HomeMy WebLinkAbout5413-8 Imiill
W
W
CC
I—
MODIFY (E) WET WELL CO
(E) SIDEWALK SEE SECTION N9
PROTECT (E) FENCE REMOVE AND REPLACE J
IN PLACE IN KIND AS REQ'D FOR
CONSTRUCTION O
(E) 4" PVC FORCEMAIN 1
DISCHARGE LOCATED IN MH (E) ELECTRICAL PANEL
AT INTERSECTION OF 7 TO BE REMOVED I.
GRANADA AND LOCUST
4-
///'///1/1/ /� ♦� ///////////// G. ,,/ /Y<////////////////////////////////////////////
____ _
, , • 7 / /
/ / I
ice . /.% - ,._ �L ��� , \, •, 1
4/ //
/
• REMOVE (E) AC PAVEMENT
I
/ (f
/ 400 II:
.
FOC ��OC A
(E) STREET LIGHT
(E) POWER POLE
REMOVE AND REPLACE REMOVE
(E) CONC. CURB AND (E) DRY WELL (E) 8" VCP TO (E)
GUTTER AS READ
MH AT INTERSECTION
S
FOR CONSTRUCTION
LOCUST AVENUE
,N,
REMOVE (E) ELECTRICAL o LOCUST PUMP STATION DEMOLITION SITE PLAN
PANEL SCALE:1" =4'
j/ REMOVE (E) ACCESS TUBE
/ AND LADDER AS SHOWN
,I
Si
EL= 1201.42'
a
,/
REMOVE FORCEMAIN
• RISER AND ELBOW 0
a
40
� EL= 1192'
/ 'I REMOVE (E) PIPE AS REQ'D
REMOVE (E) DRYWELL �% - FILL REMAINING PIPE BYPASS PUMPING NOTES:
STRUCTURE / W/CONCRETE 1. FORCEMAIN IS 4" IN DIAMETER AND APPROXIMATELY1100' IN LENGTH DISCHARGING AT
V i/ - THE INTERSECTION L ST AVE AND GRENADA AVE. DISCHARGE ELEVATION IS
,�//, OFOCU
�w�
V d ii! r _ APPROXIMATELY 1214'.
REMOVE ALL (E) ELECTRICAL %ØV \ A.
� 0 c"AND PUMPING EQUIPMENT - 2. CONTRACTOR SHALL PROVIDED BYPASS PUMPING EQUIPMENT AS NEEDED TO BYPASS
�1PUMP 161 GPM AT 50'TDH WITH FULL MECHANICAL REDUNDANCY THROUGHOUT THE
EL= 1183.60 I. I DURATION OF THE PROJECT. SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS
3. ALL SEWAGE SHALL BE CONVEYED THROUGH EXISTING FORCEMAIN. THERE ARE NO
ADJACENT SYSTEMS TO BYPASS INTO.
DEMOLITION SECTION A
SCALE:1" =4' 8 RECORD DRAWING
BASED ON FIELD INFORMATION
PROVIDED BY HPS MECHANICAL, INC.
Do i,O p�FESS - Prepared Under The Supervision Of : CITY OF FONTANA, CALIFORNIA
SHOULD CONSTRUCTION OF THE REQUIRED L h of & \Vheeler , Q�°e IMPROVEMENTS NOT COMMENCE WITHIN TWOSc Gl �� > -
CONSULTING CIVIL ENGINEERS - 2 DRAWN BY: SCALE:
YEARS OF THE DATE OF APPROVAL SHOWN HEREON Vill cc 10.68813 , Do GMA LOCUST PUMP STATION AS SHOWN
AND CARRIED FORTH IN A DILIGENT MANNER, THE DIAL TWO WORKING 870 MARKET STREET, SUITE 1278 * * DESIGNED BY: OLITIO►( PLAN & SECTION DATE:
BEFORE I, DAYS BEFORE SAN FRANCISCO CA 94102 s GMA 04/12/13
CITY ENGINEER MAY REQUIRE REVISIONS TO THE Y❑u DIG �iV��
YOU DIG Y, REV. 1 RECORD DRAWINGS 5/6/15 BLS 41$ 433-4848 -17.4, 4,cA��Fo� Date /. CHECKED BY: A“;:•VED : . DRAWING NO.: 8
PLANS TO BRING THEM INTO CONFORMANCE WITH TOLL FREE 1-800-227-2600 /VOW DATE�/L• �`
BENJAMIN L. SHICK R.C.E. 68813 ��
STANDARDS IN EFFECT. A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT REVISION DESCRIPTION DATE ENGR. CITY DATE BLS C �NGINEER R.C.E. 51152 C8 3
5473