HomeMy WebLinkAbout3464-14
12-
7r GO' 2 -
GO'
45'
I 1+31.00
G G" PALM TREE
1 1+29.20 8
(54.85TC)(54. 18FL)
END CURB * GUTTER
MEET EXISTING 7
ti\
I I 0+95.20 7
BEGIN CURB GUTTER
(54.30TC)(53.G4FL) 2.5'
AAFFT FYI -,THAI(_
10+43.80
J EXISTING PP #2007343E
W/ GUY WI RE
w
_O Q' x
`ORANG
EXIST R/W
APN 0192-151-04 1 1
EDWARD & MICHELLE CINQUE 1 1
RETAIL STORE
oL J
LU LL-
r- �J-
L.5.
J
Q
. . 98 L.F.
� U �n L9 N
. . . . . . 98 S.F.
��> +
. . . . . 32 L.F.
p M W
. . . . . . .780 S.F.
LU
. . . . . . .98 L.F.
STREET IMPROV M NT PLANS
ORANGE WAY & SIERRA AVE.
APN 0192-151-24
ENRIQUE & LEONOR CASTRO
VACANT
0
gLU
JU
Oz
LU
`L APN 0192-151-25
T c� z
ENRIQUE & LEONOR CASTRO
U RETAIL STORE
I w '�
APN 0192-151-24
ENRIQUE & LEONOR CASTRO
VACANT
i
EXISTING PP #235G985E
DRIVEWAY REMOVAL
PARCEL MAP NO. 16116
AUGUST 2003
APN 0192-151-27
BARRY & JANET SMITH
RETAIL STORE
EXISTING RM/
22 -
mu
CONSTRUCTION NOTES/ESTIMATES OF QUANTITIES"
OI INSTALL 8" PCC CURB * GUTTER PER CITY STD. 1003 98 L.F.
O INSTALL 51DEWALK PER CITY STD. 1015 . . . . . 995 S.F.
O INSTALL UNDERSIDEWALK DRAIN PER CITY STD 124A (SIZE 1) _ _ _ _ _ _ _ _ _ _ _ _ _ _ 3 EA
O INSTALL G" CURB PER CITY 5TD NO. 1003 135 L.F.
O EXISTING PCC PAVEMENT TO BE REMOVED . . . . . . . . . . . . . . . . . . . . . . . . .780 S.F.
UG PROTECT IN PLACE .
L.5.
O7 5AWCUT EXISTING A.C. PAVEMENT . . . .
. . 98 L.F.
O8 REMOVE * REPLACE EXISTING A.C. PAVEMENT . . . . . . . . . . . . . . . .
. . . . . . 98 S.F.
O9 5AWCUT EXISTING PC PAVEMENT . . . .
. . . . . 32 L.F.
I 0 REMOVE EXISTING PCC PAVEMENT . . . . . . . . . . . . . . . . . . . . . .
. . . . . . .780 S.F.
I I REMOVE EXISTING CURB * GUTTER . . . . . . . . . . . . . . . . . . . . .
. . . . . . .98 L.F.
'ESTIMATE FOR BONDING PURPOSES ONLY, CONTRACTOR IS RESPONSIBLE
FOR OWN QUANTITIES.
NOTE: SEE SEP ST. LIGHT PLAN FOR
DWG. NO. 3464 -LT
INSTALLATION OF PROPOSED ST. LIGHTS
LEGEND
W - U W W W
EXISTING WATER TB TOP OF BERM
LL- Ln
w N TC TOP OF CURB
�v o FL FLOWLINE
�Q Ln Z + U- FG FINISH GRADE
NZ + z N HP HIGH POINT
p- O x 9 � N FS FINISH SURFACE
Uw N w (n MH MAN HOLE
U �- G 3 FH FI RE HYDRANT
02 EXISTING EXISTING BCR BEGINING OF CURB RETURN
R/W R/W ECR END OF CURB RETURN
x
1LU PCR POINT OF REVERSE CURVE
BC BEGINING OF CURB
GO' EC END OF CURB
45' 15' 4 I WER
WATERW W�/V
81 I
2.5' 8' 7' I I 2.5, 32 FIRE HYDRANT
2' G'
I
4
SCALE. 1"=20' EXISTING PAVEMENT 8 1 2 4 � 2 �ti1,q� % 2
2% 1
SURVEY BY KRUEPER ENGINEERING & - - ? XISTING PAVEMENT
M' 2' M , � 8 �7 E
7 TO REMAIN
ASSOC. DATED 12/27/02/-
0 20 40 60
r.
ARROW
MERRILL
RANDALL AVE
-/P
SAN BERNARDINO AVE
> �Q7
cn
U
VALLEY BLVD.
O w
LU
INTERSTATE 10
VICIN/TY MAP
THOMAS BROS. GUIDE
PAGE 604 REF. E-5
PROJECT
SITE
ROUTE
ORANGE
LU
Q
NTS
UTILITIES:
,!NATER COMPANY
FONTANA WATER CO.
8440 NUEVO AVENUE
FONTANA, CA 92334
(909) 822-2201
SEWAGE DISPOSAL
ON51TE SEPTIC
ELECTRIC
SOUTHERN CALIFORNIA ED15ON
287 TENNE55EE STREET
REDLAND5, CA 92373
(909 307-6747
GA5
THE GA5 COMPANY
1981 W. LUGONIA AVE.
REDLAND5, CA 92374-9720
(909) 335-7847
TELEPHONE
PACIFIC BELL TELEPHONE CO.
ATTN: JOEL DINNAUER
3939 E. CORONADO 5T.
ANAHEIM, CA 92807
(714) GGG-5534
CABLE
COMCA5T CABLE
1205 DUPONT 5T.
ONTARIO, CA 9176 1
(909) 390-3111
EXISTING D/W-j
APPROACH TO BE
REMOVED
TYPICAL X -SECTION
SIERRA AVENUE
NTS
T.I.= 10.0
BENCHMARK
BEING A BOLT LOCATED ON THE SIGNAL FOUNDATION AT THE
SOUTH EAST CORNER OF VALENCIA AND SIERRA.
ELEVATION. 1262.38
0 O REV.
TOLL FREE 1-800-227-2600
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
REVISION DESCRIPTION
EXISTING D/W
APPROACH TO BE
REMOVED
TYPICAL X -SECTION
ORANGE WAY
NTS
T.I.=9.0
PRIVATE ENGINEER'S NOTES TO CONTRACTOR
THE EXISTENCE AND LOCATION OF ANY UNDERGROUND UTILITY PIPES, CONDUITS
OR STRUCTURES SHOWN ON THESE PLANS ARE OBTAINED BY A SEARCH OF THE
AVAILABLE CITY/COUNTY RECORDS. THE CONTRACTOR 15 REQUIRED TO TAKE
PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN ON THESE
DRAWINGS. THE CONTRACTOR FURTHER ASSUMES ALL LIABILITY AND RESPONSIBILITY
FOR UTILITY PIPES, CONDUITS OR STRUCTURES SHOWN OR NOT SHOWN ON THESE
DRAWINGS.
CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE
RESPONSIBILITY FOR JOB SITE CONDITIONS DURING THE COURSE OF
CONSTRUCTION OF THI5 PROJECT, INCLUDING 5AFTEY OF ALL PERSONS AND
PROPERTY; THAT TH15 REQUIREMENT SHALL APPLY CONTINUOUSLY AND NOT BE
LIMITED TO NORMAL WORKING HOURS; AND THAT THE CONTRACTOR SHALL
DEFEND, INDEMNITY AND HOLD THE CITY, THE OWNER AND THE ENGINEER
HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN CONNECTION
WITH THE PERFORMANCE OF WORK ON THI5 PROJECT, EXCEPTING FOR LIABILITY
ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER.
GENERAL NOTES
1. ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE
CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN
BOOK"). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS
OTHERWISE NOTED.
2. WHEN A TECHNICAL CONFLICT 15 FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CANNOT BE
RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK," THE CONTRACTOR SHALL
IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION.
3. ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER.
4. CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT
DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION
SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC
RIGHT-OF-WAY WITHIN THE CITY LIMITS. CALL (909) 350-7G 10.
5. THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES
DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON -METRIC EDITION
UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER.
G. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER
TRAFFIC CONTROL DEVICES AT ALL TIMES.
7. THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5
FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY.
8. THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY
SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE
DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL
AL50 BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT.
9. NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A
SEPARATE PERMIT FOR THAT PURPOSE.
10. THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT
SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND
ELEVATION OF ANY EXISTING UTILITIES, AND THE EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO.
THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS
BEFORE EXCAVATION.
1 1. THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT
LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION,
DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRAN5. ALL UTILITY
COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES.
12. THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE
AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR
VALVE OPERATION AND WATER REQUIREMENTS.
13. CURVE DATA REFERS TO THE FACE OF CURB.
14. STATIONING REFERS TO THE CENTERLINE OF STREETS EXCEPT WHERE OTHERWISE NOTED.
15. ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR
TO CONSTRUCT THE WORK TO THE PLAN GRADES, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION.
I G. THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS
WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER.
17. REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT
TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR.
SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED.
THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION 50 THAT TIES TO
MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT.
18. THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A
MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS
AND EMERGENCY VEHICLES.
19. THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING
ADEQUATE WATERING, AT ALL TIMES.
20. ALL GRADING OPERATIONS SHALL BE DISCONTINUED WHEN SUSTAINED WIND VELOCITIES EXCEED 25 MILES
PER HOUR.
2 1. THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED
ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT
PRIOR WRITTEN APPROVAL.
22. NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR.
23. A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE
REQUIRED DENSITY SHALL REQUIRE RE -WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED
DENSITY 15 OBTAINED.
24. CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND 5WALES FROM UNDERMINING STREET
IMPROVEMENTS. UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY
NON-ERODEABLE 5WALE5 ENTERING OR LEAVING IMPROVEMENTS.
25. THE FINAL LOCATION AND WIDTH OF DRIVEWAY APPROACH APRONS SHALL BE APPROVED AT THE TIMES OF
CONSTRUCTION AND SHALL CONFORM TO THE CITY OF FONTANA STANDARD DETAILS.
2G. ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING
CONCRETE.
27. THE SEWER CONTRACTOR SHALL STAMP AND "5" IN THE FACE OF THE CURB AT THE LOCATION OF THE SEWER
LATERAL.
28. NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED
AND APPROVED.
29. ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS.
30. APPROVED 501L STERILANT 15 REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT.
3 1. PAVEMENT STRUCTURAL SECTIONS SHOWN ARE MINIMUM AND SUBJECT TO REVISION AND APPROVAL OF THE
CITY ENGINEER AS DETERMINED BY SOILS TESTS TAKEN AFTER COMPLETION OF ROUGH GRADING.
32. ACTUAL THICKNESS OF A.C. PAVEMENT AND/OR BASE COURSE MATERIAL FOR STRUCTURAL STREET SECTIONS
SHALL BE RECOMMENDED BY A GEOTECHNICAL REPORT AND SUBMITTED TO THE CITY OF FONTANA OF
APPROVAL UPON COMPLETION OF ROUGH GRADING.
33. ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE
PAVING CONTRACTOR UPON COMPLETION OF PAVING.
34. UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES,
AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER.
35. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALKS AFFECTED BY
THE CONSTRUCTION TO THE SATISFACTION OF THE CITY ENGINEER.
3G. A5-13UILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL
PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER.
BASIS OF BEARING
THE BEARINGS SHOWN ON THI5 PLAN ONE BASED ON THE BEARING
NORTH 89044'00" EAST FOR THE CENTERLINE OF ORANGE WAY
AS SHOWN ON THE ALTA SURVEY DATED 12/27/02 PREPARED BY
KRUEPER ENGINEERING * ASSOC.
DATE ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT Prepared Under The Supervision Of
THATCHER ENGINEERING
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL & ASSOCIATES
345 5TH STREET, SUITE B
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER, REDLANDS, CA. 92374
(909) 748-7777 FAX (909) 748-7776
THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO LAND BANNING GVIL ENGINEERING
LAN05CAPE ARCHITECTURE 5URVEYIN
BRING THEM INTO CONFORMANCE WITH CONDITIONS AND Melvin W. Thatcher, III R.C.E. 39964 Exp. Dec 31, zoos
Jot
STANDARDS IN EFFECT. o. ate repare e51gne rawn y Reference o. bee
56823 I/2G/04 M.W.T. CO 5G523R I/I
CITY OF FONTANA, CALIFORNIA
STREET IMPROVEMENT PLANS
DRAWN BY: ORANGE WAY * SIERRA AVE. SCALE:
DEs1GC Y:' PARG�L SAP 6 I I G DATES SHOWN
B. ASPJ 02019 VARIANCEI 02-07
CHECKED BY: /P ROVEDY. DRAWING NO.:
3464 '
9-x=1 MWT ITY MGIN R R.C.E. 51152