Loading...
HomeMy WebLinkAbout3702-3Planting Legend SYMBOL QTY SIZE BOTANICAL NAME SEE PLANTING DETAILS, SHEET L-5 COMMON NAME Limit of Work IS backfill mix, plants shall also receive Gro -Power 7 gram Planting Tablets at the following rates: 3 tablets per 5 gallon, 15 tablets per 15 gallon, 16 tablets per 24" box, 30 tablets per 36" box Jded bark mulch shall be placed in all planting beds, except lawn areas ding purposes only. Contractor shall be responsible for exact count per plan. Sultana Ave. CFD G 15 gal. Pi5tacia chinen5i5 Chinese Plstache e 22 1 gal. Parthenoci55u5 tricu5pidata Boston Ivy DRY SEEDED MIX LB/AQ SPECIES MINIMUM PURITY/GERM DRY SEED PREPARATION & APPLICATION G 15 gal. Chitalpa ta5hkcntcn515 Chitalpa 12" Flats Myoporum parvifolium 'Pink' Pink Myoporum 2 Stipa pulchra 40/30 O.C. ) 9 gently Pn9P n9 �P- PP�1 2 Stipa lepida 40/30 1 After the final rade has been established, all flat or entl sloping planting areas shall be s footed or cross -ripped just 2 Stipa lepidcoroata 70/40 prior to seeding. The final pass with the rippers shall be done on the contour. Steep slopes shall be track -walked vertically. All • 4 15 al. Rhus lancea African Sumac - - - - - - - soil surfaces shall be left in as rough a condition as possible. 9 -- _ : - Sod Fe5tuca elatior Marathon II Marathon 11 Tall Fescue 2 Lupinus bicolor/Sky Lupine 95/80 4 Gnaphlium californicum/Califomia Everlasting ------ 2) Should any areas become compacted or eroded prior to seeding, re -roughening of the soil surface shall be required. 2 Achillea tomentosa/Wooly Yarrow 90/80 O 12 5 gal. Grevillea noelli Grevillea nB 12" Flats Lonicera japonica Japanese Honeysuckle 3 Lotus scoparius/Deerweed 40/60 3) Upon completion of soil preparation, apply seed, dry, at the rate specified. 0. C. 3 Sisyrinchium bell um/Blue-Eyed Grass 95/75 O 4) Apply two (2) tons of straw per acre over seed and imprint both seed and straw into soil with light sheep -foot. 4 5 gal. Caesailpinia pulcherrima Red Bird of Paradise 2 Nemophila menziesllBaby Blue Eyes 95/85 3 Eschscholzia californica/Califomia Poppy 95/75 4 Eriophyllum conferttflorum/Golden Yarrow 35/75 5} All dry seeding shall be performed and completed between December 15th and April 15th. ® I G 5 gal. Ci5tu5 purpureus Orchid Rockr05e y�. 6) It is the contractor's responsibility to prevent soil erosion and assure seed germination by any means necessary including, but 071 5 gal. Ligu5trum ovalifolium California Privet not limited to, erosion control blankets, additional straw mulch, temporary irrigation, hand seeding, etc. Other means of seed Planting Plan germination may be acceptable, check with Landscape Architect. Maintenance period shall be extended until 100 % germination Scale: 1"=W North is achieved. VA VAil Mlak toI� M wEseed Statei Leval Celt and hWatry StaMarrs. WrSitten iweaeiealene to Pnewle Sed Num"ns. AL TOLL FREE 800-227-2600 IiISlE Ilia YTNJM: T LEAST TWO DAYS The Contractor shall be responsible for locating or verifying locations of all existing utilities, and for protection of same. Damages resulting from Contractor's work BEFORE YOU DIG or that of Contractor's sub -contractors shall be restored to original condition at their own expense. City shall have the final say if repairs are to be made by Detail/ section number CEF =G'_ii _EF I_E ALEFT F _C,_'THEF _-uFOFi,'- Contractor or others. Sheet number R I C H A R D POD[ Landscape Architecture Urban Design & Planning 181 N. 'E'Street, San Bernardino, CA 92401 phone: (909) 888-5568 fax: (909) 384-9854 e-moN: rpa.la*wWzon net Richard Pope, Landscape Architect CA# 2664 'Q k-0' �'�PF fi�OS ELC Cy GWC II— N\�A�I F CF CXV / Owner/Applicant: Strdmm Home, Inc. 2201 Dupont Drive, Saha 300 Irvine, CA 92012 (949)833-1554 Attn: Mike Aller r C%woo N IL V �A f+ � � fig E CLL E o — ;+ E r C C 1i yQri Sheet Description: Planting Plan Date: September 8, 2004 RP*A Job No.: 04-33 Drawn by: LO JRO Revi5ion5: Sheet: L=3 Of: 7