HomeMy WebLinkAbout5013-1E LOFT
STAT ON
kalfteed
VV RIALT AV
°GUST FT
1111
T TIO
1
SLO, .ER VE
al
LADELPHI
PHILADELPHIA AVE
Th
0
0
HILLCREST DR
atomemlooftwommommosologine
GREEN VISTA DR
PHILADELPHIA AVE
SOUTHRIDGE PUMP
STATION SITE
CABERNET CT
0
o
LOCUST PUMP
STATION SITE
0
rri
0
1
2
3
4
7
2
23
24
25
26
27-28
29-30
31
32
33
DW
TIT
TITE ET
MOLI
TON PLAN
E1.0
E3.0
E.
E3.2
E4.0
E4 E.2
E5.0 -E5.1
E6.0
E.
E6.2
T EL
LOCUST ELECTRCAL MPROVEMENT PLAN
LOCUST ELECTRICAL DMPROVEMENT DETAILS
BA EE ELECTRICAL DEMOLITION PLANS
BARBEE ELECTRICAL IMPROVEMENT PLANS
ELECTRICAL DETAILS
BARBEE & LOCUST CONTROL DIAGRAMS
SOUTRIDGE CONTROL DIAGRAM
CONTROL DIAGRAM DETAILS
REED ST
SHOULD CONSTRUCTION OF THE REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN TWO
YEARS OF THE DATE OF APPROVAL SHOWN HERE°
AND CARRIED FORTH- IN A DILIGENT MANNER, T E
CITY ENGINEER MAY REQUIRE REVISIONS TO THE
PLANS TO BRING THEM INTO CONFORMANCE WT -
STANDARDS IN EFFECT.
BARBEE ST
BARBEE PUMP
STATION SITE
FOOTHILL BLVD
Prepared Under The Supervision Of :
FRE E BY UN
TOLL Ry
UI
CONSULTING CIVIL ENGINEERS
70 TSTREET, S 111 1278
SAN NCISCO, CA 94102
(415) 433-4848
DESIGNED BY:
GMA
CHECKED BY:
SCALE:
AS SHOiN
DATE:
04/12/13
REVISION DESCRIPTION
ENGR. CITY
BENJAMIN L. SHICK R.C.E. 688 3
AppF4VEEf
CTY ENGINEER
R.C.E. 51152