HomeMy WebLinkAbout5432-1CITY
SIERRA AVENUE
OF FONTANA
AND VALLEY
INTERSECTION
BOULEVARD
IMPROVEMENTS
TRAFFIC SIGNAL GENERAL NOTES:
1. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA
DEPARTMENT OF ENGINEERING PRIOR TO THE START OF ANY WORK. INSPECTION
COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO
THE START OF ANY WORK IN PUBLIC RIGHT—OF—WAY WITH IN THE CITY LIMITS.
CALL (909) 350-7610.
2. ALL WORK, MATERIALS, EQUIPMENT AND TEMPORARY TRAFFIC CONTROL SHALL
CONFORM TO THESE PLANS, THE CITY OF FONTANA STANDARD SPECIFICATIONS,
THE STANDARD PLANS AND SPECIFICATIONS OF THE STATE OF CALIFORNIA,
DATED 2010, AND THE CALIFORNIA MANUAL OF TRAFFIC CONTROL DEVICES,
DATED 2014.
3. LOCATION OF ALL UNDERGROUND FACILITIES ARE APPROXIMATE. THE
CONTRACTOR SHALL POTHOLE TO DETERMINE THE EXACT LOCATIONS AND VERIFY
ALL CONDITIONS ON THE JOB SITE. HAND DIG FOUNDATINS UNTIL CLEAR OF
ANY OBSTRUCTIONS. PHONE UNDERGROUND SERVICE ALERT AT (800)
227-2600, TWO (2) WORKING DAYS BEFORE DIGGING.
4. CONTRACTOR .SHALL FURNISH ALL EQUIPMENT, MATERIALS, AND HARDWARE TO
CONSTRUCT THE TRAFFIC SIGNAL AND LIGHTING AS SHOWN ON THE PLANS,
EXCEPT ANY CITY FURNISHED OR PROVIDED AS NOTED IN SECTION E.
5. ALL PULLBOXES SHALL BE No. 6 AND CONDUIT SHALL BE 3" RIGID METAL
UNLESS OTHERWISE SHOWN.
6. CONTRACTOR SHALL MAKE APPLICATION FOR ELECTRIC SERVICE AND SCHEDULING
WITH SOUTHERN CALIFORNIA EDISON COMPANY FOUR WEEKS IN ADVANCE OF
NEED.
7. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT
EQUIPMENT LOCATIONS PRIOR TO FINAL PLACEMENT. SEE DETAIL THIS SHEET
AND SECTION E.
8. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS,
AND SIDEWALK AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE
ENGINEER.
9. CONTROLLER AND SERVICE CABINETS SHALL NOT BE SUBJECTED TO WATER
FROM SPRINKLERS. CONTRACTOR SHALL MODIFY SPRINKLERS SYSTEMS AS
NECESSARY.
10. ANY EXISTING TRAFFIC SIGNALS AND LIGHTING SHALL REMAIN IN OPERATION
UNTIL REPLACED WITH NEW TRAFFIC SIGNALS AND LIGHTING.
11. CONTRACTOR SHALL REFER TO THE CITY ENGINEER IN THE EVENT OF A
CONFLICT OR POTENTIAL CONFLICT WITH THESE PLANS AND,OR SPECIFICATIONS
FOR THIS PROJECT.
12. TRENCH REPAIRS SHALL BE PER SPECIAL PROVISIONS, SECTION E AND CITY
STANDARD PLAN 1008.
13. AS—BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE
ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS AND
ELECTRONIC AUTOCAD FILES TO THE CITY ENGINEER.
DRAWING NUMBERS
5141 STREET IMPROVEMENT PLANS
5432 TITLE SHEET
5433 TRAFFIC SIGNAL PLAN
5434 INTERCONNECT PLAN
5435 SIGNING/STRIPNG PLAN
Q
_
W"AM.-
DIAL TWO WORKING
BEFORE DAYS BEFORE
YOU DIG YOU DIG
TOLL FREE 1-800-227-2600
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
REV.
REVISION DESCRIPTION
DATE
ENGR.
laTy
DATE
CONSTRUCTION OF THE REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN TWO
YEARS OF THE DATE OF APPROVAL SHOWN HEREON
AND CARRIED FORTH IN A DILIGENT MANN ER, THE
CITY ENGINEER MAY REQUIRE REVISIONS TO THE
PLANS TO BRING THEM INTO C 0 N FO R MANCE WITH
STANDARDS IN EFFECT.
Prepared Under The Supervision Of
Q�p�Essloy�
�``� �� µ' S'��l
y .�� N0. o �,
41 Q � I
'`' ,ta3o�jt $
s �rj ��j
`• �.q �' �
�,� o�
FONTANA, CALIFORNIA
CII I 0F FO TSHOULD
INTERSECTION IMPROVEMENTS — TITLE SHEET
oRAwN BY:
SIERRA AVENUESC&'
&
VALL BOULEVARD
N A
/
DESIGNED BY:
DATE:
2/23/2016
CHECKED BY:
APP OVED
°A �/� .
CITY ENGINEER R.C.E.
DRAWING NO.:
5432