HomeMy WebLinkAbout3702-1r i ,
1 r f 1
r
J
Communio Facilities District (C,,F,,D.) Areas
Landscape'Improvement Plans
Fontana, CA
Landscape Square Footage:
Sultana Avenue: 4,150
Detention Basin: 1,965
Tota I : S,11 a
Site Mas
kale: 1'=4& North
X
Vicinity Map
not to scale North
CITY OF F❑NTANA REQUIRED NOTES:
INSPECTION&
1. IT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT
THE ENGINEERING DIVISION'S LANDSCAPE INSPECTOR 48 HOURS
PRIOR TO DESIRED INSPECTION OF AN ITEM AT (909) 350-6633,
2, PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD
COMMENCEMENT THE FOLL❑WING INSPECTIONS ARE REQUIRED,
PRE CONSTRUCTION MEETING
INSPECTI❑N OF IRRIGATION SYSTEM IN OPEN TRENCH
CONDITI❑N (PRIOR TO BACKFILL). MAINLINE PRESSURE TEST
e 150 P,S,I, FOR A THREE (3) HOUR CONTINUOUS PERIOD.
IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND
FINAL TESTS.
FINISH GRADE PRIOR TO PLANTING.
PLANT MATERIALS PRIOR TO PLANTING AND SOIL
PREPARATION,
PLANTING, INCLUDING STREET TREES, CONTACT THE PARKS
PLANNING AND LANDSCAPE DEVELOPMENT SECTION,
ENGINEERING DIVISION, FOR SPECIES AND FINAL
LOCATIONS,
COMPLIANCE WITH APPROVED PLANS.
FINAL INSPECTION,
3. THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR
SHALL BE PRESENT AT EACH INSPECTION,
Sheet Index
Title Sheet
Irrigation Plan
Planting Plan
Irrigation Details
Planting Details
Irrigation Specifications
Planting Specifications
L-1
L-2
L-3
L-4
L-5
L-6
L-7
R 1 C H A R D
POP[
Im 0
11 town ma -
Landscape Architecture
Urban Design & Planning
181 N. 'E'Street, San Bernardino, CA 92401
phone- (909) 888-5568
fax: (909) 384-9854
e-mail: rpa.la0veriron.net
Richard Pope, Landscape Architect CA# 2664
�ANDSC,�p�.
y �
N C)
40>1
2 b
OF CAL ,
Owner/Applicant:
Stratham Homes, Inc.
2201 Duped Dr., Suite 300
Irwin, Ca. 92612
(949) 833-1554
Attn: Mike Aller
Sheet Description:
Title Sheet
Date: September 8, 2004
RP4A Job No.: 04-33
Drawn by: LE JRO
Revisions:
Sheet:
L=1
Of: 7
our
0
V
N'010000'010000.
CM
dw
�
�
r
�
S
t—
as
++
�_
•—
tC
O
v
_O
1L
CL
E
o
s
L
Q
—
o.
2
_�
c
4
0O
C
C
a f%
C3i6J
Sheet Description:
Title Sheet
Date: September 8, 2004
RP4A Job No.: 04-33
Drawn by: LE JRO
Revisions:
Sheet:
L=1
Of: 7