HomeMy WebLinkAbout3745-116579
17Tldots
lommunl0
iy Facilities
Landscape Improvement Plans
Fontana, CA
DZ0 0
Stt'ZCt
Landscape Square Footage:
Base Line Road: 9,845
Locust Avenue: 4,355
Total: 14,200
BASE LINE ROAD
I
noun
I
r. —
� r
t'
i r
� f
CITY OF RIALTO
BiASEUNE ROAD
L-5
CITY OF FONTANA
Specifications
L-6
Planting
SITE
L-7
w
�
�
MONTGOMERY
AVE.
:w
�
r
�
O
0.
J
Uj
a
CID
a
W6
MILLER
AVE.
V
�"
N
Z
O
w
U
r
Z
o�
C
E
C
tL
U.
Q
J
0
Uv
Vicinity Map
not to scale North
41
i
GROVE PLACE
Site Plan
Scala: l"=40' NorthL=1
fll'�f
CITY OF F❑NTANA REQUIRED NOTES(
INSPECTIONSi
1, IT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT
THE ENGINEERING DIVISION'S LANDSCAPE INSPECTOR 48 HOURS
PRIOR TO DESIRED INSPECTION OF AN ITEM AT <909) 350-6633.
2. PRI❑R TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD
COMMENCEMENT THE FOLLOWING INSPECTIONS ARE REQUIRED,
PRE CONSTRUCTION MEETING
INSPECTION OF IRRIGATI❑N SYSTEM IN OPEN TRENCH
CONDITION (PRIOR TO BACKFILL). MAINLINE PRESSURE TEST
e 150 P.S.I. FOR A THREE (3) HOUR CONTINU❑US PERIOD,
IRRIGATI❑N COVERAGE TESTS INCLUDING INITIAL AND
FINAL TESTS,
FINISH GRADE PRIOR TO PLANTING.
PLANT MATERIALS PRIOR TO PLANTING AND SOIL
PREPARATION,
PLANTING, INCLUDING STREET TREES, CONTACT THE PARKS
PLANNING AND LANDSCAPE DEVELOPMENT SECTION,
ENGINEERING DIVISION, FOR SPECIES AND FINAL
LOCATIONS,
COMPLIANCE WITH APPROVED PLANS.
FINAL INSPECTION,
3. THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR
SHALL BE PRESENT AT EACH INSPECTI❑N.
Sheet Index
Title Sheet L-1
Irrigation Plan L-2
Planting Plan L-3
Irrigation Details L-4
Planting
Details
L-5
Irrigation
Specifications
L-6
Planting
Specifications
L-7
J
v
-
v "o t
�
'
J
�
�
:w
R I C H A R D
POP[
Landscape Architecture
Urban Design & Planning
181 N. T' Street, San Bernardino, CA 92401
phone: (909) 888-5568
fax, (909)384-9854
e-maN: rpa.la®veriaon net
Richard Pope, Landscape Architect CA# 2664
Owner/Applicant:
L Nomaeias Fereud Nemas
4240 E. Jun pa, 0402
Ontario, cA !1764
(!01)-937-3270
Atta: Oka LN
ft
m
Q
Sheet Description:
Title Sheet
F01lTANA 99
PHASE 1
AS -BUILT
Date: November 10, 2004
RP*A Job No.: 07-21/0549
Drawn by: LX0 SRP
Revisions:
Febrrary 24, 2005
As -stilts, October 15, 2507
RECORD DRAWINGS
Sheet:
Of: 7
�
C
C
�
�
r
�
O
0.
E
CID
OC
W6
V
�"
W
w
is
r
C
C
E
C
tL
U.
Q
J
Sheet Description:
Title Sheet
F01lTANA 99
PHASE 1
AS -BUILT
Date: November 10, 2004
RP*A Job No.: 07-21/0549
Drawn by: LX0 SRP
Revisions:
Febrrary 24, 2005
As -stilts, October 15, 2507
RECORD DRAWINGS
Sheet:
Of: 7