HomeMy WebLinkAbout5404-10Z_
a: 2
ZIoI
3v
Wa
WN
CL
W
F
SECTION
92A nw I orWL
LODGE POLE
TREE TRUNK
WONDER TIE
(DO NOT TWIST)
PREVAILING WIND
DIRECTION
'WONDER TREE -TIE" - WRAP WIRE AROUND
)UTSIDE OF STAKE. SECURE TO STAKE
'ER MANUFACTURE'S RECOMMENDATION
DLACE BELOW BRANCHING YOKE OF TREE
(2) 3" DUI. x 10' LONG LODGEPOLE PINE STAKES:
LOCATE OUTSIDE OF ROOTBALL
ARBOR GUARD IN TURF AREAS
SET TOP OF ROOTBALL 6" ABOVE FINISH
GRADE. INSTALL 4" LAYER OF NITROLIZED
WOOD CHIP MULCH.
DEEP ROOT BARRIER
IF WITHIN 5' OF ANY
HARDSCAPE (SEE DETAIL)
WATER BASIN / REMOVE ONCE PLANT IS
ESTABLISHED PER LANDSCAPE ARCH DIRECTION
PLANT PIT DRAIN WHEN REQUIRED
(PER SEPARATE DETAIL)
GRO POWER FERTILIZER TABLETS.
APPLICATION RATES PER TABLE. REFER
TO PLANTING NOTES.
BACKFILL MIX PER SPECS.
NATIVE SOIL SUBGRADE
EXCAVATE TO CORRECT HEIGHT
FOR PLANTING. SCARIFY BOTTOM
TO ENSURE ADEQUATE DRAINAGE
FOR HEALTHY GROWTH OF PLANT.
SCHEDULE OF PIT EXCAVATION
5GAL -X=6"
15 GAL -X-9"
24" BOX - -X = 12" MAX.
TREE PLANTING
GROUNDCOVER PLANTING
STORM DRAIN/
UNDERGROUND UTILITIES R
TYP. TYP. \
UNDERGROUND STRUCTURE
CAT
[TRANSFORMER
CH BASIN
——— VAULT. i
�..—..—.. —..—..—.. —�R
SIDEWALK ` I W
10
DRIVE O Z
I APPROACH I S.L.
CURB AND GUTTER
59 5' 10' 10'
MIN MIN MIN MIN
5'
NOTES: MIN
1. TREE SPACING SHALL CONFORM TO PLANS APPROVED BY
THE CITY ENGINEER & FUEL MODIFICATION PLAN.
2. ALL TREES IN THE R.O.W. ARE SUBJECT TO LINE.OF.SIGHT
CRITERIA AS APPROVED BY TRAFFIC ENGINEER.
3. AT ALL LOCAL RESIDENTIAL INTERSECTIONS THE FIRST TWO
PARKWAY TREES AT ALL APPROACHES TO BE PLACED BEHIND SIDEWALK.
4. MAINTAIN 10 FEET FROM CENTER OF STREET TO EDGE
OF ALL UNDERGROUND FACILITIES.
Call Underground Service Alert 5. MAINTAIN 10 FEET FROM ALL STREET LIGHTS, UTILITIES
at least 2 days STRUCTURES AND VALVE BOXES.
before you dig
K"aw,ersbelow. TREE PLACEMENT
Call before you dig.
0
LODGE POLE
TREE TRUNK
WONDER TIE
(DO NOT TWIST)
PREVAILING WIND
DIRECTION
YONDER TREE -TIE" - WRAP WIRE AROUND
)UTSIDE OF STAKE. SECURE TO STAKE
'ER MANUFACTURE'S RECOMMENDATION
'LACE BELOW BRANCHING YOKE OF TREE
(2) 3" DIA, x 10' LONG LODGEPOLE PINE STAKES:
LOCATE OUTSIDE OF ROOTBALL
ARBOR GUARD IN TURF AREAS
SET TOP OF ROOTBALL 3" ABOVE FINISH
GRADE INSTALL 4" LAYER OF NITRO IZED
WOOD CHIP MULCH.
WATER BASIN / REMOVE ONCE PLANT IS
ESTABLISHED PER LANDSCAPE ARCH DIRECTION
PLANT PR DRAIN WHEN REQUIRED
PER SEPARATE DETAIL
GRO POWER FERTILIZER TABLETS.
APPLICATION RATES PER TABLE REFER
TO PLANTING NOTES.
BACKFILL MIX PER SPECS.
NATIVE SOIL SUBGRADE
EXCAVATE TO CORRECT HEIGHT
FOR PLANTING. SCARIFY BOTTOM
TO ENSURE ADEQUATE DRAINAGE
FOR HEALTHY GROWTH OF PLANT.
SCHEDULE OF PIT EXCAVATION
5GAL -X-6"
15 GAL -X-9"
24" BOX - -X = 12" MAX.
TREE PLANTING ON SLOPE
8"
MIN'
-HOLD ROOTBALL ABOVE ULTIMATE
FVISHED GRADE:
1 FOR 1 GAL
2"FOR 5& 15 GAL
DG LAYER PER SPECIFICATIONS
GRO POWER FERTILIZER TABLETS.
APPLICATION RATES PER TABLE.
REFER TO SPECS.
BACKFILL MIX PER NOTES.
SHRUB PLANTING
6"
AIN:
L
co
cV
_09
OR OR
PER MFR. OF TREE PER MFR.
SPEC. SPEC.
i r 191 0O
LA
ILA rM
HOLD ROOTBALL ABOVE ULTIMATE
FjNISHED GRADE:
1 FOR 1 GAL
2"FOR 5& 15 GAL
DG LAYER PER SPECIFICATIONS
TEMPORARY 2" HIGH WATER
BASIN. REMOVE ONCE PLANT IS
ESTABLISHED
GRO POWER FERTILIZER TABLETS.
APPLICATION RATES PER TABLE.
REFER TO SPECS.
BACKFILL MIX PER NOTES.
NOTES:
A. POSITION BARRIER AS
CLOSE TO CURB OR
SIDEWALK AS POSSIBLE.
RAISED ROOT PROTECTORS
SHALL BE FACING
TOWARDS THE TREE.
B. TOP OF BARRIER SHALL
BE 1" ABOVE FINISHED
GRADE.
C. LENGTH OF ROOT BARRIER
SHALL BE EQUAL TO
THE ULTIMATE DRIPLINE OF
THE PARTICULAR TREE, OR
10' MAX.
LEGEND:
1Q CONCRETE CURB OR
HARDSCAPE
8 FINISHED GRADE
APPROVED ROOT CONTROL
BARRIER
® 3/4" TO 1 1/2- GRAVEL
OR CRUSHED ROCK
DRIP LINE OF TREE
6 CENTER OF TREE
PARKWAY WIDTH
ROOT BARRIER IS TO BE 18"
LINEAR BARRIER UB 18-2
WHEN ADJACENT TO WALK
OR HARDSCAPE OR 24"
LINEAR BARRIER
UB 24-2 WHEN ADJACENT
TO CURB
AVAILABLE FROM:
CENTURY PRODUCTS
1144 N. GROVE ST.
ANAHEIM, CA 92806
(714) 632-7083
TREE OR PALM TRUNK
SIDEWALK (WHERE OCCURS) ROOTBALL
/") FPIPE CAP
r FIN. GR.
j 3" DIA. SCH. 80
PVC STAND PIPE
CANTER BACKFILL MIX
ooeeecocoauocecec000coc 000, COMPACTED SOIL
0000000000000000000000000 0000.o. BACKFILL00000000o0o00oo0000oo00 000
00000-0000000000000000000000 oo...
Eiji 3" DIA. CORRUGATED
A.D.S. PERFORATED
RAIN PIPE W/ DRAIN
1 1/2x ROOTBALL SIZE SOCK LAID O BASE
OF ROOTBALL
SECTION
— — — —� TREE OR PALM TRUNK
(� ROOTBALL
II
I I3" DIA. SCH. 80
L PVC STAND PIPE W/
I I PIPE CAP
LIMITS OF PLANT PIT
— — 3" DIA. CORRUGATED A.D.S. PERFORATED
�— — — — —� RAIN PIPE W/ DRAIN SOCK LAID O
BASE OF ROOTBALL
PLAN VIEW
PIT DRAIN DETAIL
NOTES:
O1 BURY A MINIMUM OF 1/3 DEPTH
OF BOULDER SIZE.
Q BOULDER — SEE Q
O3 SCARRED OR BROKEN BOULDERS
SHALL NOT BE PERMITTED.
O PLACE PER PLANS AND
LANDSCAPE ARCHITECT'S DIRECTION
avio vvmrnv i u -
D SOIL
APPROX. BOULDER FOOTPRINT SIZES
2' X 2 x 2'= 8 CU/FT
3'X3'X3'=27 CU/FT
3'T
4 4' X 4' X 4'= 64 CU/FT
BOULDER INSTALLATION DETAIL
TREE & PLANTING NOTES:
All trees shall be located as follows:
- A min. of 25' from beginning of curb returns at any street intersection.
- 10' from light standard or utility enclosures.
- 5' from fire hydrants.
- A min, of 3' from sidewalk edge, face of wall or back of curb.
- For trees shown to be planted within parkway
less than 6' wide, center tree accordingly.
- No tree shall be planted in parkway less than 4' wide.
- Provide appropriate size linear "Century" root barrier
for any tree planted with in 7' of hardscape element,
such as curbs, sidewalks or walls.
- Hold center of all shrubs or groundcover a min. of 24"
away from edge of paving (typ.)
PLANTING NOTES
WEED CONTROL
WHERE PERENNIAL WEEDS EXIST ON SITE AT THE BEGINNING OF WORK, CLEAN AND REMOVE
THESE EXISTING WEEDS BY MOWING OR GRUBBING OFF ALL PLANT MATERIAL. UPON
COMPLETION OF SOIL PREPARATION AND PLANTING OF ALL SPECIMEN TREES, BEGIN WEED
ABATEMENT PROGRAM BY APPLYING: 100 POUNDS OF A COMMERCIAL FERTILIZER, 46-0-0, PER
ACRE AND PER MANUFACTURER'S SPECIFICATIONS. WATER ALL AREAS FOUR (4) TIMES DAILY
FOR FOURTEEN (14) CONSECUTIVE DAYS UNTIL WEED SEEDS HAVE GERMINATED. CEASE
WATERING FOR THREE (3) DAYS. SPRAY A NON-SELECTIVE, NON -RESIDUAL, SYSTEMIC
HERBICIDE TO ERADICATE GERMINATED WEEDS. LET THE WEEDS DIE WITHOUT IRRIGATION
FOR A MINIMUM DEPTH OF 1/4"INCH BELOW THE SURFACE OF THE SOIL. IF STUBBORN AND
RESIDUAL WEEDS (I.E. BERMUDA) SHOULD PERSIST ERADICATION PROCEDURE SHOULD BE
REPEATED. THE TYPE OF WEEDS THAT EXIST SHOULD BE IDENTIFIED AND COORDINATED WITH
AN APPROVED LICENSED PEST CONTROL ADVISOR TO ENSURE COMPATIBILITY WITH CHEMICAL
AND SEASON OF APPLICATION. DO NOT USE MATERIAL OR METHOD THAT WOULD ADVERSELY
EFFECT NEW PLANTINGS, SLOPE STABILIZATION OR HYDROSEEDING.
SOIL TEST
AFTER ALL SOIL HAS BEEN IMPORTED TO THE SITE AND ROUGH GRADING COMPLETED BUT
PRIOR TO SOIL PREPARATION, SEVERAL SOIL SAMPLES SHALL BE TAKEN BY THE SOILS LABORATORY
OR BY THE CONTRACTOR AT THEIR INSTRUCTION AND A REPORT/RECOMENDATION
PRODUCED. THE CONTRACTOR SHALL FURNISH A COPY OF THE SOIL TEST FOR
AGRICULTURAL SUITABILITY AND FERTILITY (PREPARED BY A CALIFORNIA ASSOCIATION OF
AGRICULTURAL LABORATORIES MEMBER) TO THE CONTRACTING OFFICER AND THE CITIES INSPECTOR,
UPON REVIEWING THE SOILS REPORT THE ARCHITECT MAY MAKE SPECIES
SUBSTITUTIONS TO THE PLANT LIST.
SOIL PREPARATION
MACHINE ROTOTILL THE FOLLOWING AMENDMENTS INTO THE SOIL AT RATES INDICATED PER
1000 SF: (THESE RATES ARE FOR BID PURPOSES ONLY, ACTUAL RATES TO CORRESPOND TO
CONTRACTOR'S SOILS REPORT).
4 CU. YDS NITROGEN STABILIZED SAWDUST
150 LBS. GYPSUM
125 LBS STANDARD FERTILIZER
DEEP ROOT BARRIERS
ALL TREES WITHIN 7 FEET OF ANY PERMANENT HARDSCAPE ELEMENT SUCH AS CONCRETE
WALKS, WALLS OR BUILDINGS SHALL BE PLANTED WITH AN APPROPRIATE SIZED ROOT
BARRIER (UNLESS OTHERWISE NOTED ON PLANS). ROOT BARRIER TO BE LINEAR PANEL (M.)
SEE DETAIL.
TOP DRESSING (FUEL MODIFICATION AREA)
ALL SHRUB AND GROUNDCOVER AREAS SHALL BE TOP DRESSED WITH A 1 "-1/2" LAYER OF DECOMPOSED
GRANITE/FRACTURED ROCK. SEE TOP DRESSING LEGEND FOR SPECIFICATIONS
(SUBMIT SAMPLE TO CITY LANDSCAPE ARCHITECT FOR APPROVAL) USE TAN IRRIGATION BOXES
PLANTING LEGEND
SYMBOL KEY BOTANICAL NAME COMMON NAME SIZE WUCOLS QTY. COMMENTS
TREES
A Pistachia chinensis Chinese Pistache 36" Box M 16 STD.
B Pyrus c. 'Chanticleer' Chanticleer Pear 24" Box M 42 STD.
• C Magnolia g. 'Russet' Southern Magnolia 36" Box M 3 Low Branch
D Lagerstroemia h. 'Natchez' Crape Myrtle (White) 24" Box M 14 STD.
E Arbutus 'Marina' Strawberry Tree 24" Box L 19 STD.
o .
TOP DRESSING LEGEND
F
BOTANICAL NAME
SHRUBS
SYMBOL
KEY
QTY
Agave'Blue Flame'
G)
2
L
3
Agave vilmoriniana
4
Q
5
76
6
Sunny Bacia African Daisy
7
Q
8
0
9
®
10
470
VINES
New Gold LantanaSG
V-1
TOP DRESSING LEGEND
F
BOTANICAL NAME
COMMON NAME
SIZE (DIA.)
WUCOLS
QTY
Agave'Blue Flame'
Blue Flame Agave
5G (18")
L
58
Agave vilmoriniana
Octopus Agave
15G (4211)
L
76
Osteospermum 'Sunny Bacia'
Sunny Bacia African Daisy
1 G @ 30" o.c.
M
407
Dianella revoluta'Baby Bliss'
Baby Bliss Flax Lily
1G @ 24" O.C.
M
470
Lantana 'New Gold'
New Gold LantanaSG
(48")
M
57 `
Myoporum'Pacificum'
Pacificum Spreading Myoporum 1G @ 24" o.c.
M
1,202
Salvia chamaedryoides
Mexican Blue Sage
5G (36")
M
108
Yucca recurvifolia'Monica'
Banana Split Yucca
5G (48")
L
59
Hesperaloe x. 'Pink Parade'
Pink Parade Hesperaloe
5G (18")
L
59
Echium fastuosum
Pride of Madeira
5G
L
32
Parthenocissus tricuspidata Boston Ivy IG STAKED M 57
@ 20' o.c.
(See Sheet L-1 for top dressing locations)
Single layer of 12" to 18" 'Desert Gold' hand -packed fractured rock,
grouted over native. Rock available from Southwest Boulder & Stone
(760) 342-5522. Install per Fractured Rock detail on sheet L-3. Rock and
installation shall match existing Sierra Avenue streetscape between Terra
Vista and Duncan Canyon Road.
1" - 1 1/2" layer of 'Desert Gold' 3/8" fractured rock over smooth finish
grade as mulch/bark substitute after all planting. Submit sample to
Landscape Architect for approval prior to installation. Available from
Southwest Boulder & Stone (760) 342-5522. Rock and installation shall
match existing Sierra Avenue streetscape between Terra Vista and
Duncan Canyon Road.
1"-1 1/2" layer of 'Apache Brown' 3/4" to 1" fractured rock over smooth
finish grade as mulch/bark substitute after all planting. Submit sample to
Landscape Architect for approval prior to installation. Available from
Southwest Boulder & Stone (760) 342-5522. Rock and installation shall
match existing Sierra Avenue streetscape between Terra Vista and
Duncan Canyon Road.
T Ie C A P e
Landscape Architecture
and Planning
3190 B2 Airport Loop Drive
Costa Mesa, CA 92626
Richard Polhamus, License CA—#2782
(949) 644-9370 (714) 210-3140 FAX
NO. REVISION
®Rev. Per Civil Eng.
12-17-15
CITY OF FONTANA
0
o
LANDSCAPE PLANS
nmw" B''
SIERRA AVE. STA. 152 + 53.37 TO 166 + 50.00
scmz
SA
SEGOVIA LN. STA. 10 + 50.00 TO 18 + 61.48
PLANTING DETAILS NOTES & LEGEND
AS SHOWN
We
MTD
ss
+11.0
00
CHECKED sn
APPROM srs
ays NW
10
O
�DAM
5404
16
C)
T Ie C A P e
Landscape Architecture
and Planning
3190 B2 Airport Loop Drive
Costa Mesa, CA 92626
Richard Polhamus, License CA—#2782
(949) 644-9370 (714) 210-3140 FAX
NO. REVISION
®Rev. Per Civil Eng.
12-17-15
V
0
o
00
1�1:
o
�
00
w
+
+11.0
00
�t
q
•�
�p
O
�O
"11
00
V
C)
O
H�
^
O
�
WO
0
M
0
CD
6
rrU�x
a
M
in
O
H
+
W
+
o
CU
I�I
IN
V
.,
�
00
•�
•�
�p
O
�O
"11
00
a
U
^
O
�
Q
��
r__q
LSPCI 15-000045
DATE
08-14-15
JOB
15-020
L 9
OF 16