Loading...
HomeMy WebLinkAbout5290-5T DATE SUBMITTAL TRACKER 05/31/2013 FIRST SUBMITTAL 04/13/2015 SECOND SUBMITTAL 07/10/2015 MYLAR SUBMITTAL TOLL FREE _qq11E1MFF_ 811 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT REVIREVISION DESCRIPTION DESCRIPTION MATCHLINE: SEE ABOVE RIGHT I I I I I I I J LEGENDS AND NOTES: O 6" CONCRETE MOWCURB — REFER TO CONCRETE MOWCURB DETAIL ON SHEET 38. OALIGN 90 DEGREES WITH STREET CENTER LINE O WALL PER WALL AND FENCE PLANS UNDER SEPARATE COVER. ALL PUBLIC FACING MASONRY WALLS AND PILASTERS TO BE TREATED WITH VITROCEM ANIT—GRAFFITI COATING ® 5' SIDEWALK PER CIVIL ENGINEER'S PLANS O ENTRY MONUMENT PER DETAIL 1, SHEET 34 © ENTRY MONUMENT PER DETAIL 4, SHEET 34 O CONCRETE MAINTENANCE CURB PER DETAIL B, SHEET 38 NOTES: 1. QUANTITIES PROVIDED FOR THE CONVENIENCE OF THE CONTRACTOR. ACTUAL SQUARE FOOTAGES SHOWN ON THE PLANS TAKE PRECEDENT OVER LISTED QUANTITIES. 2. ALL DIMENSIONS ARE TAKEN FROM CENTERLINE STATION POINTS 3. THE DESIGN INTENT FOR THE ROCK COBBLE PAVEMENT IS TO BE FLUID, CONTINUOUS AND NATURALISTIC; ABRUPT CHANGES OF DIRECTIONS OR ANGLE POINTS WILL BE UNACCEPTABLE AND MAY BE CAUSE FOR REMOVAL AND REPLACEMENT. i SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH STANDARDS IN EFFECT SITE MAP r -THIS SHEET D. R. HORTON TR 18859 - CFD LANDSCAPE PLANS SCALE: HARDSCAPE PLAN DATE: 1 "=20' - 11-07-14 APPROVoED BY:/ DRAWING NO.: 5 DAT€: 7 5290 4 R.C.E. 51152 0 HARDSCAPELEGEND SYMBOL ...................... MATERIAL TYPE SIZE QTY REMARKS Cobble Sierra Cobble to Typ. Rock grouted in Available from 4"-8" 45,351Refer Treatment Detail place Southwest SF on sheet 38 Boulder NOTES: 1. QUANTITIES PROVIDED FOR THE CONVENIENCE OF THE CONTRACTOR. ACTUAL SQUARE FOOTAGES SHOWN ON THE PLANS TAKE PRECEDENT OVER LISTED QUANTITIES. 2. ALL DIMENSIONS ARE TAKEN FROM CENTERLINE STATION POINTS 3. THE DESIGN INTENT FOR THE ROCK COBBLE PAVEMENT IS TO BE FLUID, CONTINUOUS AND NATURALISTIC; ABRUPT CHANGES OF DIRECTIONS OR ANGLE POINTS WILL BE UNACCEPTABLE AND MAY BE CAUSE FOR REMOVAL AND REPLACEMENT. i SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH STANDARDS IN EFFECT SITE MAP r -THIS SHEET D. R. HORTON TR 18859 - CFD LANDSCAPE PLANS SCALE: HARDSCAPE PLAN DATE: 1 "=20' - 11-07-14 APPROVoED BY:/ DRAWING NO.: 5 DAT€: 7 5290 4 R.C.E. 51152 0