Loading...
HomeMy WebLinkAbout3628-1DIST COUNTY ROUTE KILOMETER POST SHEET TOTAL TOTAL PROJECT No SHEETS HIQHI AND AVE I 1 HIGHLAND AVE. CITY NOTES REGARDING INSPECTIONS:Q 15 0 Q N TABLE OF CONTENTS a FONTANA w N �_ 1. IT IS THE LANDSCAPE CONTRACTOR'S RESPONSIBILITY TO CONTACT THE w m 1 L-0 COVERSHEET ENGINEERING DIVISION'S LANDSCAPE INSPECTOR 48 HOURS PRIOR TO ASELIN AVE :� BASELINE AVE. DESIRED INSPECTION OF AN ITEM AT (909) 350-7627 OR 350-7684. CITY OF 2. PRIOR TO RELEASE OF UTILITIES OR MAINTENANCE PERIOD COMMENCEMENT, RANCHO 0 CINOF 2 LC -1 LANDSCAPE CONSTR4JCTION PLAN THE FOLLOWING INSPECTIONS ARE REQUIRED: CUCAMONGA PROJECT ROUTE ss FONTANA 3 LC -2 LANDSCAPE CONSTRUCTION PLAN SITEA. PRE -CONSTRUCTION MEETING. FOOTHILL BLVD. 4 LC -3 LANDSCAPE CONSTRUCTION PLAN B. INSPECTION OF IRRIGATION SYSTEM IN OPEN TRENCH CONDITION (PRIOR TO BACKFILL). MAINLINE PRESSURE TEST AT 150 P.S.I. COUNTY OF SAN BERNARDINO5 LC -4 LANDSCAPE, CONSTRUCTION PLAN FOR A THREE (3) HOUR CONTINUOUS PERIOD. I 6 LC -5 LANDSCAPE CONSTRUCTION PLAN C. IRRIGATION COVERAGE TESTS INCLUDING INITIAL AND FINAL TESTS. D. FINISH GRADE PRIOR TO PLANTING. E. PLANT MATERIALS PRIOR TO PLANTING AND SOIL PREPARATION. �C''TY IAP 7 LI -1 LANDSCAPE IRRIGATION PLAN F PLAPARKS ANDINCLUAING STREET TREES. NDSCAPE DEVELOPMENT ONSECTION,TACT EENGNEERING N.T.S. 8 LI -2 LANDSCAPE IRRIGATION PLAN DIVISION, FOR SPECIES AND FINAL LOCATIONS. 9 LI -3 LANDSCAPE IRRIGATION PLAN G. COMPLIANCE WITH APPROVED PLANS. 10 LI -4 LANDSCAPE IRRIGATION PLAN H. FINAL INSPECTION. 3. THE OWNER'S REPRESENTATIVE AND LANDSCAPE CONTRACTOR SHALL BE 11 LI -5 LANDSCAPE IRRIGATION PLAN PRESENT AT EACH INSPECTION. 1 , 12 LP -1 LANDSCAPE PLANTING PLAN 13 LP -2 LANDSCAPE PLANTING PLAN 14 LP -3 LANDSCAPE PLANTING PLAN NOTICE TO CONTRACTORS: 15 LP -4 LANDSCAPE PLANTING PLAN LC -1 LC -2 LC -3 LC -4 LC -5 16 LP -5 LANDSCAPE PLANTING PLAN THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE U-1 LI -2 LI —3 U-4 U-5 RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT, INCLUDING SAFETY OF ALL PERSONS LP -1 LP -2 LP -3 LP -4 LP 5 17 LS -1 LANDSCAPE PLANTING PLAN AND PROPERTY: THAT THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT THE18 LS -2 LANDSCAPE PLANTING PLAN CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE AGENCY AND THE FOOTHILL — LS -2 L S - 3 �S-4 LS -5j 19 LS -3 LANDSCAPE PLANTING PLAN ENGINEER HARMLESS FROM ANY AND ALL LIABILTY, REAL OR ALLEGED, BOULEVARD IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT, 20 LS -4 LANDSCAPE PLANTING PLAN EXCEPTING FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE AGENCY OR THE ENGINEER. 21 LS -5 LANDSCAPE PLANTING PLAN w >-w o LLj ow Uw z Li Q �ZI ZZw a: AW >Z Z 22 LD -1 LANDSCAPE DETAILS W Q ? ¢> U Q Q J Q w Q �Q pqQ 23 LD -2 LANDSCAPE IRRIGATION DETAILS PROJECT KEY MAP N.T.S. Underground Service Alert gErORE '" Ga Call: TOLL FREE 1-8010 422-4133 TWO WORKING DAYS BEFORE YOU DIG LANDSCAPE AREA 6,210 SQ. METERS or 66,850 SQ. FEET NOTE: ALL DIMENSIONS ARE IN METERS UNLESS SHOWN OTHERWISE.