HomeMy WebLinkAbout3495-1GENERAL NOTES:
1, TRAFFIC SIGNAL, SIGNING AND STRIPING, AND LIGHTING SHALL CONFORM TO THESE
PLANS, THE SPECIAL PROVISIONS, THE CITY OF FONTANA STANDARD DETAILS, AND THE
STATE OF CALIFORNIA STANDARD SPECIFICATIONS SECTION 86 AND STANDARD PLANS
(DATE JULY 2002).
2. LOCATION OF ALL UNDERGROUND FACILITIES ARE APPROXIMATE. THE CONTRACTOR
SHALL POTHOLE TO DETERMINE THE EXACT LOCATIONS AND VERIFY ALL CONDITIONS ON
THE JOB SITE. HAND DIG FOUNDATINS UNTIL CLEAR OF ANY OBSTRUCTIONS. PHONE
UNDERGROUND SERVICE ALERT AT (800) 227-2600, TWO (2) WORKING DAYS BEFORE
DIGGING.
3. ALL PULLBOXES SHALL BE No. 6 AND CONDUIT SHALL BE 2" RIGID METAL UNLESS
OTHERWISE SHOWN.
4. CONTRACTOR SHALL MAKE APPLICATION FOR ELECTRIC SERVICE AND SCHEDULING WITH
SOUTHERN CALIFORNIA EDISON COMPANY WELL IN ADVANCE OF NEED.
5. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR EXACT EQUIPMENT
LOCATIONS PRIOR TO FINAL PLACEMENT. SEE ES -4C FOR POLE LOCATION DETAIL.
6. ALL REQUIRED CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF
FONTANA ENGINEERING DIVISION PRIOR TO COMMENCEMENT OF WORK.
7. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS, AND
SIDEWALK AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE ENGINEER.
8. CONTROLLER CABINET SHALL NOT BE SUBJECTED TO WATER FROM SPRINKLERS.
MODIFY SPRINKERS SYSTEMS IF NECESSARY.
MEYER CANYON
8
EDISON SERVICE 1
FEED POINT
INSTALL 2" C.,
EX. R/W WITH 2 #6(SIG.).
0
IDA 27'
3
E - - F_-
MAST -ARM MOUNTING
CLAMP FOR OPTICAL DETECTOR
BARRIER
PHASE
DIAGRAM
STANDARD
MASTARMS
FUTURE
_
M -
PHASE 1
PHASE 2
PHASE 3
PHASE 4
REMARKS
C
TYPE
FUTURE
SIG.
LUM.
PHASE 5
PHASE 6
PHASE 7
PHASE 8
W
Z
W
Q
P48 STA 14+43
SEE SIC PLAN
IX i
EX. C/G '
9 4
SD --- SD
INSTALL 2" C., X334 11
WITH 4 #10(LUM.). 9
fIN 160' TO
X -WALK
W
EX. C
11 �
i
i�
d-
11
W
R26(
S I
in
EX. S/W
EX. R/W
GENERAL NOTES (CONT.):
g_ THE ALIGNMENT OF INTERCONNECT DUCTS SHALL BE AS STRAIGHT AS POSSIBLE.
HOWEVER, WHEN CHANGES IN ALIGNMENT ARE NECESSARY, SWEEPS SHALL HAVE
MINIMUM RADIUS OF 10 FEET.
10. ALL VEHICLE INDICATIONS SHALL BE 12" AND HAVE L.E.D. SIGNAL MODULES. ALL
PEDESTRIAN HEADS SHALL HAVE L.E.D. PEDESTRIAN MODULES.
11. ANY EXISTING TRAFFIC SIGNALS AND LIGHTING SHALL REMAIN IN OPERATION UNTIL
REPLACED WITH NEW CONSTRUCTION.
12. CONTRACTOR TO FURNISH ALL EQUIPMENT, MATERIALS, AND HARDWARE TO CONSTRUCT
THE TRAFFIC SIGNAL AND LIGHTING AS SHOWN ON THE PLANS, EXCEPT AS NOTED CITY
FURNISHED OR LISTED AS CITY PROVIDED IN THE SPECIAL PROVISIONS.
13. CONTRACTOR SHALL REFER TO THE CITY TRAFFIC ENGINEER IN THE EVENT OF A
CONFLICT OR POTENTIAL CONFLICT WITH THESE PLANS AND,OR SPECIFICATIONS FOR
THIS PROJECT.
14. WHERE TRAFFIC SIGNAL STREET CROSSING CONDUIT ARE NOT INSTALLED USING THE
BORING METHOD, TRENCH REPAIRS SHALL BE PER DETAIL ON THIS SHEET, AND SPECIAL
PROVISIONS, SECTION E.
15. TRAFFIC SIGN DIMENSIONS, COLOR, AND LETTERING SHALL CONFORM TO THE LATEST
CALTRANS SIGN SPECIFICATIONS SHEETS. SIGN CODES SHOWN HEREON ARE TO
CONFORM TO CALTRANS SPECIFICATION SHEET CODES. TRAFFIC SIGN SIZE SHALL BE
STANDARD UNLESS OTHERWISE SHOWN ON THE PLANS.
O
ON
cc
W
V
08
IN- J
47'
O Y
J
a
LO
N X
I
I
t —
L
120
7'
S -t
18'/—5
[ 12'
O
"00 �O it '
02
- -�
04
Spm
I
� 6
I 3�: 106 06
01
CD 12' 18' Y
N
Og 5
4J V V a
(n O 1
IW
19, 6'
1 O
O O (n
+
X
W
I
P48 STA 11+60
SEE SIC PLAN
47 47
1 .0.
T0
U U
X � X
w I I w
O Y
<
LO
N X
(D
I ®.
20 10 .0 20 40 60
4
0_
X
w
o POLE SCHEDULE
o
STANDARD
MASTARMS
LUMINAIRE
PED PUSH BT.
SIGNAL MOUNTING
S.N.S.
PLACEMENT
REMARKS
C
TYPE
HT.
SIG.
LUM.
H.P.S.V.
TYPE
PHASE
QUAD
VEHICLE
POLE
PED.
MESSAGE
A
B
8
1
1 A
10
—
—
—
B
4
N
—
TV -1—T
SP-1—CS
—
25'
4'
1
2
26A-4-80
35'
30'
15'
250W
B
2
W
MAS
SV -1—T
SP-1—CS
Cherry Ave
23'
6'
1, 2, 3
3
1A
10'
—
—
—
B
2
W
—
TV -1
SP-1—CS
—
21
6'
1
4
29A-5-80
35
55
15
250W
B
8
S
MAS, MAS, MAS
SV -1—T
SP-1—CS
Meyer Cyn Dr
24
4'
1, 3, F=18'
5
1A
10
—
—
—
B
8
S
—
TV -1—T
SP-1—CS
—
8'
7'
1
6
26A-4-80
35'
25'
15'
250W
B
6
E
MAS
SV -1—T
SP-1—CS
Cherry Ave
9'
7'
1, 2, 3
7
1A
10'
—
—
—
B
6
E
—
TV -1—T
SP-1—CS
—
9'
5.5'
1
8
29A-5-80
35
55'
15'
1 250W
B
4
N
MAS, MAS MAS
SV -1—T
SP-1—CS
Meyer Cyn Dr
7'
1 10
1 1, 3, F=18'
e ALL EQUIPMENT IS NEW.
LEGEND:
►� - IMAGE SENSOR UNIT.
�-� - UNI -DIRECTIONAL, SINGLE CHANNEL OPTICAL DETECTOR.
- ADVANCE VIDEO DETECTION ZONE.
33 50' C.R.
(BY OTHERS)
E F
I
I R26(S)
m
W
SD
DRIVE
EX. C/G
w
— 4- SD
"f b U l
X -WALK
1. INSTALL 2" ADA PED. PUSH BUTTON.
AWG.
2. MODIFY SIGNAL MASTARM BUTT PLATE
Q
TO FIT STANDARD TYPE 26A POLE
INSTALL CITY FURNISHED TYPE 90 CONTROLLER EQUIPMENT PACKAGE INCLUDING TYPE "R" CABINET,
MOUNTING.
3. CONTRACTOR FURNISHED S.N.S. TO BE
OSOLO
1
INSTALLED ON A SHAFT MOUNTED MAST
AND FOUNDATION SHALL BE INSTALLED PER CITY STANDARD DRAWING 4004. CONTRACTOR SHALL
ARM SUPPLIED BY THE CITY. ARM TO BE
INSTALLED AT 24' ABOVE BASE.
_Q
POLE
Q
2
J
4
5
6
Q
8
9
♦ CONDUCTOR TABLE
AWG.
CIRCUIT OR
RUNS
El
INSTALL CITY FURNISHED TYPE 90 CONTROLLER EQUIPMENT PACKAGE INCLUDING TYPE "R" CABINET,
PRO VIDEO DETECTION, BATTERY BACKUP, AND APPURTENANT EQUIPMENT. CONTROLLER CABINET
OSOLO
1
AND FOUNDATION SHALL BE INSTALLED PER CITY STANDARD DRAWING 4004. CONTRACTOR SHALL
FURNISH AND INSTALL ANY ADDITIONAL ELECTRONIC EQUIPMENT REQUIRED TO PROVIDE THE SIGNAL
OPERATION AS SHOWN ON THE PLAN.
POLE
1
2
Al
4
5
6
7
8
9
1
JA
F4]
POLE
ElINSTALL
CITY FURNISHED UNI -DIRECTIONAL, SINGLE CHANNEL OPTICOM DETECTOR (MODEL 711 OR EQUAL)
PER DETAIL ON THIS SHEET AND AS DIRECTED BY THE ENGINEER.
E6-1.5"
SCHEDULE 40 HDPE CONDUITS WITH ONE (1) INTERCONNECT CABLE (6PR#19) IN THE ORANGE
CONDUIT. SEE SIGNAL INTERCONNECT PLAN FOR INSTALLATION.
J
❑7
REMOVE STREET LIGHT POLE #4131419E (BY SCE).
8❑
2" CONDUIT WITH 6PR#19 SIGNAL INTERCONNECT CABLE. SEE SIGNAL INTERCONNECT PLAN FOR
INSTALLATION.
g❑
CONSTRUCT 4" THICK PCC PAD ON 90% COMPACTED NATIVE.
10
M
POLE
11
INSTALL SIGN ON MAST ARM. r
o
POLE 30
1/1
1/1
1/1
1/1
1/1
U
z
POLE
POLE
i
N
POLE O
1/1
1/1
Of
O
0
POLE O7
1/1
1/1
1/1
0
oz
POLE 80
1/1
1/1
1/1
1/1
'`j
TOTAL
1/1
2/2
3/3
4/4
5/5
5/5
5/5
3/3
3/3
2/2
1/1
10
ILUMINAIRE
1
1 2
1 2
1 2
1 2
1
1 1
1
1
1 2
12
VIDEO
DET.
VIDEO CABLE
1 1
1
2
24
4
1
1
OPTICOM CABLE
1
1
2
2.
4
4
1
1
CONDUIT SIZE
1 2"
1 3"
1 3'
4'
1 4" 1
4" 1
4" 1
3"
4
1
3
2
- ALL CONDUIT AND CONDUCTORS ARE NEW.
50' C.R. EX. R/W
3 (BY OTHERS)
O
/ Curb/Berm flow lir
CONSTRUCTION NOTES: or edge of should(
>A,
NOTE:
SEE SPECIAL PROVISIONS FOR ANY CITY SUPPLIED EQUIPMENT AND/OR MATERIALS.
/
El
INSTALL CITY FURNISHED TYPE 90 CONTROLLER EQUIPMENT PACKAGE INCLUDING TYPE "R" CABINET,
PRO VIDEO DETECTION, BATTERY BACKUP, AND APPURTENANT EQUIPMENT. CONTROLLER CABINET
OSOLO
1
AND FOUNDATION SHALL BE INSTALLED PER CITY STANDARD DRAWING 4004. CONTRACTOR SHALL
FURNISH AND INSTALL ANY ADDITIONAL ELECTRONIC EQUIPMENT REQUIRED TO PROVIDE THE SIGNAL
OPERATION AS SHOWN ON THE PLAN.
INSTALL TYPE III -BF SERVICE EQUIPMENT ENCLOSURE PER CITY OF FONTANA AND SOUTHERN CALIFORNIA
10
EDISON COMPANY REQUIREMENTS.
F3]
FURNISH AND INSTALL 3" PVC CONDUIT WITH 1/4" POLY PULL ROPE PER SCE REQUIREMENTS.
COORDINATE SERVICE WITH SCE (DAVID QUEZADA 909-357-6240 AND CANERA MILES 909-357-6505).
F4]
INSTALL CITY FURNISHED IMAGE SENSOR UNIT AS DIRECTED BY THE ENGINEER.
ElINSTALL
CITY FURNISHED UNI -DIRECTIONAL, SINGLE CHANNEL OPTICOM DETECTOR (MODEL 711 OR EQUAL)
PER DETAIL ON THIS SHEET AND AS DIRECTED BY THE ENGINEER.
E6-1.5"
SCHEDULE 40 HDPE CONDUITS WITH ONE (1) INTERCONNECT CABLE (6PR#19) IN THE ORANGE
CONDUIT. SEE SIGNAL INTERCONNECT PLAN FOR INSTALLATION.
❑7
REMOVE STREET LIGHT POLE #4131419E (BY SCE).
8❑
2" CONDUIT WITH 6PR#19 SIGNAL INTERCONNECT CABLE. SEE SIGNAL INTERCONNECT PLAN FOR
INSTALLATION.
g❑
CONSTRUCT 4" THICK PCC PAD ON 90% COMPACTED NATIVE.
10
REMOVE TREES BY OTHERS.
11
INSTALL SIGN ON MAST ARM. r
Q
r�
vJ
U
4-
Q
Q
Q
U
Qt�
U �I
W
W
0
Q
I�
Q
TW
z
j
S: \traffic\Reggie\Plans\Cherry Signal s\Cherry—M eyer Cyn TS.dwg