Loading...
HomeMy WebLinkAbout5432-1CITY SIERRA AVENUE OF FONTANA AND VALLEY INTERSECTION BOULEVARD IMPROVEMENTS TRAFFIC SIGNAL GENERAL NOTES: 1. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA DEPARTMENT OF ENGINEERING PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT—OF—WAY WITH IN THE CITY LIMITS. CALL (909) 350-7610. 2. ALL WORK, MATERIALS, EQUIPMENT AND TEMPORARY TRAFFIC CONTROL SHALL CONFORM TO THESE PLANS, THE CITY OF FONTANA STANDARD SPECIFICATIONS, THE STANDARD PLANS AND SPECIFICATIONS OF THE STATE OF CALIFORNIA, DATED 2010, AND THE CALIFORNIA MANUAL OF TRAFFIC CONTROL DEVICES, DATED 2014. 3. LOCATION OF ALL UNDERGROUND FACILITIES ARE APPROXIMATE. THE CONTRACTOR SHALL POTHOLE TO DETERMINE THE EXACT LOCATIONS AND VERIFY ALL CONDITIONS ON THE JOB SITE. HAND DIG FOUNDATINS UNTIL CLEAR OF ANY OBSTRUCTIONS. PHONE UNDERGROUND SERVICE ALERT AT (800) 227-2600, TWO (2) WORKING DAYS BEFORE DIGGING. 4. CONTRACTOR .SHALL FURNISH ALL EQUIPMENT, MATERIALS, AND HARDWARE TO CONSTRUCT THE TRAFFIC SIGNAL AND LIGHTING AS SHOWN ON THE PLANS, EXCEPT ANY CITY FURNISHED OR PROVIDED AS NOTED IN SECTION E. 5. ALL PULLBOXES SHALL BE No. 6 AND CONDUIT SHALL BE 3" RIGID METAL UNLESS OTHERWISE SHOWN. 6. CONTRACTOR SHALL MAKE APPLICATION FOR ELECTRIC SERVICE AND SCHEDULING WITH SOUTHERN CALIFORNIA EDISON COMPANY FOUR WEEKS IN ADVANCE OF NEED. 7. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT EQUIPMENT LOCATIONS PRIOR TO FINAL PLACEMENT. SEE DETAIL THIS SHEET AND SECTION E. 8. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS, AND SIDEWALK AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE ENGINEER. 9. CONTROLLER AND SERVICE CABINETS SHALL NOT BE SUBJECTED TO WATER FROM SPRINKLERS. CONTRACTOR SHALL MODIFY SPRINKLERS SYSTEMS AS NECESSARY. 10. ANY EXISTING TRAFFIC SIGNALS AND LIGHTING SHALL REMAIN IN OPERATION UNTIL REPLACED WITH NEW TRAFFIC SIGNALS AND LIGHTING. 11. CONTRACTOR SHALL REFER TO THE CITY ENGINEER IN THE EVENT OF A CONFLICT OR POTENTIAL CONFLICT WITH THESE PLANS AND,OR SPECIFICATIONS FOR THIS PROJECT. 12. TRENCH REPAIRS SHALL BE PER SPECIAL PROVISIONS, SECTION E AND CITY STANDARD PLAN 1008. 13. AS—BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS AND ELECTRONIC AUTOCAD FILES TO THE CITY ENGINEER. DRAWING NUMBERS 5141 STREET IMPROVEMENT PLANS 5432 TITLE SHEET 5433 TRAFFIC SIGNAL PLAN 5434 INTERCONNECT PLAN 5435 SIGNING/STRIPNG PLAN Q _ W"AM.- DIAL TWO WORKING BEFORE DAYS BEFORE YOU DIG YOU DIG TOLL FREE 1-800-227-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT REV. REVISION DESCRIPTION DATE ENGR. laTy DATE CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANN ER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO C 0 N FO R MANCE WITH STANDARDS IN EFFECT. Prepared Under The Supervision Of Q�p�Essloy� �``� �� µ' S'��l y .�� N0. o �, 41 Q � I '`' ,ta3o�jt $ s �rj ��j `• �.q �' � �,� o� FONTANA, CALIFORNIA CII I 0F FO TSHOULD INTERSECTION IMPROVEMENTS — TITLE SHEET oRAwN BY: SIERRA AVENUESC&' & VALL BOULEVARD N A / DESIGNED BY: DATE: 2/23/2016 CHECKED BY: APP OVED °A �/� . CITY ENGINEER R.C.E. DRAWING NO.: 5432