HomeMy WebLinkAbout5290-2LT0 U-- L- I 1 14 L:� 11% V Lmi
.........
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
...... ...... . . . . . . . . . . . . . . M ....... ... - . . .. . .. ....... ..
. ....... ..... ...... ....... ....... ....... .. ..... . ......
..... ... .......
... ...... ...... ....... ....... .... ;...
N-1 ....... ....... ...... ...... 4;1 . .. ... . ....... ....... ......
...... ...... Q . ....... - ..... ....... ...... ...... .... .... .......
....... ...
. ....... ...
2284' 0
DATE
SUBMITTAL TRACKER
.NA,-
T
of of
20' 40' 6
D
Dc� r_ --i r,
vwwvwwvlm
TWO WORKING
RE kk%% DAYS BEFORE
YOU DIG YOU DIG
RETAINING WALLS FOR UTILITIES/ NEW
ARCHWAY AT ENTRY/ ENTRY ENHANCEMENTS/
NEW LIGTINGTR
9-21-15
.... ...... ....... ..... . ..... .. ....... .......
. ...... ...... ....... ...... ....... ....... . .....
- ----- ... ...... ------
SHOULD CONSTRUCTION OF THE REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS
OF THE DATE OF APPROVAL SHOWN HEREON AND
CARRIED FORTH IN A DILIGENT MANNER, THE CITY
ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO CONFORMANCE WITH STANDARDS IN
EFFECT
ODSC�
I M. 'C
A--, 4
In
lin
LU RE n
1
01/31116
EXP.DATE
10/2/15
DATE T -E,
\�'.j
bmt a
L A N D S C A P E
ARCH ITECTU RL
310 NORTH JOY STREET I CORONA, CA 92879
T: 951.737.1124 1 F: 951.737.6551
D. R. HORTON
05/31/2013
FIRST SUBMITTAL
18859 - CFD LANDSCAPE PLANS
u, 0'■
SECOND SUBMITTAL
2 3 2 0
W
DRAWN BY:
SK, SF, YM
HARDSCAPE PLAN
SCALE:
1 201
07/10/2015
MYLAR SUBMITTAL
0-2
DESr..NED BY:
SK
DATE:
11-07-14
CHECKED BY: APPROVED BY: DRAWING NO.: 2
SK DATE: 5290
BM CITY ENGINEER R.C.E. 51152 41
TE E
C
TOLL FREE 811
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
REV.
REVISION DESCRIPTION
DATE
ENGR.
CITY
DATE
EFE
CE
WALL & FEN
MATCHLINE:
SEE SHEET
6
PLANS:■
91
If
.......... .. -
.... ■M:
141-
.......
............... . . .
LT0 U-- L- I 1 14 L:� 11% V Lmi
.........
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
...... ...... . . . . . . . . . . . . . . M ....... ... - . . .. . .. ....... ..
. ....... ..... ...... ....... ....... ....... .. ..... . ......
..... ... .......
... ...... ...... ....... ....... .... ;...
N-1 ....... ....... ...... ...... 4;1 . .. ... . ....... ....... ......
...... ...... Q . ....... - ..... ....... ...... ...... .... .... .......
....... ...
. ....... ...
2284' 0
EXISTING
MATCHLINE: SEE SHEET 3
LEGENDS AND NOTES:
O 6" CONCRETE MOWCURB - REFER TO CONCRETE MOWCURB DETAIL ON SHEET 38.
OALIGN 90 DEGREES WITH STREET CENTER LINE
WALL PER WALL AND FENCE PLANS UNDER SEPARATE COVER, ALL PUBLIC FACING
MASONRY WALLS AND PILASTERS TO BE TREATED WITH VITROCEM ANIT-GRAFFITI COATING
O5' SIDEWALK PER CIVIL ENGINEER'S PLANS
O ENTRY MONUMENT PER DETAIL 1, SHEET 34
ENTRY MONUMENT PER DETAIL 4, SHEET 34
(2) CONCRETE MAINTENANCE CURB PER DETAIL B, SHEET 38
@) ARCHWAY ENTRY, REFER TO SHEET 41.
@ ENTRY ENHANCEMENT, REFER TO SHEET 41.
I HARDSCAPELEGEND
I SYMBOL I MATERIAL I TYPE I SIZE I QTY REMARKS
Cobble Sierra Cobble Refer to Typ. Rock
grouted in Available from 411-811 45,351 Treatment Detail
place Southwest SF on sheet 38
Boulder
NOTES:
1. QUANTITIES PROVIDED FOR THE CONVENIENCE OF THE CONTRACTOR. ACTUAL SQUARE
FOOTAGES SHOWN ON THE PLANS TAKE PRECEDENT OVER LISTED QUANTITIES.
2. ALL DIMENSIONS ARE TAKEN FROM CENTERLINE STATION POINTS
3. THE DESIGN INTENT FOR THE ROCK COBBLE PAVEMENT IS TO BE FLUID, CONTINUOUS AND
NATURALISTIC; ABRUPT CHANGES OF DIRECTIONS OR ANGLE POINTS WILL BE UNACCEPTABLE
AND MAY BE CAUSE FOR REMOVAL AND REPLACEMENT.
NOT A PART
SITE MAP
IMP AVP
. ....... ....... ...... ....... ... . ...... ..... ...... .... - ..... ...... .... THIS SHEETI
. ....... .......
--- z .. ....... . . ... .. -■
0 0 -------
227t,. NTS
DATE
SUBMITTAL TRACKER
.NA,-
T
of of
20' 40' 6
D
Dc� r_ --i r,
vwwvwwvlm
TWO WORKING
RE kk%% DAYS BEFORE
YOU DIG YOU DIG
RETAINING WALLS FOR UTILITIES/ NEW
ARCHWAY AT ENTRY/ ENTRY ENHANCEMENTS/
NEW LIGTINGTR
9-21-15
.... ...... ....... ..... . ..... .. ....... .......
. ...... ...... ....... ...... ....... ....... . .....
- ----- ... ...... ------
SHOULD CONSTRUCTION OF THE REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS
OF THE DATE OF APPROVAL SHOWN HEREON AND
CARRIED FORTH IN A DILIGENT MANNER, THE CITY
ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO CONFORMANCE WITH STANDARDS IN
EFFECT
ODSC�
I M. 'C
A--, 4
In
lin
LU RE n
1
01/31116
EXP.DATE
10/2/15
DATE T -E,
\�'.j
bmt a
L A N D S C A P E
ARCH ITECTU RL
310 NORTH JOY STREET I CORONA, CA 92879
T: 951.737.1124 1 F: 951.737.6551
D. R. HORTON
05/31/2013
FIRST SUBMITTAL
18859 - CFD LANDSCAPE PLANS
u, 0'■
SECOND SUBMITTAL
2 3 2 0
W
DRAWN BY:
SK, SF, YM
HARDSCAPE PLAN
SCALE:
1 201
07/10/2015
MYLAR SUBMITTAL
0-2
EXISTING
MATCHLINE: SEE SHEET 3
LEGENDS AND NOTES:
O 6" CONCRETE MOWCURB - REFER TO CONCRETE MOWCURB DETAIL ON SHEET 38.
OALIGN 90 DEGREES WITH STREET CENTER LINE
WALL PER WALL AND FENCE PLANS UNDER SEPARATE COVER, ALL PUBLIC FACING
MASONRY WALLS AND PILASTERS TO BE TREATED WITH VITROCEM ANIT-GRAFFITI COATING
O5' SIDEWALK PER CIVIL ENGINEER'S PLANS
O ENTRY MONUMENT PER DETAIL 1, SHEET 34
ENTRY MONUMENT PER DETAIL 4, SHEET 34
(2) CONCRETE MAINTENANCE CURB PER DETAIL B, SHEET 38
@) ARCHWAY ENTRY, REFER TO SHEET 41.
@ ENTRY ENHANCEMENT, REFER TO SHEET 41.
I HARDSCAPELEGEND
I SYMBOL I MATERIAL I TYPE I SIZE I QTY REMARKS
Cobble Sierra Cobble Refer to Typ. Rock
grouted in Available from 411-811 45,351 Treatment Detail
place Southwest SF on sheet 38
Boulder
NOTES:
1. QUANTITIES PROVIDED FOR THE CONVENIENCE OF THE CONTRACTOR. ACTUAL SQUARE
FOOTAGES SHOWN ON THE PLANS TAKE PRECEDENT OVER LISTED QUANTITIES.
2. ALL DIMENSIONS ARE TAKEN FROM CENTERLINE STATION POINTS
3. THE DESIGN INTENT FOR THE ROCK COBBLE PAVEMENT IS TO BE FLUID, CONTINUOUS AND
NATURALISTIC; ABRUPT CHANGES OF DIRECTIONS OR ANGLE POINTS WILL BE UNACCEPTABLE
AND MAY BE CAUSE FOR REMOVAL AND REPLACEMENT.
NOT A PART
SITE MAP
IMP AVP
. ....... ....... ...... ....... ... . ...... ..... ...... .... - ..... ...... .... THIS SHEETI
. ....... .......
--- z .. ....... . . ... .. -■
0 0 -------
227t,. NTS
DATE
SUBMITTAL TRACKER
.NA,-
T
of of
20' 40' 6
D
Dc� r_ --i r,
vwwvwwvlm
TWO WORKING
RE kk%% DAYS BEFORE
YOU DIG YOU DIG
RETAINING WALLS FOR UTILITIES/ NEW
ARCHWAY AT ENTRY/ ENTRY ENHANCEMENTS/
NEW LIGTINGTR
9-21-15
SHOULD CONSTRUCTION OF THE REQUIRED
IMPROVEMENTS NOT COMMENCE WITHIN TWO YEARS
OF THE DATE OF APPROVAL SHOWN HEREON AND
CARRIED FORTH IN A DILIGENT MANNER, THE CITY
ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO CONFORMANCE WITH STANDARDS IN
EFFECT
ODSC�
I M. 'C
A--, 4
In
lin
LU RE n
1
01/31116
EXP.DATE
10/2/15
DATE T -E,
\�'.j
bmt a
L A N D S C A P E
ARCH ITECTU RL
310 NORTH JOY STREET I CORONA, CA 92879
T: 951.737.1124 1 F: 951.737.6551
D. R. HORTON
05/31/2013
FIRST SUBMITTAL
18859 - CFD LANDSCAPE PLANS
04/13/2015
SECOND SUBMITTAL
DRAWN BY:
SK, SF, YM
HARDSCAPE PLAN
SCALE:
1 201
07/10/2015
MYLAR SUBMITTAL
DESr..NED BY:
SK
DATE:
11-07-14
CHECKED BY: APPROVED BY: DRAWING NO.: 2
SK DATE: 5290
BM CITY ENGINEER R.C.E. 51152 41
TOLL FREE 811
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
REV.
REVISION DESCRIPTION
DATE
ENGR.
CITY
DATE