HomeMy WebLinkAbout3457-1-RACT 16210PROJECT TEAM
CIVIL E7-sINEr=R
CSL ENGINEERING, INC.
11ro51 Sterling Avenue, SuiteFONTANA, CALIFORNIA E
• F?iverside, CA 92503
• (909) 105-5122
LMD LANDSCAP-E PLANS
r -
LANDSCAPE ARCHITECT
RHA LANDSCAPE ARCHITECTS PLANNER6, INC.
3612 Mission inn Avenue
FRiverside, CA 92501
NEW WEST HOM.E
C 909) 181-1930
369 SAN
DRIVE, SUITE #350
NEWPORT BEACH, CA 92660
NOTES REVISIONS VICINITY MAP
CITY REQUiRED NOTES: PROJECT
Inspections: SITE � 30 FREEWAY
NO. REVISION FOR BY DATE APPROVED BY 30 POST LANE
i. It is the Landscape Contractor's responsibility to contact the Engineering Division's Landscape Qom° SOUTH HIGHLAND AV.
�Q >
Inspector 48 hours prior to desired inspection of an item at 0909) 350-162-1 or 350-1684. o`er Q Y G EAGER V. Q
2. Prior to release of utilities or maintenance period commencement the following inspections are W <QZ
required: WRIGHT- W >
w COURT
* Pre Construction fleeting BASELINE v -� �IOFFET AV. RD
* Inspection of irrigation system in open trench condition (prior to backfill). Mainline
pressure test 6 150 P.S.I. for a three (3) hour continuous period.
* Irrigation coverage test including initial and final test.
* Finish grade prior to planting.
* Plant materials prior to planting and soil preparation.
* Planting, including street trees. Contact the Park Planning and Landscape Development
Section, Engineering Division, for species and final location. '' ' SAN BERNARDINO FRWY
g g p �`io�,:
{ Compliance with approved with approved plans. N.T.S.
* Final Inspection.
2. The Owner's representative and landscape contractor shall bep resent at each inspection. SHEET INDEX KEY MAP
.... 3`''^'a'+Z....•' _o,.�.ue..e,� �.,,._ • _
- .rxa.M<.�....m..e._-.�a.sr,n.q....ctta.ti`-.w�
Y'SHEET DESCRIPTION .. _= f ��,..Q..r,,.�..•�.........
aµ -
} _y1tii 17
23 22 21 20 is 1L' 1 I� tw lA
: r1 a emwul va .n rre s ns A3 1 —� 2 fii:L72 eLx.7.) f ¢
L-1 TITLE SHEET I �_I ;�FAb45.2 __� ,t> N
L-2 IRRIGATION PLAN PROJECT ITE I 25
L-3 IRRIGATION PLAN ► }= tiro = :.� =- —.�.�� >�� 1
IRRIGATION DETAILS = ;: a�^ ;%`" �a�,=�
L-5 IRRIGATION DETAILS
AND NOTES ::: ' >� G� __.e:_r., _ i3 N
20
L-6 PLANTING PLAN° Few IAN
L-7 PLANTING PLAN
} 3.: • • � �•am N
L-8 PLANTING DETAILS ,•.._. ➢� {
} _.. �_ E!l:NCC•ANY lY++...4� 1VAY .. �._..._._._...e...-_,� � co
fT Nt 1 2 3 � 4 .5 6 7 8 BA-nz U
•L-iaa FSG=Z.! Fx„-aZ73 AA21P !Mc?�r F'°•< 13rt.},gJ FUL+;,t,b
N
(D
N.T.S. 0
Cn
BENCHMARK: } •h. t� 05 lY� ►o - -7
OWNER DEVELOPER:
CITY OFFONTANA CALIFORNIA
" /3612 M/SS/ON /NN AVE ' z
vlo� CALTRANS BENCHMARK NO. 8-17 ��NDq FUL R/VERS/D£, CALIF. 92501 PUBLIC WORKS DEPARTMENT
Calk TO
LL FREE NEW WEST BRASS CAP IN CONCRETE S.C.E. TOWER LEG. '�� �y L®II■■t&:■ L/C #1512 0
.■oai:not■ PH. (909) 781-1930 DRAWN BY: PARKWAY LANDSCAPE PLAN SCALE: a
1 —�� 343 N/0 HIGHLAND AVE., 0.2 MI. W/0 SAN FAX (909) 686-8091
HOME SEVAINE RD. IN SOUTH CONCRETE BASE OF } a u e FOR
227ZOW S.C.E. TOWER 19.5; 2.65 MI. W. ALONG 9 31 JE
1M 369 SAN MIGUEL DRIVE, SUITE 375—A HIGHLAND AVE. FROM SIERRA AVE.
DESIGNED BY: TRACT 16A10 DATE:
� ene a a e \� PREPARED BY: JE AUG 21, 2003 ` z
low 1 T NEWPORT BEACH, CA 92660
(949) 640-6420 * FAX: (949) 640-6484 MARK BY DATE APPR. DATE r-9TF of CAS-�F��� ITLE S T
CHECKED BY APPRO DWG. NO. SHEET
ELEV.= 1428.6090 DATE:
ENGINEER COUNTY �' !Z " Dy 3457
CITY ENGINEER: RICARDO SANDOVAL, R.C.E. 51152 OF 8
0