HomeMy WebLinkAbout5367-1CITY OF FONTANA STREET IMPROVEMENT NOTES
1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS,
THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS
CONSTRUCTIONS ('GREEN BOOK'). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE
LATEST EDITION UNLESS OTHERWISE NOTED.
2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE
RESOLVED BY REFERENCE TO PRECEDENCE' PROVISIONS IN THE "GREEN BOOK" THE CONTRACTORS
SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEERS FOR RESOLUTION.
J. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
4, CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY
DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK
INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE
START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610.
5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND
PROCEDURES DESCRIBED IN STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -
METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER.
6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS
OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES.
7. THE CONTRACTORS SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR
TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL
SAFETY.
8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE
GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE
REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES
LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND
MOVEMENT,
9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING
A SEPARATE PERMIT FOR THAT PURPOSE.
10. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION,
HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD,
THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER
PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND
SERVICE ALERT AT 1-800-277-2600 TWO WORKING DAYS BEFORE EXCAVATION.
11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING,
BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE
IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND
CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK
AROUND THEIR FACILITIES.
CITY OF FONTANA
STREETIM OVEMENT PLAN
TRACT MAP 18061
LAUREL AVENUE AND ARROW BOULEVARD
N
W
TC
= TOP OF CURB ELEVATION
INDEX MAP
= EXISTING ELEVATION
Wz
I p
W =
WATER LINE
NOT TO SCALE
SEWER LINE
U
j NORTH
32'
= FINISHED SURFACE
I
= NATURAL GROUND
12'
Q
20'Lo
CURB FACE
12'
EDGE OF PAVING
W
5.5'
15.5'
3.5'
5'
0.5'
M
29
2%' v 290
VICINITY MAP
INSTALL STREET LIGHT (PER STREET LIGHT PLAN)
5 EACH
c
J
1 EACH
2
SEE SHEET 3
1y -9-I-
`
W
(EXISTING IMPROVEMENT)
PROPOSED
IMPROVEMENT
15,400 S. F/605 TONS
1�5
STREET CROSS-SECTION
3,660 S.F.
1
CONSTRUCT DISCHARGE STRUCTURE PER CITY STD. NO. 3000, W=4'
2 EACH
LAUREL AVENUE
CONSTRUCT CURB OPENING CATCH BASIN PER CITY STANDARD NO. 3004
1 EACH
18
GRIND 0. 15' (MIN.) AND A. C. 0VERL Y 0. 15' (MIN.)
9,890 S. F.
�I
Q
ADJUST TO GRADE EXISTING SEWER MANHOLE
2 EACH
CONSTRUCT LOCAL DEPRESSION PER CITY STANDARD NO. 3003, CASE C.
1 EACH
(T. 1. = 5.5)
FLOW
FLOW
ARROW BOULEVARD
78'
12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT
APPROPRIATE .AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE
WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS.
13. CURVE DATA REFERS TO THE FACE OF CURB.
14. STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED,
15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE
CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADE(S). THE CONTRACTOR SHALL BE
RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING
DURING CONSTRUCTION.
16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH
MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER.
17. REMOVAL AND REPLACEMENT OR EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS,
MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR
LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS
CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK
PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER
REPLACEMENT OF THE MONUMENT
18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESS AT ALL TIMES. A
MINIMUM 12 FOOT LAND SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR
RESIDENTS AND EMERGENCY VEHICLES.
19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL,
INCLUDING ADEQUATE WATERING, AT ALL TIMES.
20. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES
PER HOUR.
21. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT, OR DEBRIS TO BE
DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING
CONSTRUCTION WITHOUT PRIOR. WRITTEN APPROVAL.
22. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR.
23. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION, FAILURE TO OBTAIN THE
REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE
SPECIFIED DENSITY IS OBTAINED.
24, CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET
IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY
NON-EROOEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS.
25. THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE
TIME OF CONSTRUCTION AND SHALL CONFORM TO THE CITY OF FONTANA STANDARD DETAILS.
26. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH
EXISTING CONCRETE.
27. THE SEWER CONTRACTOR SHALL STAMP AN 'S" IN THE FACE OF THE CURB AT THE LOCATION OF THE
SEWER LATERAL.
28. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED,
INSPECTED AND APPROVED.
29. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF
STREETS.
30. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO
PLACEMENT
31. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND
APPROVAL OF THE CITY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN AFTER COMPLETION OF
ROUGH GRADING,
32. ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET
SECTIONS SHALL BE RECOMMENDED BY A GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF
FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH GRADING.
33. ALL MANHOLES, CLEAN OUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED
GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING.
34. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING,
BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC
ENGINEER.
35. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND
SIDEWALKS AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE CITY
ENGINEER.
36. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF
RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER.
PROPOSED IMPROVEMENT
• A* = GRIND AND OVERLAY
F
(EXISTING IMPROVEMENT)
STREET CROSS-SECTION
ARROW BOULEVARD
NOT TO SCALE
UTILITY CONTACTS (T I. = 10.5)
ELECTRICITY
SOUTHERN CALIFORNIA EIDSON COMPANY
300 N. PEPPER AVE.
RIAL TO CA. 92375
UNDERGROUND: (909) 357-6233
TRANSMISSION; (909) 875-5100
PIPELINES: (909) 657-12,33
DISTRIBUTION. (909) 357-6233
GAS
SOUTHERN CALIFORNIA GAS CO.
1981 L UGONIA AVENUE
REDLANDS, CA. 92374
ATTV JOHN OATES
EMERGENCIES; (800) 427-2200
ENGINEER'S NOTE:
WA TER
FONTANA WATER COMPANY
8440 NUEVO AVENUE
FONTANA, CA. 92335
ATTN: MICHAEL McGRAW
(909) 822-2201
FAX (909) 283-5046
GENERAL TELEPHONE COMPANY
1400 E. PHILLIPS RANCH BLVD
ONTARIO, CA. 91766
ATTN: STEVE HOCK
(800) 422-4 1JJ
SEWER
CITY OF FONTANA
8353 SIERRA AVENUE
FONTANA, CA. 92,335
(909) 350-6632
COMCAST CABLEVISION
1205 DUPONT AVENUE
ONTARIO, CA. 91761
ATTN: JACK HAYES
(909) 390-4738
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES, CONDUITS OR ANY
OTHER STRUCTURES SHOWN ON THESE DRAWINGS WERE OBTAINED BY A SEARCH OF THE
AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO OTHER UTILITIES
OR STRUCTURES EXCEPT AS SHOWN ON THESE DRAWINGS. THE CONTRACTOR IS REQUIRED
TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN ON THE
DRAWINGS. THE CONTRACTOR FURTHER ASSUMES ALL LIABILITY AND RESPONSIBILITY FOR
UTILITY PIPES, CONDUITS OR STRUCTURES SHOWN OR NOT SHOWN ON THESE DRAWINGS.
CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR
JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT,
INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, AND THAT THIS REQUIREMENT SHALL
APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND THAT THE
CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE CITY, THE OWNER AND THE
ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION
WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING
FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER.
Qr _
Oa oof
O w
d v+ Q ~ B
d N N N0
i 0
AL T 4A
RCP OR I RCB OR I
RC ARCH* RC ARCH'"
I
-f-J ° I
X 71_
O
is O Nw
d N � � 0
PLAN Fcv ARCH MAY HAVE A HORSESHOE -
SHAPED, CIRCULAR, ELLIPTICAL
0 uw n OR SIMILAR CROSS SECTION.
w
w¢ 0
a" v a �
02
H t-
P, SEE NOTE 5
ELEVATION
STATION ELEVATION
STATION
0 (T -
(y O w' 1 lti
na_ 0 vwi w
a ,o
+ SECTION A -A
a'n � �O
HM
STEEL PATTERN SHOWN IS
PICTORIAL ONLY, SEE NOTES
2 AND 7
RCP OR
ARCH
OPTIONAL CONSTRUCTION
JOINT:
RCB OR ARCH TO RCP USE
CONST JOINT OF RCB OR ARCH.
RCB TO ARCH, USE CONST
JOINT OF RCB
SECTION B -B
STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION
TRANSITION STRUCTURE STANDARD PLAN
RCB TO PIPE 342-2
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION SHEET 1 OF 2
5'
7' SAWCUT & MIN.
REMOVE
L � EX. PAVEMENT
NEW PAVEMENT
SECTION
lq:*f-QIol
FL =
64'
TC
= TOP OF CURB ELEVATION
(X)
= EXISTING ELEVATION
TP
= TOP OF PAVEMENT
W =
WATER LINE
S =
SEWER LINE
G =
32'
32'
= FINISHED SURFACE
I
= NATURAL GROUND
12'
20'
20'Lo
CURB FACE
12'
EDGE OF PAVING
0.5'
5.5'
15.5'
3.5'
5'
0.5'
M
29
2%' v 290
VICINITY MAP
INSTALL STREET LIGHT (PER STREET LIGHT PLAN)
5 EACH
1
CONSTRUCT 5' LONG TRANSITION STRUCTURE PER APWA STD. NO. 342-2
1 EACH
2
RELOCATE EXISTING ELECTRICAL PULLBOX
1y -9-I-
`
REMOVE AND DISPOSE EXISTING A.C. BERM
(EXISTING IMPROVEMENT)
PROPOSED
IMPROVEMENT
15,400 S. F/605 TONS
1�5
STREET CROSS-SECTION
3,660 S.F.
1
CONSTRUCT DISCHARGE STRUCTURE PER CITY STD. NO. 3000, W=4'
2 EACH
LAUREL AVENUE
CONSTRUCT CURB OPENING CATCH BASIN PER CITY STANDARD NO. 3004
1 EACH
18
GRIND 0. 15' (MIN.) AND A. C. 0VERL Y 0. 15' (MIN.)
9,890 S. F.
NOT TO SCALE
ADJUST TO GRADE EXISTING SEWER MANHOLE
2 EACH
CONSTRUCT LOCAL DEPRESSION PER CITY STANDARD NO. 3003, CASE C.
1 EACH
(T. 1. = 5.5)
78'
I
=
0
52'
50'
O
Z
12
40'
36'
14'
�.� 0.5'
X9-1'"27.
6°
26' 14'
[ 5.5
0.5' M
1
A #290
27,'-
29 '
I
9
2
PROPOSED IMPROVEMENT
• A* = GRIND AND OVERLAY
F
(EXISTING IMPROVEMENT)
STREET CROSS-SECTION
ARROW BOULEVARD
NOT TO SCALE
UTILITY CONTACTS (T I. = 10.5)
ELECTRICITY
SOUTHERN CALIFORNIA EIDSON COMPANY
300 N. PEPPER AVE.
RIAL TO CA. 92375
UNDERGROUND: (909) 357-6233
TRANSMISSION; (909) 875-5100
PIPELINES: (909) 657-12,33
DISTRIBUTION. (909) 357-6233
GAS
SOUTHERN CALIFORNIA GAS CO.
1981 L UGONIA AVENUE
REDLANDS, CA. 92374
ATTV JOHN OATES
EMERGENCIES; (800) 427-2200
ENGINEER'S NOTE:
WA TER
FONTANA WATER COMPANY
8440 NUEVO AVENUE
FONTANA, CA. 92335
ATTN: MICHAEL McGRAW
(909) 822-2201
FAX (909) 283-5046
GENERAL TELEPHONE COMPANY
1400 E. PHILLIPS RANCH BLVD
ONTARIO, CA. 91766
ATTN: STEVE HOCK
(800) 422-4 1JJ
SEWER
CITY OF FONTANA
8353 SIERRA AVENUE
FONTANA, CA. 92,335
(909) 350-6632
COMCAST CABLEVISION
1205 DUPONT AVENUE
ONTARIO, CA. 91761
ATTN: JACK HAYES
(909) 390-4738
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES, CONDUITS OR ANY
OTHER STRUCTURES SHOWN ON THESE DRAWINGS WERE OBTAINED BY A SEARCH OF THE
AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO OTHER UTILITIES
OR STRUCTURES EXCEPT AS SHOWN ON THESE DRAWINGS. THE CONTRACTOR IS REQUIRED
TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN ON THE
DRAWINGS. THE CONTRACTOR FURTHER ASSUMES ALL LIABILITY AND RESPONSIBILITY FOR
UTILITY PIPES, CONDUITS OR STRUCTURES SHOWN OR NOT SHOWN ON THESE DRAWINGS.
CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR
JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT,
INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, AND THAT THIS REQUIREMENT SHALL
APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND THAT THE
CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE CITY, THE OWNER AND THE
ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION
WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING
FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER.
Qr _
Oa oof
O w
d v+ Q ~ B
d N N N0
i 0
AL T 4A
RCP OR I RCB OR I
RC ARCH* RC ARCH'"
I
-f-J ° I
X 71_
O
is O Nw
d N � � 0
PLAN Fcv ARCH MAY HAVE A HORSESHOE -
SHAPED, CIRCULAR, ELLIPTICAL
0 uw n OR SIMILAR CROSS SECTION.
w
w¢ 0
a" v a �
02
H t-
P, SEE NOTE 5
ELEVATION
STATION ELEVATION
STATION
0 (T -
(y O w' 1 lti
na_ 0 vwi w
a ,o
+ SECTION A -A
a'n � �O
HM
STEEL PATTERN SHOWN IS
PICTORIAL ONLY, SEE NOTES
2 AND 7
RCP OR
ARCH
OPTIONAL CONSTRUCTION
JOINT:
RCB OR ARCH TO RCP USE
CONST JOINT OF RCB OR ARCH.
RCB TO ARCH, USE CONST
JOINT OF RCB
SECTION B -B
STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION
TRANSITION STRUCTURE STANDARD PLAN
RCB TO PIPE 342-2
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION SHEET 1 OF 2
5'
7' SAWCUT & MIN.
REMOVE
L � EX. PAVEMENT
NEW PAVEMENT
SECTION
lq:*f-QIol
FL =
FLOWLINE ELEVATION
TC
= TOP OF CURB ELEVATION
(X)
= EXISTING ELEVATION
TP
= TOP OF PAVEMENT
W =
WATER LINE
S =
SEWER LINE
G =
GAS LINE
FS
= FINISHED SURFACE
NG
= NATURAL GROUND
EP
= EDGE OF PAVING
CF =
CURB FACE
EP =
EDGE OF PAVING
J
= PCC PAVING
1 EACH
= PCG SURFACE
GRIND 0. 15' MIN,
AND OVERLAY 0. 15' MIN,
LAP JOIN DETAIL
NOT TO SCALE
NOTES
1, THE HORIZONTAL ANGLE OF DIVERGENCE OR CONVERGENCE, 6, SHALL
NOT EXCEED 5' 45'.
2. REINFORCING STEEL BAR SIZES, SPACING, PATTERN AND COVER OVER
THE STEEL SHALL BE AS FOLLOWS:
RCB TO RCP AND RCB TO ARCH - THAT OF RCB SECTION.
ARCH TO RCP - THAT OF ARCH SECTION.
ARCH TO ARCH - THAT OF ARCH SECTION HAVING THE THICKER
WALLS. THE BAR LENGTHS SHALL VARY UNIFORMLY THROUGHOUT
THE TRANSITION.
3. THE CONCRETE THICKNESS SHALL BE AS FOLLOWS:
RCB TO RCP AND ARCH TO RCP - THAT OF ARCH OR RCB
SECTION UNLESS THE WALL THICKNESS OF THE RCP PLUS 100 mm
(4") GREATER, IN WHICH CASE THE CONCRETE THICKNESS SHALL
VARY UNIFORMLY FROM THAT OF THE ARCH OR RCB SECTION
TO THAT OF THE RCP WALL PLUS 100 mm (4").
RCB TO ARCH AND ARCH TO ARCH - THAT OF THE ADJOINING RCB
OR ARCH SECTION AT EACH END OF THE TRANSITION AND SHALL
VARY UNIFORMLY BETWEEN THE TWO ENDS.
4. THE INTERIOR SURFACE SHALL BE SMOOTH AND VARY UNIFORMLY
BETWEEN THE TWO ADJOINING SECTIONS.
5, AT RCP JUNCTURE, EMBEDMENT P SHALL BE 130 mm (5") FOR PIPE
SIZE OF 2400 mm (96") OR LESS, AND 200 mm (8") 7 --OR PIPE SIZES
OVER 2400 mm (96"),
6. f'c = 28 MPa (4000 PSI) AT 28 DAYS AND THE CONCRETE SHALL BE THE
SAME MIX AS THE ADJACENT RCB.
7. ALL STEEL, EXCEPT LONGITUDINAL STEEL SHALL BE GRADE 400 (60)
BILLET STEEL CONFORMING TO ASTM A 615 M (A 615) AND SHALL
TERMINATE 40 mm (1 112") CLEAR OF CONCRETE SURFACE UNLESS
OTHERWISE SHOWN,
8. KEYED CONSTRUCTION JOINTS OF THE SAME DIMENSIONS AS THOSE
OF THE RCB OR ARCH SECTION MAY BE CARRIED THROUGH THE
TRANSITION STRUCTURE AT THE CONTRACTOR'S OPTION. SEE
SECTION B -B,
9. THE TRANSITION STRUCTURE SHALL BE CONSTRUCTED IN ACCORDANCE
THE STRUCTURAL NOTES APPLYING TO RCB OR ARCH
STRUCTURES SHOWN ON THE PLANS.
STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION
FOOTHILL
BLVD.
342-2
RCB TO PIPE
SHEET 2OF2
SITE j
CONSTRUCT DRIVEWAY PER CITY STD. N0, 1002, W=AS SHOWN ON PLAN
Q
Q
0 Q
824 L. F.
ARROW
BL VD.
845 S.F.
J
LijC)
j
660 S.F.118 TONS
O
SAW -CUT, REMOVE AND DISPOSE EXISTING A.C. PAVING PER LAP JOIN DETAIL
850 L. F.
5
EXTEND EXISTING DRAIN PER DETAIL ON SHEET 2
45 L. F.
J
J
1 EACH
0
RELOCATE EXISTING STREET SIGN
1 EACH
M.ERRILL
AVE.
6 EACH
VICINITY MAP
INSTALL STREET LIGHT (PER STREET LIGHT PLAN)
5 EACH
N. T. S.
CONSTRUCT 5' LONG TRANSITION STRUCTURE PER APWA STD. NO. 342-2
1 EACH
NOTES
1, THE HORIZONTAL ANGLE OF DIVERGENCE OR CONVERGENCE, 6, SHALL
NOT EXCEED 5' 45'.
2. REINFORCING STEEL BAR SIZES, SPACING, PATTERN AND COVER OVER
THE STEEL SHALL BE AS FOLLOWS:
RCB TO RCP AND RCB TO ARCH - THAT OF RCB SECTION.
ARCH TO RCP - THAT OF ARCH SECTION.
ARCH TO ARCH - THAT OF ARCH SECTION HAVING THE THICKER
WALLS. THE BAR LENGTHS SHALL VARY UNIFORMLY THROUGHOUT
THE TRANSITION.
3. THE CONCRETE THICKNESS SHALL BE AS FOLLOWS:
RCB TO RCP AND ARCH TO RCP - THAT OF ARCH OR RCB
SECTION UNLESS THE WALL THICKNESS OF THE RCP PLUS 100 mm
(4") GREATER, IN WHICH CASE THE CONCRETE THICKNESS SHALL
VARY UNIFORMLY FROM THAT OF THE ARCH OR RCB SECTION
TO THAT OF THE RCP WALL PLUS 100 mm (4").
RCB TO ARCH AND ARCH TO ARCH - THAT OF THE ADJOINING RCB
OR ARCH SECTION AT EACH END OF THE TRANSITION AND SHALL
VARY UNIFORMLY BETWEEN THE TWO ENDS.
4. THE INTERIOR SURFACE SHALL BE SMOOTH AND VARY UNIFORMLY
BETWEEN THE TWO ADJOINING SECTIONS.
5, AT RCP JUNCTURE, EMBEDMENT P SHALL BE 130 mm (5") FOR PIPE
SIZE OF 2400 mm (96") OR LESS, AND 200 mm (8") 7 --OR PIPE SIZES
OVER 2400 mm (96"),
6. f'c = 28 MPa (4000 PSI) AT 28 DAYS AND THE CONCRETE SHALL BE THE
SAME MIX AS THE ADJACENT RCB.
7. ALL STEEL, EXCEPT LONGITUDINAL STEEL SHALL BE GRADE 400 (60)
BILLET STEEL CONFORMING TO ASTM A 615 M (A 615) AND SHALL
TERMINATE 40 mm (1 112") CLEAR OF CONCRETE SURFACE UNLESS
OTHERWISE SHOWN,
8. KEYED CONSTRUCTION JOINTS OF THE SAME DIMENSIONS AS THOSE
OF THE RCB OR ARCH SECTION MAY BE CARRIED THROUGH THE
TRANSITION STRUCTURE AT THE CONTRACTOR'S OPTION. SEE
SECTION B -B,
9. THE TRANSITION STRUCTURE SHALL BE CONSTRUCTED IN ACCORDANCE
THE STRUCTURAL NOTES APPLYING TO RCB OR ARCH
STRUCTURES SHOWN ON THE PLANS.
STANDARD PLANS FOR PUBLIC WORKS CONSTRUCTION
STANDARD PLAN
TRANSITION STRUCTURE
342-2
RCB TO PIPE
SHEET 2OF2
BASIS OF BEARINGS IS THE CENTERLINE OF ARROW ROUTE
BEING N89'5931 'E PER RECORD OF SURVEY 77, PAGE 16
CUP 07-014, TTM 06-009
ESTIMATED
CONSTRUCTION NOTES:
QUANTITIES
Ol
CONSTRUCT DRIVEWAY PER CITY STD. N0, 1002, W=AS SHOWN ON PLAN
940 S.F.
20
CONSTRUCT 8" P.C.C. CURB AND GUTTER PER CITY STD. NO. 1000
824 L. F.
O3
CONSTRUCT 5' WIDE P.C.C. SIDEWALK PER CITY STD. NO. 1006
845 S.F.
Q
CONSTRUCT 4.5" A.C. MIN. OVER 12" MIN. OF 95% COMPACTED NATIVE SUBGRADE.
660 S.F.118 TONS
O
SAW -CUT, REMOVE AND DISPOSE EXISTING A.C. PAVING PER LAP JOIN DETAIL
850 L. F.
5
EXTEND EXISTING DRAIN PER DETAIL ON SHEET 2
45 L. F.
7
CONSTRUCT CURB RETURN ACCESS RAMP PER CITY STD. NO. 1003
1 EACH
®
RELOCATE EXISTING STREET SIGN
1 EACH
90
REMOVE EXISTING POWER POLE AND UNDERGROUND FACILITIES PER SCE STANDARDS
6 EACH
0
INSTALL STREET LIGHT (PER STREET LIGHT PLAN)
5 EACH
11
CONSTRUCT 5' LONG TRANSITION STRUCTURE PER APWA STD. NO. 342-2
1 EACH
2
RELOCATE EXISTING ELECTRICAL PULLBOX
I EACH
1g
REMOVE AND DISPOSE EXISTING A.C. BERM
59 L.F.
®
CONSTRUCT 6.5" A.C. MIN. OVER 12" MIN. OF 95% COMPACTED NATIVE SUBGRADE.
15,400 S. F/605 TONS
1�5
CONSTRUCT 6' WIDE P.C.C. SIDEWALK PER CITY STD. NO. 1006
3,660 S.F.
1
CONSTRUCT DISCHARGE STRUCTURE PER CITY STD. NO. 3000, W=4'
2 EACH
1
CONSTRUCT CURB OPENING CATCH BASIN PER CITY STANDARD NO. 3004
1 EACH
18
GRIND 0. 15' (MIN.) AND A. C. 0VERL Y 0. 15' (MIN.)
9,890 S. F.
19
ADJUST TO GRADE EXISTING SEWER MANHOLE
2 EACH
CONSTRUCT LOCAL DEPRESSION PER CITY STANDARD NO. 3003, CASE C.
1 EACH
BASIS OF BEARINGS IS THE CENTERLINE OF ARROW ROUTE
BEING N89'5931 'E PER RECORD OF SURVEY 77, PAGE 16
CUP 07-014, TTM 06-009