHALL STAMP AN 05' IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER
U
ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION 141TWJT PRIOR
LATERAL
WRITTEN APPROVAL.
BASELINE AVE.
32.
IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS, THE
20.
NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR.
CONTRACTOR SHALL NOTIFY THE ENGINEER AND ALL AFFECTED AGENCIES IMMEDIATELY
21.
A GEOTECHNICAL ENGINEER 514AU CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED
33.
NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL NAVE BEEN PLACED, INSPECTED
DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF T 14E WORK UNTIL THE SPECIFIED DENSITY 15
AND APPROVED.
OBTAINED.
34.
ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS.
22.
CAPS- SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SHALES FROM UNDERMINING STREET
35.
APPROVED SOIL STERILANT 15 REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT.
IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY
NON-ERODEABLE SHALES ENTERING OR LEAVING IMPROVEMENTS.
36.
ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE
PAVING CONTRACTOR UPON COMPLETION OF PAVING.
23.
ALL EXPOSED CONCRETE SURFACES SI-LALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING
CONCRETE
37.
UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND
OTHER TRAFFIC CONTROL DEVICES TO THE SAT15FACTION OF THE CITY TRAFFIC ENGINEER.
24.
IF SEWER CONSTRUCTION 15 TO BE DONE IN PHASES, THE CONTRACTOR SHALL PROVIDE A TERMINAL CLEANOUT
AT THE PHASE BOUNDARY, NOT MORE THAN 150 FEET FROM THE DOWNSTREAM MANYTOLE, SEE CITY OF
38.
AS -BUILT DRAWINGS 5144U BE PROVIDED BY 171E CONTRACTOR TO THE ENGINEER OF RECORD, 14140 SHALL
FONTANA STANDARD DETAIL FOR TERMINAL CLEAIOl1T.
PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER.
25.
SANITARY SEWER LINES SHALL BE CONSTRUCTED OF BELL AND SPIGOT OR BAND SEAL TYPE VITRIFIED CLAY
SEWER CONS 1 RUC 77ON NO TES CST Y.
PIPE (V.C.P.) EXTRA STRENGTH CLASS AND SHALL CONFORM TO THE PROVISIONS OF THE A5T H DESIGNATION
C7QOQ FOR V.C.P.
Q
INSTALL 8' EXTRA STRENGHT VCP SEWER. 517 L.F.
26.
NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY W/TNOUT PRIOR APPROVAL OF THE CITY
02
INSTALL 48' SEWER MANHOLE PER CITY OF FONTANA 3 EA.
ENGINEER.
5TD. DWG. 2001.
27.
SNORT VCP STUBS WITH FLEXIBLE COMPRESSION JOINTS SHALL BE USED AT MANHOLE WALLS TO ALLOW FOR
O
INSTALL 4' SEWER LATERAL AND CLEANOUT PER CITY 692 L.F.
MINOR DEFLECTIONS IN ALIGNMENT.
OF FONTANA DWG. 5TD. 2009.
O4
INSTALL PLASTIC SEWER CLEANOUT BOX PER CITY OF 19 EA.
28.
PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE EXISTING FACILITIES, AND VERIFY ELEVATION AND
FONTANA DWG. 5TD. 2007.
LOCATION OF CONNECTIONS. CITY APPROVAL OF CONNECTIONS TO EXISTING FACILITIES DOES NOT IMPLY
CORRECTNE55 OF ELEVATIONS OR LOCATIONS SHOWN ON THE PLANS.
Q5
INSTALL FLAT WYE VCP 4' SEWER LATERAL PER DETAIL 257 L F
BENCHMARK
NO. 407
PK NAIL IN THE WE5T END OF THE
SOUTHWEST CURB RETURN- OF CYPRESS
AND MILLER.
ELEV. =1356.59
SEWER LEGEND
PROPOSED SEWER LINE
' SEWER LINE EXISTING
O MANHOLE
11 CLEANOUT BOX
PRI VA 7F ENGINEERS NO TES: 'I -
l. UNLESS SPECIFIED IN THE PROJECT SPECIFIC CONSTRUCTION DOCUMENTS, ALL
CONSTRUCTION SNOI4N HEREON SHALL BE IN ACCORDANCE WITH THE GOVERNING AGENCY
ADOPTED VER51ON OF THE UNIFORM BUILDING CODE, THE 'STANDARD SPECIFICATIONS
FOR PUBLIC WORKS CONSTRUCTION' (CURRENT EDITION) AND THE 'STANDARD PLANS FOR
PUBLIC WORKS CONSTRUCTION' (CURRENT EDITION). I -
2. THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OF STRUCTURES
SHOWN ON THESE PLANS WERE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. THESE
LOCATIONS ARE APPROXIMATE AND SHALL BE CONFIRMED IN THE FIELD BY THE
CONTRACTOR, 50 THAT ANY NECESSARY ADJUSTMENTS CAN BE MADE IN ALIGNMENT
AND/OR GRADE OF THE PROPOSED IMPROVEMENTS. T 14E CONTRACTOR 15 REQUIRED TO
TAKE DUE PRECAUTIONARY MEASURES TO PROTECT ANY UTILITY LINES 54014N AND ANY
OTHER LINES NOT OF RECORD OR NOT 51-IOWN ON THESE PLANS.
3. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL VERIFY THE HORIZONTAL AND
VERTICAL P051TION OF ALL POINTS OF CONNECTION TO EXISTING STRUCTURES. 77415
SHALL INCLUDE BOTH ABOVE GROUND AND BELOW GROUND POINTS OF CONNECTION. THE
ENGINEER SHALL BE NOTIFIED OF ANY DISCREPANCIES PRIOR TO BEGINNING
CONSTRUCTION.
4. T14/CKNE55 OF PAVEMENT AND BASE MATERIAL SHOWN HEREON 15 PRELIMINARY ONLY.
FINAL PAVEMENT SECTION TO BE DETERMINED BY SOILS TEST AND RECOMMENDED BY
THE SOILS ENGINEER UPON COMPLETION OF ROUGH GRADING.
5. CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED
CONSTRUCTION PRACTICES, CONSTRUCTION CONTRACTOR WILL BE REQUIRED TO ASSUME
SOLE AND COMPLETE RESPONSIBILITY FOR " SITE CONDITIONS DURING THE COURSE OF
CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY.
THAT 71415 REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED
TO NORMAL WORKING HOURS.
6. THE PRIVATE ENGINEER SIGNING T HE5E PLANS 15 RESPONSIBLE FOR ASSURING T 14E
ACCURACY AND ACCEPTABILITY OF THE DESIGN HEREON. IN THE EVENT OF
DISCREPANCIES ARISING AFTER APPROVAL OR DURING CONSTRUCTION, THE PRIVATE
ENGINEER SHALL BE RESPONSIBLE FOR DETERMINING AN ACCEPTABLE SOLUTION AND
REV15ING THE PLANS ACCORDINGLY I
ON SHEET 2.
r
0 O SHOULD CONS7RUC77ON OF THE REQUIRED
IMPROVEMENTS NOT COMMENCE WlTHIN a QREss,�`
TWO YEARS OF THE DA TE OF APPROVAL
P IS0C-:2
S
SHOWN HEREON AND CARRIED FORM N IN - 2 No. &M7 A Z
rnrn
1500 IOWA AVENUE, SUITE 210 DLAL TWO WORKING A DILIGENT MANNER, THE CITY ENGINEER 03/31/2017
BEFORE DAYS BEFORE
MAY REQUIRE REVISIONS TO THE PLANS
RIVERSIDE CA 92507 1 YOU DIG YOU DIG
REV. TO BRING THEM INTO CONFORMANCE NTH'rF FI �`\E�`�
(951) 787-8421 WWW.PSOMAS.COM TOLL FREE -800-227-2600 STANDARDS IN EFFECT.
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT REVISION DESCRIP770VV DATE ENGR. CITY DATE
.64CJC5GN DR. • JACKSON CT
H0NTCOMERr AVE:
4i
SAN JACINTON AVE. K SAN JACINTON AVE.
l3 i2 4+ 4i
I ELAINE DR. v~i uIL
Q
I
VICINITY MAP
NOT TO SCALE
THOMAS GUIDE - PAGE 604, 14-6 (2005 EDITION)
- SECTION 6 TOWNSHIP I SOUTH RANGE 5 WEST
OWNER/DEVELOPER
MARC HOMES, LLC
MICHAEL LUTZ
8282 WHITE OAK AVE, SUITE 112
RANCHO CUCAMONGA, CA 91730
PHONE. 409-244-8986
FAX. 951-271-7315
ENG/NEER
P50NAS
1500 IOWA AVENUE, SUITE 210
RIVERSIDE, CA 92507
PH: (q5!) 787-8421
FAX. (q5i) 682-3379
SOURCE OF TOPOGRAPHY
AERIAL TOPOGRAPHY BY:
ANALYTICAL PHOTOGRAMMETRIC SURVEYS, INC
3544 UNIVERSITY AVE SUITE IA
RIVERSIDE, CA 92501
PH: (951) 686-5103
FAX. (951) 686-1826
DATE. MAY 21, 2014
FIELD TOPOGRAPHY Br.-
IN
Y:IW CONSULTING ENGINEERS, INC
3544 UNIVERSITY AVE
RIVERSIDE, CA 42501
PA (951) 905-5300
FAX. (%I) 905-5302
DATE. JUNE 9, 2014
SO/LS ENG/NEER
GEOTEK, INC
710 E. PARKRIDGE AVENUE
CORONA, CALIFORNIA 92879
PH: (951) 710-1160
FAX. (951) 710-1167
SITE DA TA:
APN- 0241-021-19-0-000
GROSS AREA: 4.53 ACRES
LEGAL DESCRIP17ON
THE NORTH ONE-HALF OF THE WEST ONE-HALF OF
FARM LOT 621, SEMI-TROPIS LAND AND WATER h
COUNTY SUBDIVISION, IN THE CITY OF FONTANA,
COUNTY OF SAN BERNARDINO, STATE OF
CALIFORNIA, AS PER PLAT RECORDED IN BOOK 11,
PAGE 12 OF MAPS, RECORDS OF SAID COUNTY
U77LI TY PROVIDERS
FONTAX4 WATER COMPANY
SEWER: ........................................ FONTANA WATER COMPANY
ELECTRICITY ......................... SOUTHERN CALIFORNIA EDISON
GAS: ............................................. SOUTHERN GAS COMPANY
TELEPHONE:............................ ......................... SBCVPACBELL
TELEVISION:..... GOLDEN STAT FOR TIME WARNER TELECOM R
SHEET INDEX
SHEET NO SHEET DESCRIPTION s
I TITLE SHEET
2 SEWER PLAN AND PROFILE
PREPARED UNDER THE SUPERVISION OF
DRAWN BY
✓c/8S
DESIGNED BY:
X/js
ANDREW C WOODARD R. CE 8,3.557 CHECKED BY
DATE ,A4/AW
CITY OF FONTANA, CALIFORNIA
SEWER IMPROVEMENT PLAN
TRACT NO. 200 60 SCA S SgOWN
TITL SHEET DA 8/24/15 md
AI*R B"EN60E�ERW-
DA �- � % DRAWING Na: 1
R. .E. 511 5'370 2 I
DR
�STONECREEK
W
BROOK LN.
4
ry
��lW
U
TS1T
c
BASELINE AVE.
BASELINE AVE.
.64CJC5GN DR. • JACKSON CT
H0NTCOMERr AVE:
4i
SAN JACINTON AVE. K SAN JACINTON AVE.
l3 i2 4+ 4i
I ELAINE DR. v~i uIL
Q
I
VICINITY MAP
NOT TO SCALE
THOMAS GUIDE - PAGE 604, 14-6 (2005 EDITION)
- SECTION 6 TOWNSHIP I SOUTH RANGE 5 WEST
OWNER/DEVELOPER
MARC HOMES, LLC
MICHAEL LUTZ
8282 WHITE OAK AVE, SUITE 112
RANCHO CUCAMONGA, CA 91730
PHONE. 409-244-8986
FAX. 951-271-7315
ENG/NEER
P50NAS
1500 IOWA AVENUE, SUITE 210
RIVERSIDE, CA 92507
PH: (q5!) 787-8421
FAX. (q5i) 682-3379
SOURCE OF TOPOGRAPHY
AERIAL TOPOGRAPHY BY:
ANALYTICAL PHOTOGRAMMETRIC SURVEYS, INC
3544 UNIVERSITY AVE SUITE IA
RIVERSIDE, CA 92501
PH: (951) 686-5103
FAX. (951) 686-1826
DATE. MAY 21, 2014
FIELD TOPOGRAPHY Br.-
IN
Y:IW CONSULTING ENGINEERS, INC
3544 UNIVERSITY AVE
RIVERSIDE, CA 42501
PA (951) 905-5300
FAX. (%I) 905-5302
DATE. JUNE 9, 2014
SO/LS ENG/NEER
GEOTEK, INC
710 E. PARKRIDGE AVENUE
CORONA, CALIFORNIA 92879
PH: (951) 710-1160
FAX. (951) 710-1167
SITE DA TA:
APN- 0241-021-19-0-000
GROSS AREA: 4.53 ACRES
LEGAL DESCRIP17ON
THE NORTH ONE-HALF OF THE WEST ONE-HALF OF
FARM LOT 621, SEMI-TROPIS LAND AND WATER h
COUNTY SUBDIVISION, IN THE CITY OF FONTANA,
COUNTY OF SAN BERNARDINO, STATE OF
CALIFORNIA, AS PER PLAT RECORDED IN BOOK 11,
PAGE 12 OF MAPS, RECORDS OF SAID COUNTY
U77LI TY PROVIDERS
FONTAX4 WATER COMPANY
SEWER: ........................................ FONTANA WATER COMPANY
ELECTRICITY ......................... SOUTHERN CALIFORNIA EDISON
GAS: ............................................. SOUTHERN GAS COMPANY
TELEPHONE:............................ ......................... SBCVPACBELL
TELEVISION:..... GOLDEN STAT FOR TIME WARNER TELECOM R
SHEET INDEX
SHEET NO SHEET DESCRIPTION s
I TITLE SHEET
2 SEWER PLAN AND PROFILE
PREPARED UNDER THE SUPERVISION OF
DRAWN BY
✓c/8S
DESIGNED BY:
X/js
ANDREW C WOODARD R. CE 8,3.557 CHECKED BY
DATE ,A4/AW
CITY OF FONTANA, CALIFORNIA
SEWER IMPROVEMENT PLAN
TRACT NO. 200 60 SCA S SgOWN
TITL SHEET DA 8/24/15 md
AI*R B"EN60E�ERW-
DA �- � % DRAWING Na: 1
R. .E. 511 5'370 2 I