Loading...
HomeMy WebLinkAbout2697-6Zt I-4` MAIN ! LINE RCB E W BARS �! SEE NOTE 3 ROUND EDGE TO 75 mm (3') R - STATION POINT, SEE NOTE 2- CONSTRUCTION JOINT IOM 0450mm r �\ (04 O 18•) OC LATERAL C / l CONNECTOR PIPE F BARS n � 13M 0 450 mm Q c (R4 O 180) OC ? BOTH WAYS TC go �� WHEN BE EIS 5300 MM h (60-) OR MORE OM O 450 m 0180c OR 41SECTION G -G /I ROUND EDGES TO APPROXIMATE R E IhOF WITH A MAXIMUM n Ip OF LATERAL OF 1.0 m (3'-0') 08EBARS O, E.HaGBARS, ! N CONSTRUCTION JOINT I` PLAN NEW OR EXISTING RCB. SEE NOTE 6 BARS 99 0 mm (39'1 1180 mm (70) 1050 w (42.1 190 w 17 V24 W BARS 1125 mm (459 1200 w (7 3/41 Q 0 1220 nm 1489 210 mm (81 -� D BARS ANY STANDARD 1275 mm (519 2W =IS I/29 'O F BARS / PIPE JOINT 1350 mm 041 230 mm (9') O 2-H BARS 100 mm 1- (44 OC, SEE NOTE 3 ROUND D EDGES (OM O 450 mm (#3 OR 04 m ELEV. S. O 18-) OC SEE NOTE e E BARS _•.t rte. • �• 2-6 BARS 100 mm � (4.1 OC, SEE NOTE 3 1500 mm (57.1 240 w (9 V49 40 ELEV. R, SEE NOTE 8 N 0 N on O s '^ m 1680 mm (661260 w 00 1/4 B T 1650 w (72-) 280 mm (11.1 1950 mm 1781 300 w (11 3/41 2to0 mm (84') 320 w (12 V2`) a� SHEET, OF 2 1Y m s � a T vim --r-ItA 0 U. 300 mm (12'1 130 mm (3•) o - 375 Rml (159 130 mm (S-) 450 w (181) 130 mm (5') 0 = 525 .. (21.) 130 mm (5•) 600 mm (24.1 HO w 45 1/49 675 mm (27.) HO w IS I&I 750 mm (301) 160 mm 16.) o 825 mm (33-I 1160 w 16 1/4') 99 0 mm (39'1 1180 mm (70) 1050 w (42.1 190 w 17 V24 W BARS 1125 mm (459 1200 w (7 3/41 Q 0 1220 nm 1489 210 mm (81 -� D BARS ANY STANDARD 1275 mm (519 2W =IS I/29 'O F BARS / PIPE JOINT 1350 mm 041 230 mm (9') O 2-H BARS 100 mm 1- (44 OC, SEE NOTE 3 ROUND D EDGES (OM O 450 mm (#3 OR 04 m ELEV. S. O 18-) OC SEE NOTE e E BARS _•.t rte. • �• 2-6 BARS 100 mm � (4.1 OC, SEE NOTE 3 1500 mm (57.1 240 w (9 V49 40 ELEV. R, SEE NOTE 8 1500 mm 1609 240 w (9 V2-) 0 N on O s '^ 1650 mm (631 260 w 009 1680 mm (661260 w 00 1/4 1600 mm 1699 280 w (10 3/40 1650 w (72-) 280 mm (11.1 1950 mm 1781 300 w (11 3/41 2to0 mm (84') 320 w (12 V2`) 2400 mm 190.1 340 w 03 1/4-11 SHEET, OF 2 1Y UNDISTURBED EARTH �-BACKFILL WITH 265 Kg -C (450-C-2000) MIX CONCF 1 COMPACT SOIL TO RELAT REQUIRED BY SPECIFICAI MAY BE OMITTED IF STR( ON UNDISTURBED EARTH DRAIN WALL. MPo OR DENSITY S. BACKFILL IRE IS LAID STORM LTV AR \7V I MVV 1�1 \171 izO n N I V 1O 4E o n 2550 m (1020) 400 w 05 IM 2700 mm 004`1410 mm (16') 3000 mm (1141420 w 06 1/2-) 3030 w 0201 430 mm 071 N50 'm' (126.1 430 mm (179 3300 w 0324 450 w (171/2-1 3450 w 0384 450 w 1171/2011 3600 w 0441 460 mm 08.) AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PROWORKS MULOATANDARDE PUBLIC JUNCTION STRUCTURE - PIPE TO RCB STANDARD PLAN METRIC ENSOOKTANDARDSINC., GREENBO COMMITTEE RCB TO PIPE 333-1 19 ,984 W^' REV 1996 SHEET, OF 2 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION NOTES 1. VALUES FOR A, B AND C SHALL BE SHOWN ON THE PROJECT DRAWINGS. ELEVATION R AND ELEVATION S SHALL BE SHOWN WHEN REQUIRED PER NOTE 8. 2. STATIONS SPECIFIED ON THE PROJECT DRAWINGS APPLY AT THE INTER- SECTION OF CENTER LINES OF MAIN LINE AND LATERALS, EXCEPT THAT STATIONS FOR CATCH BASIN CONNECTOR PIPES APPLY AT INSIDE WALL OF STRUCTURE. 3. REINFORCING STEEL SHALL CONFORM TO ASTM A 615M, GRADE 300, (ASTM A 615, GRADE 40). AND SHALL TERMINATE 40 mm (1 1/21) CLEAR OF CONCRETE SURFACE UNLESS OTHERWISE SHOWN. a. W BARS ARE OF SIZE AND SPACING SPECIFIED FOR WALL STEEL ON PROJECT DRAWINGS, AND SHALL BE CUT IN CENTER OF OPENING AND BENT INTO TOP AND BOTTOM OF JUNCTION STRUCTURE. b. OMIT H BARS WHEN SOFFIT OF SPUR IS 300 mm (12") OR LESS BELOW SOFFIT OF MAIN LINE, AND OMIT G BARS WHEN INVERT OF SPUR IS 300 mm (12') OR LESS ABOVE FLOOR OF MAIN LINE. 4. JUNCTION STRUCTURE SHALL BE POURED MONOLITHICALLY WITH MAIN LINE, MANHOLE OR TRANSITION STRUCTURE. 5. FLOOR OF STRUCTURE SHALL BE STEEL -TROWELED TO THE SPRING LINE. 6. WHEN CONNECTING TO EXISTING RCB, BREAKOUT LIMITS AND DETAILS SHALL BE SHOWN ON THE PROJECT DRAWINGS. 7. EMBEDMENT, P, SHALL BE 130 mm (5") FOR B = 2400 mm (96') OR LESS 200 mm (8') FOR B OVER 2400 mm (96'). 8. IF ELEVATION R AND ELEVATION S ARE NOT SHOWN ON THE PROJECT DRAWINGS THEN THE INLET OPENING SHALL FALL 150 mm (6') BELOW THE SOFFIT OF THE MAIN LINE WITH THE INLET PIPE LAID ON A STRAIGHT GRADE FROM MAIN LINE TO CATCH BASIN OR TO GRADE BREAK IN INLET LINE. ELEVATION S SHALL BE SHOWN ON THE PROJECT DRAWINGS IF THE INLET OPENING FALLS MORE THAN 150 mm (6') BELOW THE SOFFIT OF THE MAIN LINE WITH THE INLET PIPE LAID ON A STRAIGHT GRADE AS STATED ABOVE. ELEVATION R SHALL BE SHOWN ON THE PROJECT DRAWINGS ONLY WHEN A STUB IS TO BE PROVIDED FOR A FUTURE CONNECTION. 9. LATERALS OR CONNECTOR PIPES 600 mm (24') OR LESS IN DIAMETER SHALL BE NO MORE THAN 1.5m (5') ABOVE THE INVERT. LATERALS OR CONNECTOR PIPES 675 mm (27") OR LARGER IN DIAMETER SHALL BE NO MORE THAN 450 mm (18') ABOVE THE INVERT, WITH THE EXCEPTION THAT CATCH BASIN CONNECTOR PIPES LESS THAN 15 m (50') IN LENGTH SHALL NOT BE MORE THAN 1.5 m (5') ABOVE THE INVERT. 10. THE NEED FOR AN EDGE BEAM AND/OR ADDITIONAL REINFORCEMENT SHALL BE INVESTIGATED BY THE ENGINEER FOR ANY ONE OF THE FOLLOWING CONDITIONS: a. ANGLE A IS LESS THAN 300 b. TOP OF INLET PIPE IS LESS THAN 150 mm (60) BELOW THE SOFFIT c. FLOW LINE OF INLET PIPE IS LESS THAN 180 mm (7') ABOVE THE THE FLOOR OF THE RCB AT THE INSIDE FACE Ii. DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACT EQUAL VALUES. IF METRIC VALUES ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES, EXCEPT REINFORCING BARS SIZES IN ENGLISH UNITS MAY BE SUBSTITUTED FOR METRIC BAR SIZES. IF ENGLISH UNITS ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE ENGLISH UNITS. AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER STANDARD PLAN METRIC JUNCTION STRUCTURE - PIPE TO RCB o� SHEET 2 OF 2 I I r V .^\ 4&b l .yn SPANS 1.2 m THRU 2.4 m TYPICAL SECTION SPANS 3.0 m THRU 4.3 m SPANS 3.0 m THRU 4.3 m SINGLE BOX CULVERT NO SCALE KL B11ENSIONS IRE IN INILLIIETERS IRLESS OT 1!1E SMHII D8 0: _ TRANSITION STRUCTURE o� PUBLICN/ORxSRD6 INC GREENBOOKCOMMITTEE RCB TO PIPE 342-1 os W^' a Q 0 fn IM B USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION T --r-ItA At a a n RCP OR RC ARCH* IF B PLAN STA. SECTION A -A / II RCP OR ARCH 1 SECTION B -B to RCB OR RC ARCH* SNI w ARCH MAY HAVE A HORSESHOE - SHAPED, CIRCULAR, ELLIPTICAL OR SIMILAR CROSS SECTION. 1= � STEEL PATTERN SHOWN IS PICTORIAL ONLY, SEE NOTES 2 AND 7 CONSTRUCTION RCB OR ARCH TO RCP USE CONST. JOINT OF RCB OR ARCH. RCB TO ARCH, USE CONST. JOINT OF RCB AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER PROMULGATED BY THE TRANSITION STRUCTURE STANDARD PLAN METRIC PUBLICN/ORxSRD6 INC GREENBOOKCOMMITTEE RCB TO PIPE 342-1 ,992 REV im SHEET 1 OF 2 USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ��Q`�°moo L eon Fyc RECORD DRAWING a No. The information on th1S Ara Wng is eDl00 from oll anc' T Ifit be verified in the field by anyone prior to use Or tT Exa rlaf os a -nn(ct Nrtinn NAI 1 X FORFMAN. INC. is nM resnonsiae fnr Q(tOFESS'go ���(OapRO L BO,y��FZ i z � No. 24573 m� ,f Exp. 12/31/01 IL NdEct 'Recoil 0.-w;,, -&o tf8 9 -da I Fty r o • r 1 ADDED DETAIL SHEET RB C 5/6/99 �`' Y •3.4J 9J�. CIVIC Rc4P REVISIONS notion\/�I DATE \ AI DATE OF Cq1\FO -' nround faeitity locations or depictions. All above gmunr! ies can be readiy seen and verified by the parties thy.' M Imp, SImP' NOTES I. THE HORIZONTAL ANGLE OF DIVERGENCE OR CONVERGENCE, e, SHALL NOT EXCEED 5*45'. 2. REINFORCING STEEL BAR SIZES, SPACING, PATTERN AND COVER OVER THE STEEL SHALL BE AS FOLLOWS: RCB TO RCP AND RCB TO ARCH - THAT OF RCB SECTION, ARCH TO RCP - THAT OF ARCH SECTION. ARCH TO ARCH - THAT OF ARCH SECTION HAVING THE THICKER WALLS. THE BAR LENGTHS SHALL VARY UNIFORMLY THROUGHOUT THE TRANSITION. 3. THE CONCRETE THICKNESS SHALL BE AS FOLLOWS: RCB TO RCP AND ARCH TO RCP - THAT OF ARCH OR RCB SECTION UNLESS THE WALL THICKNESS OF THE RCP PLUS IOOmm l4'1 GREATER, IN WHICH CASE THE CONCRETE THICKNESS SHALL VARY UNIFORMLY FROM THAT OF THE ARCH OR RCB SECTION TO THAT OF THE RCP WALL PLUS IOOmm (4'). RCB TO ARCH AND ARCH TO ARCH - THAT OF THE ADJOINING RCB OR ARCH SECTION AT EACH END OF THE TRANSITION AND SHALL VARY UNIFORMLY BETWEEN THE TWO ENDS. 4. THE INTERIOR SURFACE SHALL BE SMOOTH AND VARY UNIFORMLY BETWEEN THE TWO ADJOINING SECTIONS. 5, AT RCP JUNCTURE, EMBEDMENT P SHALL BE 130mm (51 FOR PIPE SIZE OF 2400mm (96') OR LESS, AND 200mm (8") FOR PIPE SIZES OVER 2400mm (96'). 6. f� = 28 MPa(4000 PSI) AT 28 DAYS AND THE CONCRETE SHALL BE THE SAME MIX AS THE ADJACENT RCB. 7. ALL STEEL, EXCEPT LONGITUDINAL STEEL SHALL BE GRADE 400(60) BILLET STEEL CONFORMING TO ASTM A 615 M (A 615) AND SHALL TERMINATE 40mm (I 1/2') CLEAR OF CONCRETE SURFACE UNLESS OTHERWISE SHOWN. 8. KEYED CONSTRUCTION JOINTS OF THE SAME DIMENSIONS AS THOSE OF THE RCB OR ARCH SECTION MAY BE CARRIED THROUGH THE TRANSITION STRUCTURE AT THE CONTRACTOR'S OPTION. SEE SECTION B -B. 9. THE TRANSITION STRUCTURE SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE STRUCTURAL NOTES APPLYING TO RCB OR ARCH STRUCTURES SHOWN ON THE PROJECT DRAWINGS. 10. DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACT EQUAL VALUES. IF METRIC VALUES ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES. IF ENGLISH UNITS ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE ENGLISH UNITS. AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER STANDARD PLAN METRIC 342 - 1 TRANSITION STRUCTURE342-1 RCB TO PIPE SHEET 20F2 ■■ ■Ir Hall & lbremm, Inc. ■■PI i Civil Engineering - Planning • Surveying • Public Works 545 N. Mountain Ave. Ste. 106 Upland, CA 91786-9997 • (909) 982-7777 PREP RED UNDER THE SUPERVISION OF: IG" > ,f<, t' Ilan." RICHARD L. BOWMAN R.C.E. 24573 DATE: Io= CITY OF FONTANA, CALIFORNIA AWN BY STORM DRAIN PLANS SCALE: R.L.M. SIGNED BY DETAILS VERT: AS NOTED R.B. VEAS NOTED FOR ECKED BY DATE: R. B. TRACT O. 15949, -19 -2 1 05/06/99 3 NO. � � � DR. NO. SHT. NO. 5195 APS VED CITY ENGIN R� R.C.E.25126 2697 6 OF 6 0