Loading...
HomeMy WebLinkAbout5385-1GENERAL NOTES 1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED. 2. WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK", THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION. 3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 4, CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610. 5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 6. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. 8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE OTENTIAL EXISTS FOR GROUND MOVEMENT. 9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE. 10. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION. 11. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS. ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES. 12, THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS. 13. CURVE DATA REFERS TO THE FACE OF CURB. 14. STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED. 15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION. 16. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER. 17. REMOVAL AND REPLACEMENT OF EXISTING SURVEYCONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT. 18, THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES. 20. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES PER HOUR. 21. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL. 22. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR. 23. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED. 24. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON-ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS. 25. THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE TIME OF CONSTRUCTION AND SHALL CONFORM TO THE CITY OF FONTANA STANDARD DETAILS. 26. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE. 27. THE SEWER CONTRACTOR SHALL STAMP AN "S" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER LATERAL. 28. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED. 29. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS. 30. APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT. 31. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF THE CITY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING. 32. ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET SECTIONS SHALL BE RECOMMENDED BY A GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH GRADING. 33. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING. 34. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER. 35. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER. 36. AS -BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER. ** BASIS OF BEARINGS BEARINGS SHOWN HEREON ARE BASED ON THE CENTERLINE OF CYPRESS AVENUE BEING NORTH. ** TOPOGRAPHIC AND BOUNDARY INFORMATION SHOWN HEREON WAS OBTAINED FROM AN ALTA SURVEY PREPARED BY: TRUXAW & ASSOCIATES DATED 6-20-14 STREET IMPROVEMENT PLANS PARCEL MAP 19588 16477 SLOVER AVENUE CITY OF FONTANA UNAUTHORIZED CHANGES AND USES CAUTION: THE ENGINEER PREPARING THESE PLANS WILL NOT BE RESPONSIBLE FOR, OR LIABLE FOR, UNAUTHORIZED CHANGES TO OR USES OF THESE PLANS. At" TFQ- CITY ACCEPTANCE OF PLANS DOES NOT RELIEVE THE DEVELOPER FROM RESPONSIBILITY FOR THE CORRECTION OF ERRORS AND OMISSIONS DISCOVERED DURING CONSTRUCTION. UPON REQUEST OF THE CITY INSPECTOR, THE REQUIRED PLAN REVISIONS SHALL BE PROMPTLY SUBMITTED TO THE CITY ENGINEER FOR REVIEW. CONSTRUCTION CONTRACTOR AGREES THAT IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES CONSTRUCTION CONTRACTOR WILL BE REQUIRED TO ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SIT CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THE PROJECT, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS REQUIREMENT SHALL BE MADE TO APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND CONSTRUCTION CONTRACTOR FURTHER AGREES TO DEFEND, INDEMNIFY AND HOLD DESIGN PROFESSIONAL HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF DESIGN PROFESSIONAL. PRIVATE ENGINEER'S NOT/CE TO CONTRACTORS THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES OR STRUCTURES SHOWS ON THESE PLANS ARE OBTAINED BY A SEARCH OF AVAILABLE RECORDS. TO THE BEST OF OUR KNOWLEDGE THERE ARE NO EXISTING UTILITIES EXCEPT AS SHOWN ON THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITIES SHOWN AND ANY OTHER LINES OR STRUCTURES NOT SHOWN ON THESE PLANS. ALL CONTRACTORS AND SUBCONTRACTORS PERFORMING WORK SHOWN ON OR RELATED TO THESE PLANS SHALL CONDUCT THEIR OPERATIONS SO THAT ALL EMPLOYEES ARE PROVIDED A SAFE PLACE TO WORK AND THE PUBLIC IS PROTECTED. ALL CONTRACTORS AND SUBCONTRACTORS SHALL COMPLY WITH THE 'OCCUPATIONAL SAFETY AND HEALTH REGULATIONS' OF THE U.S. DEPARTMENT OF LABOR, AND WITH THE STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS 'CONSTRUCTION SAFETY ORDERS'. THE CIVIL ENGINEER SHALL NOT BE RESPONSIBLE IN ANY WAY FOR THE CONTRACTORS AND SUBCONTRACTORS COMPLIANCE WITH THE "OCCUPATIONAL SAFETY AND HEALTH REGULATIONS' OF THE U.S. DEPARTMENT OF LABOR OR WITH THE STATE OF CALIFORNIA DEPARTMENT OF INDUSTRIAL RELATIONS "CONSTRUCTION SAFETY ORDERS". CONTRACTOR FURTHER AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSON AND PROPERTY; THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS' AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY KIND OF LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXPECTING FOR ANY LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR ENGINEER. UTILITY PROVIDERS SEWER WATER ELECTRIC CITY OF FONTANA FONTANA WATER COMPANY SOUTHERN CALIFORNIA EDISON 8353 SIERRA AVENUE 15966 ARROW ROUTE 7951 REDWOOD AVENUE FONTANA, CA 92335 FONTANA, CA 92335 FONTANA, CA 92336 (909) 350-7629 (909) 822-2201 (714) 796-9932 GAS TELEPHONE CABLE -TV SOUTHERN CALIFORNIA GAS CO. AT&T TIME WARNER CABLE SAN DIMAS, CA 91773 3939 E. CORONADO STREET 909 975-9493 (909) 335-7507 ANAHEIM, CA 92807 ( ) (714) 666-5503 - __--- TITLE SHEET w ------------------- w z w =D z > CYPRESS AVENUE SHEET 2 SHEET INDEX SCALE: 1"=60' I ID II I II II II I DRAWING INDEX SAN BERNARD NO FREEWAY �o SLOVER AVENUE TITLE SHEET w CYPRESS AVENUE PLAN & PROFILE w z w =D z > TYPICAL SECTIONS & DETAILS w Q Z w > Q cn SITE c Q Of CONSTRUCT 24" RCP STORM DRAIN LATERAL; D-1750; PIPE TRENCHING, BEDDING AND Of w c5 Q v �n CONSTRUCT LOCAL DEPRESSION PER CITY OF FONTANA STD. PLAN NO. 3003, CASE A; H=4", SANTA ANA AVENUE N VICINITY MAP NOT TO SCALE DRAWING INDEX 1 TITLE SHEET 2 CYPRESS AVENUE PLAN & PROFILE 3 SLOVER AVENUE PARKWAY IMPROVEMENTS 4 TYPICAL SECTIONS & DETAILS 5I CYPRESS AVENUE CROSS SECTIONS CONSTRUCTION NOTES O SAWCUT AND REMOVE EXIST. AC CURB AND PAVEMENT. O2 CONSTRUCT COMMERCIAL DRIVEWAY APPROACH PER CITY OF FONTANA STD. PLAN NO. 1002 (MODIFIED); WIDTH PER PLAN. O3 CONSTRUCT MODIFIED 8" CONCRETE CURB WITH PERVIOUS CONCRETE GUTTER PER CITY OF FONTANA STD. PLAN NO. 1000 AND DETAILS ON SHEET 4. O4 CONSTRUCT 4" THICK CONCRETE SIDEWALK PER CITY OF FONTANA STD. PLAN NO. 1006; W=6', 11 CONSTRUCT CURB DRAIN PER SPPWC STD. PLAN 150-3; INLET CASE PER PLAN, A=60% N=1 (SEE DETAIL ON SHEET 4). 12 STREET LIGHT PER CITY OF FONTANA STREET LIGHT PLAN (STD. 404). 13 SAWCUT AND REMOVE EXIST. DRIVEWAY APPROACH AND/OR SIDEWALK. 14 SAWCUT AND REMOVE, 2' MIN. EXIST. AC PAVEMENT TO PROVIDE A CLEAN JOIN LINE; PATCH BACK WITH FULL -DEPTH AC (8 -INCH MINIMUM THICKNESS). 15 CONSTRUCT 8" CONCRETE CURB AND GUTTER PER CITY OF FONTANA STD. PLAN NO. 1000. 16 PROTECT IN PLACE EXISTING UTILITY POLE. 17 CONSTRUCT CONCRETE BLANKET PROTECTION PER SPPWC STD. PLAN 225-2 (SEE DETAIL ON SHEET 4). 18 FIRE HYDRANT (PER SEPARATE PLANS; BY OTHERS). * ACTUAL THICKNESS OF AC PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET SECTION SHALL BE RECOMMENDED BY A GEOTECHNICAL ENGINEERING REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH GRADING UNLESS OTHERWISE DIRECTED BY THE CITY ENGINEER. QTY S 5,975 SF 1,370 SF 400 LF 4,585 SF 1 EA 1 EA. 28 LF 1 EA 8,860 SF/354 TONS 2,975 SF 2 EA 3 EA 1,400 SF 64 LF 64 LF N/A 1 EA 3 EA O5 CONSTRUCT CURB OPENING CATCH BASIN PER CITY OF FONTANA STD. PLAN NO, 3004; W=14', V=4.71', A=70', H=4". O6 CONSTRUCT JUNCTION STRUCTURE PER CITY OF FONTANA STD. PLAN NO. 3010; 3=24", C=4.50', D=42", A=75'31'52". W 07 CONSTRUCT 24" RCP STORM DRAIN LATERAL; D-1750; PIPE TRENCHING, BEDDING AND BACKFILLING SHALL BE PER CITY OF FONTANA STD. PLAN NO. 1008. Q O8 CONSTRUCT LOCAL DEPRESSION PER CITY OF FONTANA STD. PLAN NO. 3003, CASE A; H=4", w UQ M H1=3"; SEE DETAIL "B" ON SHEET 4. * O9 CONSTRUCT 6.5" MIN. AC PAVEMENT OVER 12" MIN. OF 95% COMPACTED NATIVE SUBGRADE y W (SEE NOTE BELOW). V� 10 GRIND EXIST. AC PAVEMENT 0.10 MIN. DEEP AND REPLACE WITH 0.10 MIN. THICKNESS AC OVERLAY; SEE DETAIL "A" ON SHEET 4. 11 CONSTRUCT CURB DRAIN PER SPPWC STD. PLAN 150-3; INLET CASE PER PLAN, A=60% N=1 (SEE DETAIL ON SHEET 4). 12 STREET LIGHT PER CITY OF FONTANA STREET LIGHT PLAN (STD. 404). 13 SAWCUT AND REMOVE EXIST. DRIVEWAY APPROACH AND/OR SIDEWALK. 14 SAWCUT AND REMOVE, 2' MIN. EXIST. AC PAVEMENT TO PROVIDE A CLEAN JOIN LINE; PATCH BACK WITH FULL -DEPTH AC (8 -INCH MINIMUM THICKNESS). 15 CONSTRUCT 8" CONCRETE CURB AND GUTTER PER CITY OF FONTANA STD. PLAN NO. 1000. 16 PROTECT IN PLACE EXISTING UTILITY POLE. 17 CONSTRUCT CONCRETE BLANKET PROTECTION PER SPPWC STD. PLAN 225-2 (SEE DETAIL ON SHEET 4). 18 FIRE HYDRANT (PER SEPARATE PLANS; BY OTHERS). * ACTUAL THICKNESS OF AC PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET SECTION SHALL BE RECOMMENDED BY A GEOTECHNICAL ENGINEERING REPORT AND SUBMITTED TO THE CITY OF FONTANA FOR APPROVAL UPON COMPLETION OF ROUGH GRADING UNLESS OTHERWISE DIRECTED BY THE CITY ENGINEER. QTY S 5,975 SF 1,370 SF 400 LF 4,585 SF 1 EA 1 EA. 28 LF 1 EA 8,860 SF/354 TONS 2,975 SF 2 EA 3 EA 1,400 SF 64 LF 64 LF N/A 1 EA 3 EA