Loading...
HomeMy WebLinkAbout5013-24LOCUST PEDESTAL LPI (REAR VIEIA) IN -GROUND CONCRETE PULLBOX TYPICAL SEALING FITTING TYPICAL TYPICAL TYPICAL_ . . „ „1; ;201 „.•414,?'„':„±: BUILDING WIRING TYPICAL FOR ALL CORDS IN NET NELL TYPICAL F51 . CONDUITS (POWER AND SIGNAL) TO CONCRETE PULL.BOX; SEE DETAIL 1/E3.1. EXACT ROUTE OF CONDUIT TO BE DETERMINED IN FIELD. 2. SUBMERSIBLE PRESSURE TRANSDUCER; GE "PTX -1290" SERIES; 4-20mA OUTPUT; PROVIDE HIT -4 INTRINSICALLY SAFE CONTROLS; COORDINATE CABLE LENGTH IAIITH FIELD CONDITIONS; SEE CIVIL PLANS FOR INSTALLATION REQUIREMENTS. 3. CABLE SUPPORT GRIP, HEAVY DUTY STAINLESS STEEL, OFFSET EYE SPLIT riEs1-4. ROD CLOSING liKELLutisti OR APPROVED EQUAL 4. COORDINATE FS MOUNTING HEIGHT 1AIIT1-4 CIVIL PLANS. 5. FLOAT SIAIITCH; MECHANICAL TILT FLOAT SIAIITCH; ENri-lo LEVEL REGULATOR BY ITT FLYGT. PROVIDE I^IITH INTRINSICALLY SAFE CONTROLS; SEE DETAIL 2/E32. SECURE CABLE GRIP TO NET HELL STRUCTURE. 7. SIGNAL CIRCUIT THROUGI-1 1/4ETWELL HALL; PENETRATE HALL AS 5I -1014N FOR POWER CORD. 3. BELL ADAPTER SET FLUSH INTO GROUT OF WALL PENETRATION. PUMP POWER CORD; PROVIDED klITI-1 PUMP; CONTRACTOR SHALL COORDINATE CORD LENGTH I^11T1-1 PUMP VENDOR. SEE SINGLE LINE DIAGRAM 1/.3.2 FOR CONNECTION REQUIREMENTS. 10. NET WELL IS A HAZARDOUS (CLASSIFIED) LOCATION; CLASS I DIVISION I; ELECTRICAL INSTALLATION SHALL COMPLY ACCORDINGLY. 11. EYS SEALING FITTING, SIZED FOR CONDUIT; SEE SINGLE LINE DIAGRAM. 12. 13" X 24" I .D. CONCRETE PULLBOX; SEE DETAIL 31E5.0. 13. SPLICE FEEDER IAIIRING TO PUMP POWER CABLE, USE HIGH COMPRESSION COPPER SPLICE; LONG BARREL, "BURNDY" 1-IYLINK OR EQUAL; INSULATE USING COLD SHRINK BY 3-M. 14. PVC COATED GALVANIZED RIGID STEEL CONDUIT. 15. SEE CIVIL PLANS FOR NET WELL PENETRATION REQUIREMENTS. I REMOVE REPLACE (E) POLE AND FIXTURE. 17. COORDINATE WITH UTILITY TO EXTEND AND RECONNECT E) SERVICE INTO (N) SERVICE. (E) 4" PVC FORCENAIN; SEE CIVIL PLANS LF03 CONCRETE PULLBOX LF05 LSO LS(32 (E) POWER POLE (E) TELEPHONE SERVICE POWER PEDESTAL LPI LSO3 F01 FEHR ENGINEERING COPANY, INC. 62—A HANGAR WAY WATSONVILLE, CkIFORNIA, 95076 PHONE (831) 786-0373 FAX (831) 786-8523 NORTH n EMAIL: FEC FEH R I NC. COM CONSULTING ELECTRICAL ENGINEERS SRL-=B FE JOB No. 11081.00 OF FONTANA CALIFORNIA SHOULD CONSTRUCTION OF THE REQUIRED MPROVEMEN MS.-, NOT COMMENCE WITH N TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENG NEER MAY RFOUIRE REVISIONS TO THE PLANS TO BRING THEM HiTO CONFORMANCE WITH STANDARDS N EFFECT. Sc DIAL BEFOR YOU DIG TOLL FRE PUBLIC SERVICE BY UNDERGR TW W I G DAYS BE E YOU DIG —22 00 ERVICE ALERT REV. REVISION DESCRIPTION DATE ENGR C TY DATE heeler CONSULTING CIVIL ENGINEERS 870 :CET STREET, SUITE 1278 SAN FRANCISCO, CA 94102 (415) 433-4848 FESS/04,4 4R 1 2 0 Prepared Under The Supervision Of : c !!'„„ !„,„•••• • SANITARY SEWER PUMP STATION REPAIRS DRAWN BY: C.L. LOCUST IMPROVEMENT PLAN DESIGNED BY: T.P. „0.-y Date /Y. CHECKED BY: 1NKERTON ,APPRio VE T.P.