1 GENERAL - ALL WORK SHALL BE IN ACCORDANCE WITH APPLICABLE CITY CODES; AND THESE PLANS. THE
CONTRACTOR SHALL APPLY FOR ALL PERMITS AND PAY FOR SAME.
A. THE CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS SHOWN ON THE PLANS AT THE SITE
PRIOR TO COMMENCMENT OF ANY WORK UNDER THIS CONTRACT.
B. THE CONTRACTOR SHALL CARRY ALL WORKER'S COMPENSATION, PUBLIC LIABILITY AND PROPERTY
DAMAGE INSURANCE, AS REQUIRED BY THE OWNER.
C. THE CONTRACTOR SHALL APPLY FOR ALL PERMITS AND PAY FOR SAME. ALL IRRIGATION WORK SHALL
HAVE RECOMMENDED APPROVAL BY THE LANDSCAPE ARCHITECT PRIOR TO BEGINNING ANY
GROUNDCOVER PLANTING WORK.
p_ THE OWNER'S SUPERINTENDENT AND THE LANDSCAPE ARCHITECT WILL REVIEW THE PLANTING WORK.
PRIOR TO STARTING WORK, THE CONTRACTOR SHALL CONTACT THE LANDSCAPE ARCHITECT AND
COORDINATE ALL REVIEWS.
E. THE QUALITY OF WORKMANSHIP AND MATERIALS SHALL BE OF THE HIGHEST STANDARDS. COOPERATION
AND FLEXIBILITY IS EXPECTED OF THE CONTRACTOR TOWARD WORKING WITH THE OWNER/LANDSCAPE
ARCHITECT IN PRODUCING THE BEST POSSIBLE PRODUCT.
F. UPON COMPLETION OF EACH PHASE OF THE WORK, THE CONTRACTOR SHALL THOROUGHLY CLEAN THE
SITE OF ALL ACCUMULATED RUBBISH, DEBRIS, AND OTHER EXTRANEOUS MATERIAL.
2. SCOPE OF WORK - FURNISH ALL MATERIAL, LABOR, TRANSPORTATION. EQUIPMENT AND PROPERTY TO
COMPLETE THE LANDSCAPING OF THE PLANTING AREAS SHOWN ON THE DRAWINGS, OR REASONABLY IMPLIED
TO COMPLETE THE CONSTRUCTION. INCLUDED AS A PART OF THE WORK, BUT NOT NECESSARILY LIMITED BY IT,
ARE THE FOLLOWING ITEMS: FINE GRADING OF ALL PLANTING AREAS, PREPARATION OF ALL PLANTING AND
TREE HOLES, FURNISHING AND INSTALLATION OF ALL REQUIRED PLANTING BACKFILL MATERIALS, TREE
STAKES, MOW CURBS AND MISCELLANEOUS MATERIALS, FURNISHING AND INSTALLATION OF ALL PLANT
MATERIALS, PROVIDING MAINTENANCE THROUGHOUT THE SPECIFIED PERIOD, CLEAN-UP AND WEEDING OF ALL
LANDSCAPE AREAS, GUARANTEE OF ALL PLANT MATERIAL AND WORKMANSHIP FOR A PERIOD OF ONE YEAR
3. THE CONTRACTOR SHALL REMOVE ALL WEEDS, ROCKS OVER 1" DIAMETER, DEBRIS AND OTHER
EXTRANEOUS MATERIAL FROM THE JOB SITE IN A LEGAL MANNER PRIOR TO PROCEEDING WITH ANY WORK
UNDER THIS CONTRACT.
4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR FINISH GRADE, INCLUDING ANY IMPORT SOIL ADJUSTMENTS
TO EARTH BERMS. PROVIDE FINISH GRADE IN PLANTING AREAS 1% MINIMUM FLOW. FINISH GRADES SHALL
BE 2" BELOW ADJACENT WALKS, CURBS, DRIVEWAYS, ETC. IN GROUND COVER AREAS.
5. ALL TREES AND SHRUBS SHALL BE PLANTED PER THESE NOTES AND AS DETAILED. ALL PLANT MATERIAL
SHALL BE OF THE HIGHEST QUALITY AND LARGEST REASONABLE SIZE AVAILABLE FOR THE SPECIFIED
CONTAINER SIZE (WITHOUT BEING ROOT BOUND). SHRUB MATERIALS SHALL BE VIGOROUSLY GROWING,
HEALTHY PLANT MATERIAL, FULL AND BUSHY, OF HINES WHOLESALE NURSERY/MONROVIA NURSERY
COMPANY QUALITY, OR EQUAL. THE LANDSCAPE ARCHITECT WILL REVIEW ALL PLANT MATERIAL WHEN
SPOTTED FOR PLANTING, AND WILL NOT HESITATE TO REJECT ANY MATERIAL OF QUESTIONABLE QUALITY,
OR OF LESS THAN THE LARGEST REASONABLE SIZE MATERIAL AVAILABLE.
6. NO PLANT SUBSTITUTIONS ARE TO BE MADE WITHOUT THE WRITTEN CONSENT OF THE LANDSCAPE
ARCHITECT.
7. ALL GROUNDCOVER AS NOTED IN THE LEGEND SHALL BE ROOTED TIP CUTTINGS FROM FLATS AND SHALL BE
PLANTED IN STAGGERED ROWS CONTINUOUSLY UNDER ALL TREES AND SHRUBS IN THE AREAS AS
DESIGNATED ON THE PLANS AND AT THE SPACING INDICATED IN THE LEGEND. GROUNDCOVER SHALL BE
INSTALLED NO CLOSER THAN 112 THE ON CENTER SPACING AS INDICATED ON PLANS.
8. TO ALL NEW PLANTING AREAS (TURFGRASS, SHRUB AND GROUNDCOVER) ROTOTILL THE FOLLOWING
AMENDMENTS 4"-6" DEEP AND IRRIGATE THOROUGHLY: 200 LBS. OF GRO-POWER11000 S.F. 3 CU. YDS.
NITROGEN STABILIZED ORGANIC AMENDMENT/1000 S.F.
9. AFTER EARTHWORK, INSTALLATION OF IRRIGATION SYSTEM, AND SOIL PREPARATION, BUT PRIOR TO
PLANTING, PERFORM WEED ABATEMENT PROGRAM TO ALL PLANTING AREAS AS FOLLOWS: TO ALL
PLANTING AREAS ALLOW A WEEK MIN. FOR WEED ABATEMENT PROCESS
A. APPLY SULFATE OF AMMONIA AT THE RATE OF 5 LBS. PER 1,000 SQ. FT. TO ALL AREAS TO BE PLANTED.
B. KEEP AREA MOIST BY REGULAR IRRIGATIONS FOR A PERIOD OF TWO (2) WEEKS TO GERMINATE EXISTING
WEED SEEDS.
C. AT THE END OF TWO WEEKS, APPLY "ROUND -UP" OR EQUAL SYSTEMIC HERBICIDE. DO NOT IRRIGATE
WITH -IN SIX (6) HOURS AFTER APPLICATION. HERBICIDE SHALL BE APPLIED BY AN INDIVIDUAL WITH THE
PROPER LICENSE. REFER TO MFG. SPECIFICATIONS FOR PERIOD OF TIME REQUIRED FROM TIME OF
APPLICATION TO TIME IMPLEMENTING PLANTING. AFTER COMPLETE WEED KILL, REMOVE ALL WEED
RESIDUE AND TOP GROWTH AND DISPOSE OF IN A LEGAL MANNER. NOTE: ALTERNATE METHODS OF WEED
KILL FOR ITEM'C' MAY BE VAPAM OR METHYL BROMIDE APPLIED PER LICENSED HERBICIDE AGENCY AND
SPECIFICATIONS.
D. REPEAT STEPS A,B & C.
10. ALL GROUNDCOVERS, SHRUB AREAS AND BARE SOIL AREAS (EXCEPT AREAS TO RECEIVE HYDROSEED OR
TURFGRASS) ARE TO BE TREATED WITH A PRE -EMERGENT CHEMICAL (SUBJECT TO APPROVAL BY
LANDSCAPE ARCHITECT PRIOR TO APPLICATION). CHEMICALS ARE TO BE APPLIED BY A LICENSED PEST
CONTROL AGENT AT THE RATES RECOMMENDED BY THE MANUFACTURER. THIS TREATMENT SHALL BE
APPLIED AT THE FOLLOWING TIMES DURING THE CONTRACT:
A) AT THE BEGINNING OF PLANT ESTABLISHMENT PERIOD AND
B) AT THE END OF THE PLANT ESTABLISHMENT PERIOD.(IF IT EXCEEDS 90DAYS)
NO CHEMICALS SHALL BE APPLIED OTHER THAN IN THE PRESENCE OF THE INSPECTOR.
11.BACKFILL MIX FOR TREES AND SHRUBS SHALL BE AS FOLLOWS:
- 6 PARTS BY VOLUME NATIVE ON-SITE SOIL
4 PARTS BY VOLUME NITROLIZED FIR SHAVINGS
- 18 LBS OF GRO-POWER PER CUJYD. OF MIX
- 2 LBS. OF IRON SULFATES PER CU./YD OF MIX
- GRO-POWER PLANTING TABLETS FOR EXTENDED FEEDING/SOIL CONDITIONING. SEE TREE AND SHRUB
PLANTING DETAILS FOR PLACEMENT AND QUANTITIES.
THE ABOVE SHOULD BE THOROUGHLY BLENDED PRIOR TO USE FOR BACKFILL PURPOSES. THE IRON
SULFATE SHOULD NOT CONTACT CEMENT SURFACES SINCE SEVERE STAINING COULD OCCUR.
12. MAINTENANCE PERIOD - THE MAINTENANCE PERIOD SHALL COMMENCE UPON THE OWNER'S AND THE
LANDSCAPE ARCHITECT'S WRITTEN RECOMMENDED APPROVAL OF ALL PHASES OF PLANTING INSTALLATION
AND SHALL BE FOR NINETY (90) CONTINUOUS CALENDAR DAYS.
13. MAINTENANCE PROCEDURES - THE GENERAL CARE AND MAINTENANCE OF ALL AREAS SHALL CONSIST OF
PROPER WATERING, FERTILIZATION, WEEDING, CLEAN-UP, AND AS FOLLOWS:
A. CULTIVATE AND WEED AT LESS THAN TEN (10) WORKING DAY INTERVALS.
B. APPROXIMATELY 30 DAYS AFTER INITIAL PLANTING, APPLY 25 LBS. OF GRO-POWER PER 1,000 SQ. FT. AND
IRRIGATE THOROUGHLY. THE SECOND APPLICATION USING THE ABOVE PRODUCT AT THE SAME RATE SHALL
BE APPLIED IN ANOTHER 60 DAYS OR JUST BEFORE THE MAINTENANCE PERIOD ENDS.
C. CONTRACTOR SHALL MAINTAIN THE IRRIGATION SYSTEMS IN A LIKE NEW, OPERATING CONDITION,
ADJUSTING HEAD HEIGHTS, THROW AND SPRAY ARCS AS NECESSARY. THE CONTRACTOR IS RESPONSIBLE
FOR PROPER WATERING OF ALL PLANTING AREAS, AND SHALL REPLACE ANY MATERIAL DAMAGED DUE TO
IMPROPER MOISTURE.
D. ANY CONCENTRATED DEVELOPMENT OF WEED GROWTH THAT MAY APPEAR IN PLANTING AREAS DURING
MAINTENANCE PERIOD SHALL BE REMOVED AT TEN (10) DAY INTERVALS. THE CONTRACTOR MAY ELECT TO
REMOVE SUCH CONCENTRATIONS OF WEEDS MANUALLY OR BY AN APPROVED HERBICIDE PROGRAM.
E. MOW AND EDGE TURFGRASS AREAS WEEKLY.
F. DURING THE COURSE OF THE MAINTENANCE WORK, THE CONTRACTORSHALL REMOVE SURPLUS MATERIALS
AND DEBRIS FROM THE SITE AND SHALL KEEP THE PREMISES IN A NEAT AND CLEAN CONDITION AT ALL
TIMES.
G. DURING THE MAINTENANCE PERIOD, THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING
ADEQUATE PROTECTION FOR ALL PLANTING AREAS. ANY DAMAGED AREAS SHALL BE REPAIRED AT THE
CONTRACTOR'S EXPENSE.
14. ITEMS 8. 11 & 13B ARE FOR BID PURPOSES ONLY. CONTRACTOR SHALL SUBMIT SOIL SAMPLE TO SOIL &
PLANT LAB, P.O. BOX 6566 ORANGE, CA 92613 (714-282-8777). CONTRACTOR SHALL SUBMIT TEST RESULTS
AND LAB RECOMMENDATIONS TO L.A. FOR REVIEW. CONTRACTOR SHALL AMEND SOIL, PREPARE BACKFILL &
FERTILIZER PER TEST RESULTS, OWNER SHALL PAY FOR WHOLESALE COST OF MATERIALS ONLY SHOULD
TEST RESULTS REQUIRE ADDITIONAL MATERIALS BEYOND BID SPECIFICATION.
r•
t.. # w3
OWNER f DEVELOPER:
NEW W
HOME
369 SAN MIGUEL DRIVE, SUITE 375-A
NEWPORT BEACH, CA 92660
(949) 640-6420 * FAX: (949) 640-6484
z
EO 18"
+1 ,
APPROVED BY:
. M11is rl:#TY ENGINEER DATE:
Rolf" Mt.1i MOLE
M I11�� >r GfiAWN BY: TIMOTHY F,hSGt
ate. - -
t ff Chr,'•A DATE OF LAST RE ION:
TURF GRASS
KINGLE NAIL
REE TRUNK
`INCH TIF
DO NOT TWIST)
- . __'VAILINO WIND
DIRECTION
10' TALL
-t" DIA LODGEPOLE PINE TREE
STARE COPPER NAPTHENATE
TREATED AND DRIVEN IN GROUND
TO 2FT. MINI. DEPTH, 2 REO"D
OCINCIt TIF' (4) REQ'D
-A-913O 2 GUARD IN TURF AREAS
PREPARED SACKFIL.L. MIX.
SEE SPECIFICATIONS
3- !91101-! WATER BA.SfN.
AT TIME OF PL.ANT11,4C:
FIh,N1SH IGR&DE
-ACRIFORm TABLETS TO BE
AMEID PER MFG, RECOV OS,
CITY OF FONTANA
TREE STAKING
STD. PLAN NO. 531 SF T. 1 OF1
TURFGRASS SHALL BE PLANTED BY SOD LAYING, AS INDICATED PER PLAN. TURF
SOD SHALL BE AS SPECIFIED ON PLANTING LEGEND AND PLAN.
SODDING: IRRIGATE AREAS TO BE SODDED PRIOR TO INSTALLATION; MOISTURE
SHALL BE UNIFORMLY PRESENT TO A DEPTH OF 2 SOD SHALL BE INSTALLED
WITHIN ONE DAY OF DELIVERY, ROLLS SHALL BE PLACED IN SHADED AREA PRIOR
TO INSTALLATION. SOD SHALL CONFORM TO ALL LAWN SHAPES AS DESIGNATED
PER PLAN, AND SHALL BE INSTALLED IN SUCH A MANNER AS TO VISUALLY
ELIMINATE ALL JOINTS AND EDGES OF SOD STRIPS. FOLLOWING INSTALLATION,
IRRIGATE TURF AREAS THOROUGHLY TO PROVIDE EVEN MOISTURE PENETRA-
TION. ROLL ALL SOD PRIOR TO BEGINNING INSTALLATION WITHIN TWO (2)
HOURS; PRIOR TO BEGINNING IRRIGATION, SOD SHALL BE UNIFORMLY SMOOTH
IN APPEARANCE AND SHALL BE FLUSH WITH THE FINISHED GRADE OF ALL
WALKS, CURBS, ETC.
MAINTENANCE: THREE WEEKS FOLLOWING INSTALLATION OF TURFGRASS,
AREAS SHALL BE MOWED REGULARLY AT INTERVALS NOT EXCEEDING ONCE PER
WEEK, MOWING SHALL BE DONE WITH SHARP, WELL ADJUSTED MOWER'S OR
CUT MORE THAN HALF THE EXISTING TOP GROWTH IN ONE MOWING. MOWING
HEIGHTS SHALL BE 2" TO 2-1/2", DURING HOT WEATHER SEASONS NEVER LESS
THAN 2", AND 2" TO 2-1/2" DURING COOL WEATHER SEASONS. TURFGRASS
AREAS THAT DO NOT PROPERLY GROW SHALL BE RESODDED AS NECESSARY. AT
THE TERMINATION OF THE MAINTENANCE PERIOD ALL TURFGRASS AREAS SHALL
BE COMPLETELY COVERED, LEAVING NO BARREN SPOTS LARGER THAN THREE
INCHES X THREE INCHES.
BENCHMARK.:
CALTRANS BENCHMARK NO. 8-17
BRASS CAP IN CONCRETE S.C.E. TOWER LEG,
343' N/O HIGHLAND AVE., 0.2 MI. W-/0 SAN
SEVAINE RD., IN SOUTH CONCRETE BASE OF
S.C.E. TOKR 19.5; 2.65 MI. W. ALONG
HIGHLAND AVE. FROM SIERRA AVE.
MARK BY DATE
ELEV.= 1428.6090 ENGINEER
C
PERMAVENT BASIN
I 1/2"X MIN. ROC
eX TtiF WIDTH OF
P.1ODLE AND SETT_
PRIOR TO PIA :EVENT OF SHRV9
IW^=1155
25,25
1213, /01
KRUA'KENT BASIN
Em7w.
SLOPE
APPROVED BY:
CITY ENGINEER DATE_
Rdf BE R T W.WMo E
DRAWN 8Y: 1EMCTH'1' 95TEVT
DATE OF LAST REY15IC ; -
Tt
, �=E
I 11/2'X tutu, ROOT" -L 0CPTHT
-+
2x HIC W011111 or RoaTBALL
PUDDLE ANO SETTLE a4_15PiL --
MOR 70 PLACEOI:NT CIE SHrRUS
jxt ftssr
tip
+ E»'.
JIL
In
Or asps
CITY Of FONTANA
SHRUD PLANTING
STD. PLAN NCS, 535 � SIiT, t OF1
-TSR t;t 4oFAX CUT
SLCPE 0 PUNT PIT
# rERT8,17ER TABLETS
' (SET' SPECS.)
APPRG'I M BY:
CITY ENGINEER DATE:
ROBERT w. VVMt.r-
DRAM N BY: 71141,9THY RA5TEDT
DATE Of LAST REYiSJON: I
APPR. DATE
COUNTY
�pNDSC,q'°F
c�
* .1131 "Mr,
He a Date
sT �Q
�Tf 4F CPQ -10
ROOTBALL
aACK I'ILL MIX_ (S£E SPECS,
CITY OF FONTANA
5HRUD ON SLOPE
For a simple formula to determine the quantity of panels required for a Linear application use:
Linear Style Planting with DeepRoot Barriers
Tree Canopy at Maturity + 2' (61cm) = Length of Barrier per
Side.
Determine the correct number of panels to be used. D. Next place the barrier in the trench with the vertical ribs
For One Side of Tree
Depending upon the actual planting plan and the number of facing toward the tree and align in a straight fashion. It is
Dee Number of Feet of
Optional Lkt'tM ww
trees involved the length of linear barrier will vary, but as a helpful to place the barrier against the hardscape. Use the
Can" at Y Linear 801111611
12 or LB t8)
Sorrier (UBin
number of PIs
general rule of thumb take the anticipated mature canopy hardscape as a guide and backfill against the barriers to
12' 3.6m) Diameter +2' 61cm = 14' 4.2m
7 Panels
diameter of the tree and add 2 feet (61cm). This will be the promote a clean smooth fit to the hardscape. Be sure to
18' 5.5m Diameter +2' 61cm= 20' 6.1 m
10 Panels
number of feet necessary for a Linear style planting keep the barrier's double top edge at least 1/2' (13mm)
24' 7.3m Diameter +2' 61cm = 26' 7.9m
13 Panels
application. (See chart below.) above grade to ensure roots do not grow over the top.
A Choose the barrier that best suits the application. Generally E. Plant the tree(s). The Linear style offers a more expansive
and install in one continuous line of up
if a sidewalk, patio or driveway is to be protected, 18" rooting growth area, however adverse soil and drainage
to:
46cm) (LB 18-2) is sufficient depth with 12" (30cm) conditions may exist in the actual planting area. Take steps
�LB
LB 12-2 80:(24 m) per Carton
12-2) as an alternate choice for non-aggressive, deeper to ensure healthy growth of the tree at planting. Consult with
LB 18-2 52 16 m per Carton
rooting trees. However for curb and gutter protection or more a local Arborist for planting tips and recommendations.
Line can be separated at any two foot
agressive roots 24" (61cm) (UB 24-2) is generally the better
Sidewalk
interval
choice. F. If the tree(s) will be subject to maintenance work such as
lawn mowing or weed trimming we strongly recommend the
B. Dig the trench to the depth based upon the particular installation of ArborGard+ Tree Trunk Protectors which is
BERM TO FORM
barrier chosen. placed around the base of young trees to protect them from
TER BA STN
damage by weed trimmers, lawn mowers and small rodents.
C. Install the barrier. When using DeepRoot Linear Barriers
simply pull the appropriate number of panels out of the box For additional information please consult the 16 page
(they come preassembled) and separate the joiner at the DeepRoot Product Selection and Installation Guidelines.
ITILIZER TABLETS
correct length. When installing DeepRoot Universal Barriers in a
linear fashion you will need to join the appropriate number of For information regarding distributors please call: 1 800 ILV
panels together. ROOT (458.7668). For help with difficult drainage or other
OOT13ALL
difficult installation questions please call DeepRoot Technical
Support at: 1 800 ROOT TEK (766.8835).
RACK€ILL MIX,
CITY Of FONTANA
SHRUD PLANTING
STD. PLAN NCS, 535 � SIiT, t OF1
-TSR t;t 4oFAX CUT
SLCPE 0 PUNT PIT
# rERT8,17ER TABLETS
' (SET' SPECS.)
APPRG'I M BY:
CITY ENGINEER DATE:
ROBERT w. VVMt.r-
DRAM N BY: 71141,9THY RA5TEDT
DATE Of LAST REYiSJON: I
APPR. DATE
COUNTY
�pNDSC,q'°F
c�
* .1131 "Mr,
He a Date
sT �Q
�Tf 4F CPQ -10
ROOTBALL
aACK I'ILL MIX_ (S£E SPECS,
CITY OF FONTANA
5HRUD ON SLOPE
For a simple formula to determine the quantity of panels required for a Linear application use:
Estimated Diameter of the
Tree Canopy at Maturity + 2' (61cm) = Length of Barrier per
Side.
As little as one side of the tree may
For One Side of Tree
need barrier for root direction asEqftAilW
there may no hardscapeelse-
Dee Number of Feet of
Optional Lkt'tM ww
where requiring protectionn..(LB
Can" at Y Linear 801111611
12 or LB t8)
Sorrier (UBin
number of PIs
Note: Linear Barriers (LB 12-2 and LB
12' 3.6m) Diameter +2' 61cm = 14' 4.2m
7 Panels
18-2) are packaged in 2' (61cm) long
18' 5.5m Diameter +2' 61cm= 20' 6.1 m
10 Panels
panels with pre -attached flexible
24' 7.3m Diameter +2' 61cm = 26' 7.9m
13 Panels
joiners ready to pull out of the carton
and install in one continuous line of up
DeepRoot LB 12-2, LB 18-2 or US 24-2
to:
LB 12-2 80:(24 m) per Carton
LB 18-2 52 16 m per Carton
Line can be separated at any two foot
Sidewalk
interval
Sidewalk
TO BE 24" DEEP ON ALL SIC)ES
A IDEEFIROOT BARRIER
PLANT SPACING A$ PER PLAN
PLANT SPACING AS PER PLAN
PREPARE BEE) AS PER
PLANTING NOTES
STD. PLAN NQ,536 SHT. 10 F1I J-1
JM � M► AYE
raUATr
Mavt
tafs~ Ott
wk � ar,-rear
,aur AMI Mr-aan
DATE:
PLAN VIEW
SI-4F2UB / Cx.G SF'AGINCx
CITY OF FONTANA, CALIFORNIA
PUBLIC WORKS DEPARTMENT
DRAWN BY- PARKWAY LANDSCAPE PLAN SCALE:
JE FOR 1" = 30'-0"
DESIGNED BY. TRACT 7 DATE:
JE LA"N E NOV. 17, 2003
CHECKED BY APPROVED BY. _ mss, DWG. NO.
CITY ENGINEER: ARDO SANDOVAL. R.C.E. 51152 #3484
SHEET
g OF g