HomeMy WebLinkAbout3631-1,I -FUTURE CURB
l EX. R/W -
EX. EP
04 80+00 G�EX. CL STRIPE 8 T-+-00-
�EX. EP o
EX. R/W
E�J=
SCALA: 1" = 40'
FUTURE MEDIAN
PER DWG. NO. 3247
800- 83 fi0�
R/W CIG
i
N 0' 15'25"-N-
i,
0
0 '
PRIVATE ENGINEER'S NOTICE TO CONTRACTORS
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES OR STRUCTURES SHOWN
ON THESE PLANS ARE OBTAINED BY A SEARCH OF AVAILABLE RECORDS; TO THE BEST
OF OUR KNOWLEDGE, THERE ARE NO EXISTING UTILITIES EXCEPT THOSE SHOWN ON
THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES
TO PROTECT THE UTILITY LINES SHOWN ON THESE DRAWINGS. THE CONTRACTOR FURTHER
ASSUMES ALL LIABILITY AND RESPONSIBILITY FOR THE UTILITY PIPES, CONDUITS OR
STRUCTURES SHOWN OR NOT SHOWN ON THESE DRAWINGS.
THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY
FOR THE JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS
PROJECT; INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THAT THIS SHALL APPLY
CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE
CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNER AND THE ENGINEER
HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE
PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE
SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER.
CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AND SHALL REPORT ALL
DISCREPANCIES TO THE ENGINEER PRIOR TO THE COMMENCEMENT OF ANY WORK IT IS
THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE ENGINEER OF ANY
DISCREPANCIES. BEGINNING OF WORK MEANS ACCEPTANCE OF CONDITIONS.
CONTRACTOR SHALL COMPLY WITH ALL N.P.D.E.S. REQUIREMENTS.
CONTRACTOR SHALL ADJUST TO FINISH GRADE ALL MANHOLE RIMS, WATER VALVE BOXES,
UTILITY BOXES AND LIDS, ETC.
.moo
of
W
U o
N
O
J 68'
V '
12' 22' 22' 12
DP_
R/W -- --
FUTURE MEDIAN
PER DWG. NO. 3247 0
)0 87+00
1
TRAFFIC SIGNAL INTERCONNECT GENERAL NOTES:
1. TRAFFIC SIGNAL INTERCONNECT SHALL CONFORM TO THESE PLANS,
THE CURRENT STANDARD PLANS AND SPECIFICATIONS FOR THE CITY OF FONTANA AND
THE STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD PLANS AND
SPECIFICA TIONS (DA TED, JUL Y 2002).
2. LOCA TION OF ALL UNDERGROUND FACIL I TIES ARE APPROXIMA TE, THE CONTRACTOR
SHALL POTHOLE TO DETERMINE THE EXACT LOCATIONS AND VERIFY CONDITION ON THE JOB SITE.
HAND DIG UNTIL CLEAR OF OBSTRUCTIONS PHONE UNDERGROUND SERVICE ALERT AT
(800) 227-2600, TWO WORKING DAYS BEFORE DIGGING.
J. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT EQUIPMENT
LOCATIONS PRIOR TO FINAL PLACEMENT.
4. ALL REQIURED CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA
ENGINEERING DIVISION PRIOR TO COMMENCEMENT OF WORK.
5. ALL TRAFFIC CONTROL WORK ZONES AND LANE CLOSURES SHALL BE COMPLETELY
DELINEATED BY CHANNELIZA TION DEVICES AND SHIELDED BY BARRIERS TO EXCLUDE VEHICLE
AND/OR PEDESTRIAN TRAFFIC. CONTRACTOR SHALL FOLLOW THE MANUAL OF TRAFFIC CONTROL
DEVICES FOR CONSTRUCTION AND MAINTENANCE OF WORK ZONES, CALTRANS STANDARD
SPECIFICATIONS AND STANDARD PLANS, LATEST EDITION. EXACT LOCATION OF ALL TRAFFIC
CONTROL TO BE DETERMINED BY THE ENGINEER.
6. COMMUNICATION PULLBOXES SHALL BE INSTALLED AT 600' MAXIMUM SPACING, UNLESS
OTHERWISE DIRECTED BY THE ENGINEER.
7. EXISTING DRIVEWAY ACCESS SHALL BE MAINTAINED BY THE CONTRACTOR AT ALL TIMES.
8. CONTRACTOR SHALL INSTALL CONDUIT UNDER ALL CONCRETE DRIVEWAYS USING BORING METHOD.
(SEE SPECIAL PROVISIONS.)
9 ALL INTERCONNECT PULLBOXES SHALL BE TYPE P48, 48.5 x30.5"x30" DEEP (INSIDE),
PRE–CAST CONCRETE , HAVE FIBERGLASS LOCKING LIDS AND BE LABELLED "COMMUNICATIONS."
- - - — - - - - — - - - - - - — - - - - - - —
EP
EX. CL STRIPE
114- 91+0 92 +-fr0
88+00 N 0'1 W 89±00 QOTO _-
--
EPi-----—
X. R/W
CITRUS AVENUE
EXIST. CURB
AND/ OR GUTTER
0
n
7R 7 — — — � — —
-�--�-
/W C/G
..
INTERCONNECT CONSTRUCTION NOTES:
1❑ FURNISH AND INSTALL 6-1.5" (41 mm) SCHEDULE 40 HDPE CONDUITS PER 940 LF
DETAIL 'A" THE CONDUITS SHALL BE COLOR CODED ORANGE, YELLOW
RED, BLACK, BLUE AND GREEN. INSTALL ONE PULL ROPE IN EACH CONDUIT
FOR FUTURE CABLE. CONDUIT SWEEPS SHALL BE INSTALLED WITH A MINIMUM
3 FOOT RADIUS.
SIDEWALK
2❑ FURNISH AND INSTALL SPLICE VAULT(P48) W/LOCKING FIBERGLASS LIDS. J EA
NATIVE SOIL AT 90q SPLICE VA UL T COVER TO BE INSCRIBED "COMMUNICA TIONS"
COMPACTION (IF SIDEWALK
DOES NOT EXIST. COMPACTED
NATIVE SOIL SHALL BE FLUSH
WITH SURROUNDING SURFACE).
6-1.5"(41 mm) SCH 40 HDPE
CONDUITS AND 4–SACK
ORANGE PEA GRAVEL BACKFILL.
DUCT INSTALLATION AND TRENCH REPAIR DETAIL
(PARKWAY INSTALLATION)
NOT TO SCALE
DETAIL "A "
J:\685-1650\streets\CitrusstInterconnectinq.dwq, 10/6/2005 11:19:21 AM, drench
It
JA
J�
"V
"V
PRIVATE ENGINEER'S NOTICE TO CONTRACTORS
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITIES OR STRUCTURES SHOWN
ON THESE PLANS ARE OBTAINED BY A SEARCH OF AVAILABLE RECORDS; TO THE BEST
OF OUR KNOWLEDGE, THERE ARE NO EXISTING UTILITIES EXCEPT THOSE SHOWN ON
THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES
TO PROTECT THE UTILITY LINES SHOWN ON THESE DRAWINGS. THE CONTRACTOR FURTHER
ASSUMES ALL LIABILITY AND RESPONSIBILITY FOR THE UTILITY PIPES, CONDUITS OR
STRUCTURES SHOWN OR NOT SHOWN ON THESE DRAWINGS.
THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY
FOR THE JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS
PROJECT; INCLUDING SAFETY OF ALL PERSONS AND PROPERTY. THAT THIS SHALL APPLY
CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE
CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNER AND THE ENGINEER
HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION WITH THE
PERFORMANCE OF WORK ON THIS PROJECT, EXCEPTING FOR LIABILITY ARISING FROM THE
SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER.
CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AND SHALL REPORT ALL
DISCREPANCIES TO THE ENGINEER PRIOR TO THE COMMENCEMENT OF ANY WORK IT IS
THE RESPONSIBILITY OF THE CONTRACTOR TO NOTIFY THE ENGINEER OF ANY
DISCREPANCIES. BEGINNING OF WORK MEANS ACCEPTANCE OF CONDITIONS.
CONTRACTOR SHALL COMPLY WITH ALL N.P.D.E.S. REQUIREMENTS.
CONTRACTOR SHALL ADJUST TO FINISH GRADE ALL MANHOLE RIMS, WATER VALVE BOXES,
UTILITY BOXES AND LIDS, ETC.
.moo
of
W
U o
N
O
J 68'
V '
12' 22' 22' 12
DP_
R/W -- --
FUTURE MEDIAN
PER DWG. NO. 3247 0
)0 87+00
1
TRAFFIC SIGNAL INTERCONNECT GENERAL NOTES:
1. TRAFFIC SIGNAL INTERCONNECT SHALL CONFORM TO THESE PLANS,
THE CURRENT STANDARD PLANS AND SPECIFICATIONS FOR THE CITY OF FONTANA AND
THE STATE OF CALIFORNIA DEPARTMENT OF TRANSPORTATION STANDARD PLANS AND
SPECIFICA TIONS (DA TED, JUL Y 2002).
2. LOCA TION OF ALL UNDERGROUND FACIL I TIES ARE APPROXIMA TE, THE CONTRACTOR
SHALL POTHOLE TO DETERMINE THE EXACT LOCATIONS AND VERIFY CONDITION ON THE JOB SITE.
HAND DIG UNTIL CLEAR OF OBSTRUCTIONS PHONE UNDERGROUND SERVICE ALERT AT
(800) 227-2600, TWO WORKING DAYS BEFORE DIGGING.
J. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT EQUIPMENT
LOCATIONS PRIOR TO FINAL PLACEMENT.
4. ALL REQIURED CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA
ENGINEERING DIVISION PRIOR TO COMMENCEMENT OF WORK.
5. ALL TRAFFIC CONTROL WORK ZONES AND LANE CLOSURES SHALL BE COMPLETELY
DELINEATED BY CHANNELIZA TION DEVICES AND SHIELDED BY BARRIERS TO EXCLUDE VEHICLE
AND/OR PEDESTRIAN TRAFFIC. CONTRACTOR SHALL FOLLOW THE MANUAL OF TRAFFIC CONTROL
DEVICES FOR CONSTRUCTION AND MAINTENANCE OF WORK ZONES, CALTRANS STANDARD
SPECIFICATIONS AND STANDARD PLANS, LATEST EDITION. EXACT LOCATION OF ALL TRAFFIC
CONTROL TO BE DETERMINED BY THE ENGINEER.
6. COMMUNICATION PULLBOXES SHALL BE INSTALLED AT 600' MAXIMUM SPACING, UNLESS
OTHERWISE DIRECTED BY THE ENGINEER.
7. EXISTING DRIVEWAY ACCESS SHALL BE MAINTAINED BY THE CONTRACTOR AT ALL TIMES.
8. CONTRACTOR SHALL INSTALL CONDUIT UNDER ALL CONCRETE DRIVEWAYS USING BORING METHOD.
(SEE SPECIAL PROVISIONS.)
9 ALL INTERCONNECT PULLBOXES SHALL BE TYPE P48, 48.5 x30.5"x30" DEEP (INSIDE),
PRE–CAST CONCRETE , HAVE FIBERGLASS LOCKING LIDS AND BE LABELLED "COMMUNICATIONS."
- - - — - - - - — - - - - - - — - - - - - - —
EP
EX. CL STRIPE
114- 91+0 92 +-fr0
88+00 N 0'1 W 89±00 QOTO _-
--
EPi-----—
X. R/W
CITRUS AVENUE
EXIST. CURB
AND/ OR GUTTER
0
n
7R 7 — — — � — —
-�--�-
/W C/G
..
INTERCONNECT CONSTRUCTION NOTES:
1❑ FURNISH AND INSTALL 6-1.5" (41 mm) SCHEDULE 40 HDPE CONDUITS PER 940 LF
DETAIL 'A" THE CONDUITS SHALL BE COLOR CODED ORANGE, YELLOW
RED, BLACK, BLUE AND GREEN. INSTALL ONE PULL ROPE IN EACH CONDUIT
FOR FUTURE CABLE. CONDUIT SWEEPS SHALL BE INSTALLED WITH A MINIMUM
3 FOOT RADIUS.
SIDEWALK
2❑ FURNISH AND INSTALL SPLICE VAULT(P48) W/LOCKING FIBERGLASS LIDS. J EA
NATIVE SOIL AT 90q SPLICE VA UL T COVER TO BE INSCRIBED "COMMUNICA TIONS"
COMPACTION (IF SIDEWALK
DOES NOT EXIST. COMPACTED
NATIVE SOIL SHALL BE FLUSH
WITH SURROUNDING SURFACE).
6-1.5"(41 mm) SCH 40 HDPE
CONDUITS AND 4–SACK
ORANGE PEA GRAVEL BACKFILL.
DUCT INSTALLATION AND TRENCH REPAIR DETAIL
(PARKWAY INSTALLATION)
NOT TO SCALE
DETAIL "A "
J:\685-1650\streets\CitrusstInterconnectinq.dwq, 10/6/2005 11:19:21 AM, drench