HomeMy WebLinkAbout5404-1SIE��A
LA�JC�SCAPE PLA�JS
SIEF;�A
C1TY c�F
FOtJ�A�JA.
CALIFna I�IA
Upland, CA
City Required Notes : Soils Management Plan
Inspections: Requirements:
1. Contractor shall obtain soils tests covering all planting areas.
After completion of finish grading and prior to start of soil
l .It is the Landscape Contractor's responsibility to contact the preparation work. tests shall be performed by an approved California
agronomic soils testing laboratory and shall include a fertility and
Engineering Division's Landscape Inspector suitability analysis with written recommendations for soil preparation
and planting backfill mix. The amendments in these specifications are
48 hours prior to desired inspection of an item at (909) 350-6632 the minimum requirement and are for bid purposes. All soils
conditioning and amendments shall be per the final soil report
2.Prior to the release of utilities or maintenance period commencement, recommendations. The minimum amendment and fertilizerapplication rates specified herein only when they exceed the specified
the following inspections are required: minimums.
Pre -construction meeting 2. The project applicant, or his/her designee, shall comply with the
Inspection of irrigation system in open trench condition (prior to backfill). following:
a) The soil management report shall be submitted to the city as part
Mainline pressure test @ 150 p.s.i. for a three {3) hour period. of the certificate of completion prior to the certificate of
Irrigation coverage tests including initial and final tests. occupancy.
Finish grade prior to planting. 3. The soil management report shall be made available to the city
Plant materials prior to planting. landscape inspector or inspector designated by the City Engineer, and
Planting, including street trees. Contact the Parks Planning and Landscape to the landscape contractor prior to the installation of any plantmaterial.
Development section Engineering Division, for species and final locations.
4. The project applicant, or his/her designee, shall have an inspection by
Compliance with approved plans. a city landscape inspector or inspector designated by the city
Final Inspection. engineer, verifying implementation of soil management report
recommendations.
3.The Owner's representative and Landscape Contractor shall be present at each inspection.
The City of Fontana "Standard Landscape Specification Manual for Streetscapes" shall
become a part of this document.
Maintenance Guidelines
Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall include but
not be limited to:
1. Cultivation of planted beds at intervals not to exceed ten (10) days.
2. Regular mowing to maintain lawn height not to exceed two (2) inches (will vary with species).
3. Regular pruning of plants as necessary to control and direct growth
4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for
proper plant growth. Drip irrigation may require specialized landscape maintenance care.
5. Immediate replacement of irrigation materials as needed to maintain good working condition.
6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant
growth.
7. Immediate repair or replacement of irrigation materials as needed to maintain good working condition.
8. Stakes, guys, and ties on trees shall be checked regularly for correct function. Ties are to be
adjusted to avoid abrasions or girdling of trunk or branches.
9. Upon completion of a minimum of three (3) month (90 day) contract maintenance period, an inspection shall be
made by the Community Development Department Engineering Division Landscape Inspection Staff. The
landscape shall be maintained in accordance with these landscape maintenance standards.
10. The Developer/Builder is responsible to contact the City and schedule the maintenance inspection.
SOILS REPORT NOTE:
After grading of site is complete, soils report will be prepared and provided by owner to
contractor for his information prior to construction. Upon completion of project, owner will
provide report to city inspector for record purposes.
SITESCAPES, INC. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND
SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE
ARCHITECTURAL STANDARDS. SITESCAPES, INC. CANNOT GUARANTY THE
QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF
IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS
ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR
PROPERTY DAMAGE RESULTING FROM DEVIATIONS. SITESCAPES, INC.
IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION
WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR THEREAFTER.
ffPolF �L I W�
15
PROJECT SITE
W
z
z
GRAPELAND/
> SEGOVIA
O �
Q'
DUNCAN CN Y RD. Lij
LIJ
v5
O I—
w SUMMIT AVE
Li
U
SHEET KEY
ISI
III
I
i
QI;
PROJECT SITE lo'
I
10
10
,
GRAPELAND/SEGOVIA
N.T.S.
T-1 TITLE SHEET
L- 1 CONSTRUCTION PLAN (20 SCALE)
L- 2 CONSTRUCTION PLAN (20 SCALE)
L- 3 CONSTRUCTION DETAILS, NOTES & LEGEND
L- 4 CONSTRUCTION DETAILS
L- 5 IRRIGATION DETAILS, NOTES & LEGEND
L- 6 IRRIGATION DETAILS, CALCULATIONS & SCHEDULE
L- 7 IRRIGATION PLAN (20 SCALE)
L- 8 IRRIGATION PLAN (20 SCALE)
L- 9 PLANTING DETAILS, NOTES & LEGEND
L- 10 PLANTING PLAN (20 SCALE)
(TREES & GROUNDCOVER)
L- 11 PLANTING PLAN (20 SCALE)
(TREES & GROUNDCOVER)
L- 12 PLANTING PLAN (20 SCALE)
(SHRUBS)
L- 13 PLANTING PLAN (20 SCALE)
(SHRUBS)
L- 14 LIGHTING PLAN (20 SCALE)
L- 15 SPECIFICATIONS
COMPLIANCE STATEMENT
1 AGREE TO COMPLY WITH THE REQUIREMENTS OF THE WATER EMCIENT LANDSCAPE
ORDINANCE AND SUBMIT A COMPLETE LANDSCAPE DOCUMENTATION PACKAGE.
12/17/15
RICK POLHAMUS-LA12782----EXP. 10/17 DATE. -
CFD Overall Quantity Breakdown
Landscape = 112,228 S.F.
Sidewalk 21,008 S.F.
Fuel Mod = 245,375 S.F.
Hardscape = 12,385 S.F.
(Decomposed Granite - 7,962 S.F.)
(Fractured Rock Area - 4,423 S.F.)
CFD Quantity Breakdown - This Plan Only
Turf area = 0 S.F.
Planter area = 37,124 S.F.
Decorative Gravel area (Unplanted) = 2,000 S.F.
Frac. Rock area (Unplanted) = 3,160 S.F.
Public Sidewalk within R.O.W. = 15,866 S.F.
Median (Unimproved) = 0 S.F.
Total square footage of landscape area= 58,150 S.F.
JOB NO.
AxD s C`1pe
° qq�� 15-020
2 82
**
SIGNATURE DATE
.n 12/17/15 �Q-
%`
8-14-15
APPROVALS
.000 0000
S I T S C A P U S
Landscape 3190 B2 Airport Loop Dr., (949) 644-9370
Architecture Costa Mesa, CA. 92626 FAX (714) 210-3140
& Planning Richard Polhamus, License # 2782
SUBMITTALS
1ST SUBMITTAL: 9/23/15
2ND SUBMITTAL: 11/16/15
3RD SUBMITTAL: 1/11/16
4TH SUBMITTAL: 2/15/16
A P"R GALS
EISA N S
0 Rev. Per Civil Eng_
12-17-15
0
D 0
0
CITY OF FONTANA
LANDSCAPE PLANS
DRAWN BY: SIERRA AVE. STA. 152 + 53.37 TO 166 + 50.00 sem:
SA SEGOVIA LN. STA. 10 + 50.00 TO 18 + 61.48 AS SHOWN
DESIGNED BY. TITLE SHEET DAT
DE S E.
CHECKED BY: APPROVED BY: DWG. NO.: 1
DATE* 5404 16
SS R.C.E.
CITY ENGINEER 51152 EXP. DATE
O
Z
V
i
0
a
LSPC 15-000045