HomeMy WebLinkAbout5013-24LOCUST PEDESTAL
LPI (REAR VIEIA)
IN -GROUND CONCRETE PULLBOX
TYPICAL
SEALING
FITTING
TYPICAL
TYPICAL
TYPICAL_
. . „
„1; ;201 „.•414,?'„':„±:
BUILDING WIRING
TYPICAL FOR ALL
CORDS IN NET NELL
TYPICAL
F51
. CONDUITS (POWER AND SIGNAL) TO CONCRETE PULL.BOX; SEE DETAIL
1/E3.1. EXACT ROUTE OF CONDUIT TO BE DETERMINED IN FIELD.
2. SUBMERSIBLE PRESSURE TRANSDUCER; GE "PTX -1290" SERIES;
4-20mA OUTPUT; PROVIDE HIT -4 INTRINSICALLY SAFE CONTROLS;
COORDINATE CABLE LENGTH IAIITH FIELD CONDITIONS; SEE CIVIL
PLANS FOR INSTALLATION REQUIREMENTS.
3. CABLE SUPPORT GRIP, HEAVY DUTY STAINLESS STEEL, OFFSET EYE
SPLIT riEs1-4. ROD CLOSING liKELLutisti OR APPROVED EQUAL
4. COORDINATE FS MOUNTING HEIGHT 1AIIT1-4 CIVIL PLANS.
5. FLOAT SIAIITCH; MECHANICAL TILT FLOAT SIAIITCH; ENri-lo LEVEL
REGULATOR BY ITT FLYGT. PROVIDE I^IITH INTRINSICALLY SAFE
CONTROLS; SEE DETAIL 2/E32.
SECURE CABLE GRIP TO NET HELL STRUCTURE.
7. SIGNAL CIRCUIT THROUGI-1 1/4ETWELL HALL; PENETRATE HALL AS
5I -1014N FOR POWER CORD.
3. BELL ADAPTER SET FLUSH INTO GROUT OF WALL PENETRATION.
PUMP POWER CORD; PROVIDED klITI-1 PUMP; CONTRACTOR SHALL
COORDINATE CORD LENGTH I^11T1-1 PUMP VENDOR. SEE SINGLE LINE
DIAGRAM 1/.3.2 FOR CONNECTION REQUIREMENTS.
10. NET WELL IS A HAZARDOUS (CLASSIFIED) LOCATION; CLASS I
DIVISION I; ELECTRICAL INSTALLATION SHALL COMPLY ACCORDINGLY.
11. EYS SEALING FITTING, SIZED FOR CONDUIT; SEE SINGLE LINE
DIAGRAM.
12. 13" X 24" I .D. CONCRETE PULLBOX; SEE DETAIL 31E5.0.
13. SPLICE FEEDER IAIIRING TO PUMP POWER CABLE, USE HIGH
COMPRESSION COPPER SPLICE; LONG BARREL, "BURNDY" 1-IYLINK OR
EQUAL; INSULATE USING COLD SHRINK BY 3-M.
14. PVC COATED GALVANIZED RIGID STEEL CONDUIT.
15. SEE CIVIL PLANS FOR NET WELL PENETRATION REQUIREMENTS.
I REMOVE REPLACE (E) POLE AND FIXTURE.
17. COORDINATE WITH UTILITY TO EXTEND AND RECONNECT E) SERVICE
INTO (N) SERVICE.
(E) 4" PVC FORCENAIN; SEE CIVIL PLANS
LF03
CONCRETE PULLBOX
LF05
LSO
LS(32
(E) POWER
POLE
(E) TELEPHONE
SERVICE
POWER PEDESTAL LPI
LSO3
F01
FEHR ENGINEERING COPANY, INC.
62—A HANGAR WAY
WATSONVILLE, CkIFORNIA, 95076
PHONE (831) 786-0373
FAX (831) 786-8523
NORTH n EMAIL: FEC FEH R I NC. COM
CONSULTING ELECTRICAL ENGINEERS
SRL-=B FE JOB No. 11081.00
OF FONTANA CALIFORNIA
SHOULD CONSTRUCTION OF THE REQUIRED
MPROVEMEN MS.-, NOT COMMENCE WITH N TWO
YEARS OF THE DATE OF APPROVAL SHOWN HEREON
AND CARRIED FORTH IN A DILIGENT MANNER, THE
CITY ENG NEER MAY RFOUIRE REVISIONS TO THE
PLANS TO BRING THEM HiTO CONFORMANCE WITH
STANDARDS N EFFECT.
Sc
DIAL
BEFOR
YOU DIG
TOLL FRE
PUBLIC SERVICE BY UNDERGR
TW W I G
DAYS BE E
YOU DIG
—22 00
ERVICE ALERT
REV.
REVISION DESCRIPTION
DATE
ENGR
C TY
DATE
heeler
CONSULTING CIVIL ENGINEERS
870 :CET STREET, SUITE 1278
SAN FRANCISCO, CA 94102
(415) 433-4848
FESS/04,4
4R
1
2 0
Prepared Under The Supervision Of :
c
!!'„„ !„,„••••
•
SANITARY SEWER PUMP STATION REPAIRS
DRAWN BY:
C.L.
LOCUST IMPROVEMENT
PLAN
DESIGNED BY:
T.P.
„0.-y
Date
/Y.
CHECKED BY:
1NKERTON
,APPRio VE
T.P.