HomeMy WebLinkAbout3556-1i
ISL
i� IIS
LEVVIS 5"
OPut�ORA N
`~FA
U�"ORPORATIOiq
Aff
Tr -1 Ty"
City Required Notes,
Inspections:
1. It is the Landscape Contractor's responsibility to contact the
Engineering Division's Landscape Inspector
48 hours Prior to desired inspection of an item at (909)350-7627
2. Prior to the release of utilities or maintenance period commencement,
the following inspections are required
Pre -construction meeting
Inspection of irrigation system in open trench condition (prior to backfill).
Mainline pressure test @ 150 p.s.i. for a three (3) hour period.
Irrigation coverage tests including initial and final tests.
Finish grade prior to planting.
Plant materials prior to planting.
Planting, including street trees. Contact the Parks Planning and Landscape
Development section Engineering Division, for species and final locations.
Compliance with approved plans.
Final Inspection.
3. The Owner's representative and Landscape Contractor shall be present at each inspection.
The City of Fontana "Standard Landscape Specification Manual for Streetscapes" shall
become a part of this document.
Maintenance Guidelines
Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall include but
not be limited to:
1. Cultivation of planted beds at intervals not to exceed ten (10) days.
2. Regular mowing to maintain lawn height not to exceed two (2) inches (will vary with species).
3. Regular pruning of plants as necessary to control and direct growth r
a
4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for
proper plant growth. Drip irrigation may require specialized landscape maintenance care.
5. Immediate replacement of irrigation materials as needed to maintain good working condition.
6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant
growth.
7. Immediate repair or replacement of irrigation materials as needed to maintain food working condition.
8. Stakes, guys, and ties on trees shall be checked regularly for correct function. Ties are to be
adjusted to avoid abrasions or girdling of trunk or branches.
9. Upon completion of three (3) month (90 day) contract maintenance period, an inspection shall be
made by the Community Development Department Engineering Division Landscape Inspection Staff. The
landscape shall be maintained in accordance with these landscape maintenance standards.
10. The DevelonerBuilder is responsible to contact the Citv and schedule the maintenance inspection.
SITESCAPES, INC. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND
SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE
ARCHITECTURAL STANDARDS. SITESCAPES, INC. CANNOT GUARANTY THE
QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF
IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS
ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR
PROPERTY DAMAGE RESULTING FROM DEVIATIONS. SITESCAPES, INC.
IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION
WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR THEREAFTER.
n
[Dan A 1 .8 r
U 7
VICINITY MAP
�<0 RIVERSIDE AVENUE
z
W
Z W
W
CITY Q Q
OF
CITY
FONTANA
DUNCAN CYN. RD. OF
RIALTO
W Q H
D
Z R'
WW U
Q In O
0
SUMMIT AVENUE
Y CURTI D
UJ AVE. ,
W U
U SIERRA LAKES PARKWAY
W
r
_J r ALNUT AVE.
PROJECT
SITE
, - MC11202
VVI\ 1 I.J r1V L_11VL
LANDSCAPE FOR THE
RETENSION BASIN IS ON SITE
AND WILL BE SHOWN ON
THE TRACT No. 16427-2 ON-SITE
LANDSCAPE PLANS.
SUMMIT AVENUE
0
Landscape 3195-B Airport Loop Dr., (949) 644-9370
Architecture Costa Mesa, CA. 92626 FAX (714) 210-3140
& Planning Richard Polhamus, License # 2782
- Fi- 11 F4_
SUBMITTALS
1 ST SUBMITTAL
2ND SUBMITTAL 3/10/04
APPROVALS
i
6 R' ` E V 10' N S
0 A
.T/ zB 1O5 ff
A AA
Q
0 D
A A
0 0
JOB NO.
�OtiANDSCAp�
���� k.POLH9G�f 0-017
CJS 4 � 2782 �s
� a
SIGVATORE DATE
* ��
9%'�Xvation Ikttel0-j�� �
OF CA��� O /2 2 /0 3 1