Loading...
HomeMy WebLinkAbout5404-1SIE��A LA�JC�SCAPE PLA�JS SIEF;�A C1TY c�F FOtJ�A�JA. CALIFna I�IA Upland, CA City Required Notes : Soils Management Plan Inspections: Requirements: 1. Contractor shall obtain soils tests covering all planting areas. After completion of finish grading and prior to start of soil l .It is the Landscape Contractor's responsibility to contact the preparation work. tests shall be performed by an approved California agronomic soils testing laboratory and shall include a fertility and Engineering Division's Landscape Inspector suitability analysis with written recommendations for soil preparation and planting backfill mix. The amendments in these specifications are 48 hours prior to desired inspection of an item at (909) 350-6632 the minimum requirement and are for bid purposes. All soils conditioning and amendments shall be per the final soil report 2.Prior to the release of utilities or maintenance period commencement, recommendations. The minimum amendment and fertilizerapplication rates specified herein only when they exceed the specified the following inspections are required: minimums. Pre -construction meeting 2. The project applicant, or his/her designee, shall comply with the Inspection of irrigation system in open trench condition (prior to backfill). following: a) The soil management report shall be submitted to the city as part Mainline pressure test @ 150 p.s.i. for a three {3) hour period. of the certificate of completion prior to the certificate of Irrigation coverage tests including initial and final tests. occupancy. Finish grade prior to planting. 3. The soil management report shall be made available to the city Plant materials prior to planting. landscape inspector or inspector designated by the City Engineer, and Planting, including street trees. Contact the Parks Planning and Landscape to the landscape contractor prior to the installation of any plantmaterial. Development section Engineering Division, for species and final locations. 4. The project applicant, or his/her designee, shall have an inspection by Compliance with approved plans. a city landscape inspector or inspector designated by the city Final Inspection. engineer, verifying implementation of soil management report recommendations. 3.The Owner's representative and Landscape Contractor shall be present at each inspection. The City of Fontana "Standard Landscape Specification Manual for Streetscapes" shall become a part of this document. Maintenance Guidelines Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall include but not be limited to: 1. Cultivation of planted beds at intervals not to exceed ten (10) days. 2. Regular mowing to maintain lawn height not to exceed two (2) inches (will vary with species). 3. Regular pruning of plants as necessary to control and direct growth 4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for proper plant growth. Drip irrigation may require specialized landscape maintenance care. 5. Immediate replacement of irrigation materials as needed to maintain good working condition. 6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant growth. 7. Immediate repair or replacement of irrigation materials as needed to maintain good working condition. 8. Stakes, guys, and ties on trees shall be checked regularly for correct function. Ties are to be adjusted to avoid abrasions or girdling of trunk or branches. 9. Upon completion of a minimum of three (3) month (90 day) contract maintenance period, an inspection shall be made by the Community Development Department Engineering Division Landscape Inspection Staff. The landscape shall be maintained in accordance with these landscape maintenance standards. 10. The Developer/Builder is responsible to contact the City and schedule the maintenance inspection. SOILS REPORT NOTE: After grading of site is complete, soils report will be prepared and provided by owner to contractor for his information prior to construction. Upon completion of project, owner will provide report to city inspector for record purposes. SITESCAPES, INC. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE ARCHITECTURAL STANDARDS. SITESCAPES, INC. CANNOT GUARANTY THE QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR PROPERTY DAMAGE RESULTING FROM DEVIATIONS. SITESCAPES, INC. IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR THEREAFTER. ffPolF �L I W� 15 PROJECT SITE W z z GRAPELAND/ > SEGOVIA O � Q' DUNCAN CN Y RD. Lij LIJ v5 O I— w SUMMIT AVE Li U SHEET KEY ISI III I i QI; PROJECT SITE lo' I 10 10 , GRAPELAND/SEGOVIA N.T.S. T-1 TITLE SHEET L- 1 CONSTRUCTION PLAN (20 SCALE) L- 2 CONSTRUCTION PLAN (20 SCALE) L- 3 CONSTRUCTION DETAILS, NOTES & LEGEND L- 4 CONSTRUCTION DETAILS L- 5 IRRIGATION DETAILS, NOTES & LEGEND L- 6 IRRIGATION DETAILS, CALCULATIONS & SCHEDULE L- 7 IRRIGATION PLAN (20 SCALE) L- 8 IRRIGATION PLAN (20 SCALE) L- 9 PLANTING DETAILS, NOTES & LEGEND L- 10 PLANTING PLAN (20 SCALE) (TREES & GROUNDCOVER) L- 11 PLANTING PLAN (20 SCALE) (TREES & GROUNDCOVER) L- 12 PLANTING PLAN (20 SCALE) (SHRUBS) L- 13 PLANTING PLAN (20 SCALE) (SHRUBS) L- 14 LIGHTING PLAN (20 SCALE) L- 15 SPECIFICATIONS COMPLIANCE STATEMENT 1 AGREE TO COMPLY WITH THE REQUIREMENTS OF THE WATER EMCIENT LANDSCAPE ORDINANCE AND SUBMIT A COMPLETE LANDSCAPE DOCUMENTATION PACKAGE. 12/17/15 RICK POLHAMUS-LA12782----EXP. 10/17 DATE. - CFD Overall Quantity Breakdown Landscape = 112,228 S.F. Sidewalk 21,008 S.F. Fuel Mod = 245,375 S.F. Hardscape = 12,385 S.F. (Decomposed Granite - 7,962 S.F.) (Fractured Rock Area - 4,423 S.F.) CFD Quantity Breakdown - This Plan Only Turf area = 0 S.F. Planter area = 37,124 S.F. Decorative Gravel area (Unplanted) = 2,000 S.F. Frac. Rock area (Unplanted) = 3,160 S.F. Public Sidewalk within R.O.W. = 15,866 S.F. Median (Unimproved) = 0 S.F. Total square footage of landscape area= 58,150 S.F. JOB NO. AxD s C`1pe ° qq�� 15-020 2 82 ** SIGNATURE DATE .n 12/17/15 �Q- %` 8-14-15 APPROVALS .000 0000 S I T S C A P U S Landscape 3190 B2 Airport Loop Dr., (949) 644-9370 Architecture Costa Mesa, CA. 92626 FAX (714) 210-3140 & Planning Richard Polhamus, License # 2782 SUBMITTALS 1ST SUBMITTAL: 9/23/15 2ND SUBMITTAL: 11/16/15 3RD SUBMITTAL: 1/11/16 4TH SUBMITTAL: 2/15/16 A P"R GALS EISA N S 0 Rev. Per Civil Eng_ 12-17-15 0 D 0 0 CITY OF FONTANA LANDSCAPE PLANS DRAWN BY: SIERRA AVE. STA. 152 + 53.37 TO 166 + 50.00 sem: SA SEGOVIA LN. STA. 10 + 50.00 TO 18 + 61.48 AS SHOWN DESIGNED BY. TITLE SHEET DAT DE S E. CHECKED BY: APPROVED BY: DWG. NO.: 1 DATE* 5404 16 SS R.C.E. CITY ENGINEER 51152 EXP. DATE O Z V i 0 a LSPC 15-000045