Loading...
HomeMy WebLinkAbout3713-2- - -- - - l- LMD LANDSCAPE AREA B A S E L I N E DEVELOPER INSTALLED CITY MAINTAINED ST. LT.I � 9 B R 0 A D ST. LT. 10' LANDS('', 21 c PAM n!►O!`�'^ Ow^•i,•�7 � • � � ? '�" �„0' � o . 0 0 Oar O (��'';llirr� .�'�. jMr101.0 '►71_S_' :e (,:J�.Q.O�.� 6' HTT, SPLIT–FACE SONRY BLOCK WALL W/ MATCHING OVERH NGING CONCRETE CAP ON EXTERIOR WALLS ROUNDED MORTAR CAP ON INTERIOR W LS SEE C. E. PLANS PLANTING NOTES Ttf:f�a manwwawa - ..... • ..........- - .......... . . . ...... _ ---- ---- .... -------------------•-----•--------------------------------------------23 —I I I i 8 57 Column on Stake ST. LT. j Lean Stake on Wall to Train POINT OF MEASUREMENT � n C' _ O i. � 1 � � 1011 �j IRL N, r t ■ 6' HT. SPLIT–FACESONRY BLOCK WALL W/ MATCHING OVERH NGING CONCRETE CAP ON EXTERIOR WALLS ROUNDED MORTAR CAP ON INTERIOR WA LS SEE C. E. PLANS 1.EXISTING UTILITIES — Information on the drawings relating to 4.Do not wilfully proceed with planting as designed when it is 10. Soil preparation — Follow Soils Report Recommendations, but existing utility lines and services is from the best sources obvious that unknown obstructions, grade differences and/or area for bid purposes, assume the rototilling of the following available. All such information is furnished only for differences exist that may not have been known during design. amendments into the soil at rates indicated per 1,000 square information and is not guaranteed. The Contractor shall excavate Such conditions shall be immediately brought to the attention of d test pits as required to determine exact locations of existing the Owner. The Contractor shall assume full responsibility for 5 Cu Yards nitrogen fortified sawdust utilities. all necessary revisions due to failure to give such notification. 150 Lbs gypsum Sandonkwo Viburnum 233 125 Lbs Gro Power Plus Call utility locating service for precise utility locations before beginning any work. Underground Service Alert (800) 422— S.Contractor shall be responsible for coordination with sub— Po any contractors as required to accomplish planting operations. 11. All soil for landscape planting areas or berms shall be 4133. 1 Gat, obtained from on—site excavations. Should import soil be Ficus pumila 61andscape Contractor to receive site as—graded. Contractor necessary, indicate source location. Soil shall be sandy loam 2.UTILITY REQUIREMENTS — The Contractor shall notify the following shall perform site visit to confirm grades prior to containing no toxic chemicals or elements which may inhibit or agencies at least 48 hours in advance of excavating around any of project execution. retard normal plant growth. Soil testing shall be done for this import and results shall be submitted and approved prior to soil their structures. The utility companies listed below shall be contacted. 7.See Specifications for planting requirements, materials and implementation. o Gas Company o Electrical Power Company execution. 12. Bark Mulch — All shrub/groundcover areas shall be top o Telephone Company o Cable Television Company B.See Details and Specifications for staking method, plant pit dressed with a 2" deep layer of shredded bark mulch. Contractor o Water Supply Company dimensions and backfill requirements. shall submit sample for approval by Landscape Architect. When P vED /* DRAWING NO.: 3713 the bark mulch is used, an adjustment to the planter finish The California Public Utilities Commission mandates that, in the 9. Soil testing shall occur after all soil has been imported to grades are required. interest of public safety, main line gas valves be maintained in the site, but prior to soil preparation. The Contractor shall a manner to be readily accessible and in good operating obtain a Soils Test for Agricultural Suitability and Fertility 13. It is the Contractor's responsibility to furnish plant condition. The Contractor shall notifythe Gas Company s P Y prepared by a California Association of Agricultural Laboratories materials free from pests or plant diseases. Pre—selected or Headquarters Planning Office at least two (2) working days prior member. This report shall be furnished to the Owner and 'tagged' material must be inspected by the Contractor and to the start of construction. Landscape Architect for review prior to implementation. Two certified pest and disease free. it is the Contractor's samples shall be taken at each location, (1) ground level to 10" deep, " (2) 24 to 36 deep. Each sample shall contain obligation to warranty all plant materials per the 3.Controctor shall be responsible for making himself familiar with P 9 p Specifications. all underground utilities, pipes and structures. Contractor approximately one quart of soil and be labeled per location and PP Y q shall take sole responsibility for any cost incurred due to depth. damage of said utilities. ROOT BARRIERS Root barriers are required for all trees within 5'-0" of any hardscape, curbs or walls. They shall be 24" deep, .08 thick and be placed flush with the top of any adjacent hardscape or curb and be centered 6' on either side of the tree (12'-0" long total). Use perimeter type barrier. No surround types. PLANTING LEGEND QTY. SIZE SYMBOL TREES 21 24” Box + A Logerstroemio Tuscarora Crope Myrtle 9 24" Box d B Pinus pineo Italian Stone Pine 22 15 Gallon o C Tristonio conferto Brisbane Box Tree ROOT BARRIERS Root barriers are required for all trees within 5'-0" of any hardscape, curbs or walls. They shall be 24" deep, .08 thick and be placed flush with the top of any adjacent hardscape or curb and be centered 6' on either side of the tree (12'-0" long total). Use perimeter type barrier. No surround types. LEGEND 24" Box 15 Gallon 8854 S. F. Provide 2" layer. shredded bark mulch SYMBOL SHRUBS areas. 42 1 Gal. a-1 Hemerocollis Stella d' Oro Daylily 171 5 Got. G 2 Raphiolepis i. Clara Indian Hawthorn 137 5 Gal. ®--3 Viburnum suspensum Sandonkwo Viburnum 233 1 Gal. 0 4 Dietes bicolor Fortnight Lily 57 1 Gat, 0-5 Ficus pumila Creeping Fig W GROUNDCOVERS „J DESIGNED BY: } 4956 S.F. Marathon II To// Fescue Sod Dale Waldo Date RLA 2528 (Exp. 12131/04) CHECKED BY: P vED /* DRAWING NO.: 3713 REV REVISION DESCRIPTION LEGEND 24" Box 15 Gallon 8854 S. F. Provide 2" layer. shredded bark mulch under all shrub areas. Provide sample to Landscape Architect for review and approval. 14. Final location of all plant materials shall be subject to the approval of the Owner's authorized representative. 15. Contractor shall notify Owner's authorized representative 48 hours prior to commencement of work to coordinate project inspection schedules. 16. Contractor shall verify plant material quantities on the plan. 17. Contractor to assure a minimum of 2% positive drainage in all planting areas. 18. in areas with existing street turf or groundcover. Contractor shall be responsible for repair of damage, bare spots and all scars due to irrigation installation, construction or re—grading and match existing planting to achieve a uniform overall appearance. 0 G;nO��Yd,a shall have 24" deep perimeter root barriers by Deep Root Corporation (714) 898-0563. Root barriers shall be installed per the manufacturer's perimeter installation recommendations. No surround type barriers are allowed. 5 Gallon 1 Gallon Quantity Type 420 i,QR SIGHTiDISTANCE t i 6' HT. SPL IT– FACE MASONRY BLOCK WALL W/ MATCHING OVERHANGING CONCRETE CAP ON EXTERIOR WALLS & ROUNDED MORTAR SEE C. E. PLANS CITY INSPECTIONS Contractor shall contact the Engineering Dept. at least 48 hours in advance of desired inspection at (909)350-6649. SCALE. 1"_20' 20' 0 20' 40' VJ M i Ill ►VCFAMOW STRIP L I' SHEET L3 MONUMNT WALL DER DEFTAIL SHEET L3 I i I i I i I 10! LANDSCAPE BUFFER I I I i I 48 i i 4 , LL, t W Z I I Y i � J I , ' I ' 78 j 2 j i Z i i W 16' WI E ! FIRE EPT. ACCE LANE w/ROL ED CURB SEE C.F. 3 PLAN F)EDEPT. I T.S. RASH GATE W/ K OX BOX SEE C}, E. PLANS 3 W I i „J t W Z I I Y i � J I , ' I SCAPE AREA ? INSTALLED AINED I i / PLANTING PLAN L2 2 OF 6 o.4-tos 4 01 0 [IT o DIS- TVO WORKING BEFORE DAYS BEFORE YOU DIG YOU DIG TOLLFREE 1-800-226-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT ' CHAWLM aMUK WALK To MuwDEWC i SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWOMAPLE YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH DATE STANDARDS IN EFFECT. I D W L A Waldo Londscope Arch�fecture 59 � Wwk 9 A �����`�'" � far �1'�%'` , Lie /M1►/bff 2W CITY OF FO NTANA, CALIFORNIA 2 I 20DEc04 I 3 � 0(1-�iw��v6 z a�.o� I DRAWN BY: SWC BASELINE RD. & MAPLE AVE. TENT. TRACT 16743 D.R. #04-014 SCALE: Noted + LMD LA ' DEVELO DESIGNED BY: CITY MAI i i Dale Waldo Date RLA 2528 (Exp. 12131/04) CHECKED BY: P vED /* DRAWING NO.: 3713 REV REVISION DESCRIPTION DATE ENGR. CITY i + I I T. LT. SCAPE AREA ? INSTALLED AINED I i / PLANTING PLAN L2 2 OF 6 o.4-tos 4 01 0 [IT o DIS- TVO WORKING BEFORE DAYS BEFORE YOU DIG YOU DIG TOLLFREE 1-800-226-2600 A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT CHAWLM aMUK WALK To MuwDEWC 23NOVO4 SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT COMMENCE WITHIN TWOMAPLE YEARS OF THE DATE OF APPROVAL SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO BRING THEM INTO CONFORMANCE WITH DATE STANDARDS IN EFFECT. 1 D W L A Waldo Londscope Arch�fecture 59 � Wwk 9 A �����`�'" � far �1'�%'` , Lie /M1►/bff 2W CITY OF FO NTANA, CALIFORNIA 2 c� REOUWD Res Ns 20DEc04 GROVE LMD LANDSCAPE PLAN 3 � 0(1-�iw��v6 z a�.o� PWDble DRAWN BY: SWC BASELINE RD. & MAPLE AVE. TENT. TRACT 16743 D.R. #04-014 SCALE: Noted DESIGNED BY: DATE: 4 OCT 04 Dale Waldo Date RLA 2528 (Exp. 12131/04) CHECKED BY: P vED /* DRAWING NO.: 3713 REV REVISION DESCRIPTION DATE ENGR. CITY ITY EWGINEEffORCE 51152 DATE