Loading...
HomeMy WebLinkAbout3459-1AD.WAY. LANDSCAPE STATIO 1���� X15.00 TO 1� t 9� 00 ( FAST SIDS 1 7R,US HEIGHTS CITY E n EnO NkTANA. CALIF0�� OPERATING. S I T S C A P � S ■ LandSCape 3195-B Airport Loop Dr., (949) 644-9370 1156 N. Mountain Ave. U and CA 91785 Architecture Costa Mesa, CA. 92626 FAX (714) 210-3140 & Planning Richard Polhamus, License # 2782 (909) 985�0971 GENERAL NOTES: City Required Notes: Inspections: 1. It is the Landscape Contractor's responsibility to contact the Engineering Division's Landscape Inspector 48 hours Prior to desired inspection of an item at (909)350-7627 2. Prior to the release of utilities or maintenance period commencement, the following inspections are required Pre -construction meeting Inspection of irrigation system in open trench condition (prior to backfill). Mainline pressure test @ 150 p.s.i. for a three (3) hour period. Irrigation coverage tests including initial and final tests. Finish grade prior to planting. Plant materials prior to planting. Planting, including street trees. Contact the Parks Planning and Landscape Development section Engineering Division, for species and final locations. Compliance with approved plans. Final Inspection. 3. The Owner's representative and Landscape Contractor shall be present at each inspection. The City of Fontana "Standard Landscape Specification Manual for Streetscapes" shall become a part of this document. Maintenance Guidelines Landscape shall be maintained in a neat, clean, weed free and healthy condition. This shall include but not be limited to: 1. Cultivation of planted beds at intervals not to exceed ten (10) days. 2. Regular mowing to maintain lawn height not to exceed two (2) inches (will vary with species). 3. Regular pruning of plants as necessary to control and direct growth 4. Scheduled maintenance of irrigation controller to assure proper application rate of water necessary for proper plant growth. Drip irrigation may require specialized landscape maintenance care. 5. Immediate replacement of irrigation materials as needed to maintain good working condition. 6. Fertilization on a regular schedule as recommended by the manufacturer to provide proper plant growth. 7. Immediate repair or replacement of irrigation materials as needed to maintain food working condition. 8. Stakes, guys, and ties on trees shall be checked regularly for correct function. Ties are to be adjusted to avoid abrasions or girdling of trunk or branches. 9. Upon completion of three (3) month (90 day) contract maintenance period, an inspection shall be made by the Community Development Department Engineering Division Landscape Inspection Staff. The landscape shall be maintained in accordance with these landscape maintenance standards. 10. The Developer/Builder is responsible to contact the City and schedule the maintenance inspection. SITESCAPES, INC. HEREBY CERTIFIES THAT THE DESIGN, DETAILS AND SPECIFICATIONS AS REPRESENTED HEREIN MEET PROFESSIONAL LANDSCAPE ARCHITECTURAL STANDARDS. SITESCAPES, INC. CANNOT GUARANTY THE QUALITY OF CONSTRUCTION, INSTALLATION OR MAINTENANCE OF IMPROVEMENTS AS DESIGNED AND/OR SPECIFIED HEREIN AND DISCLAIMS ANY FUTURE LIABILITY RESULTING IN PERSONAL INJURY AND/OR PROPERTY DAMAGE RESULTING FROM DEVIATIONS. STTESCAPES, INC. IS NOT RESPONSIBLE FOR THE AMOUNT OR FREQUENCY OF IRRIGATION WATER APPLIED TO THE PROJECT DURING CONSTRUCTION OR THEREAFTER. VICINITY MAP ,lp .�P Z CITY Q OF DUNCAN CYN RD. FONTANA N / w Q 1rliltc f '2- 0 0 WW 0 0 a Fn O Of SUMMIT AVENUE Q Y URTIS W AVE. x F_ Z U RIVERSIDE AVENUE W Z Lda CITY OF RIALTO F— U O J x I SIERRA LAKES (PARKWAY I J WALNUT AVE. PROJECT SITE SHEET KEY Ll/L5/L7/L8 w Of U w CURTIS AVEN SUMMIT AVENUE N.T.S. N.T.S. SHEET INDEX T- 1 TITLE SHEET L- 1 CONSTRUCTION PLAN L- 2 CONSTRUCTION DETAILS, NOTES &LEGEND L- 3 IRRIGATION DETAILS, NOTES &LEGEND L- 4 IRRIGATION DETAILS `L- 5 IRRIGATION PLAN L- 6 PLANTING DETAILS, NOTES &LEGEND L- 7 PLANTING PLAN (TREES & GROUNDCOVER) L- 8 PLANTING PLAN (SHRUBS &VINES) L- 9 SPECIFICATIONS Total square footage of landscape area =18,450 S.F. II e 61T9,-,uS �f1I TS Soal TK l(+rl CITY OF FONTANA LANDSCAPE PLANS DP"N If: LYTLE CREE OAD as sxowN DESIGNED Or: DAM CNECM W. APPRDVED B9: . DW. No.: 1 DA7E 1 CITY ENGINEER R.C.E. 51152 EXP. DATE 3459 1 ST SUBMITTAL 2ND SUBMITTAL 8/18/03 3RD SUBMITTAL 3/8/04 APPROVALS REVISIONS (2Z C09L D ptZAW 1IAGrS Ai Q g/ Zg for 1rliltc f '2- 0 0 D I 0 0 0 JOB NO. 03-017 2782°s �f� SIGNATURE DATE s 3 -IB -ey DATE �Q Of' C 6/11/03 11 3/9/2004