HomeMy WebLinkAbout3440-3w
J
Q
U
L0
SCALE IN FEET
4.0 80 120
WINTER NIGHT COURT STAR DUST LANE
MA TCH LINE
SEE SH T. NO. 2
STA 9+44.31
L//VL
TOLL FREE -"qgavww' 1-800-227-2600
A PUBLIC SERVICE BY UNDERGROUND SERVICE ALERT
MERSET STREET
w
A
CONSTRUCTION NOTES
O1 INSTALL 18"RCP, D -LOAD PER PROFILE.
2O INSTALL 24 "RCP, D -LOAD PER PROFILE.
3OINSTALL 36"RCP, D -LOAD PER PROFILE.
5O CONSTRUCT MANHOLE PER A.P. W.A. STD. PLAN J20-1.
6O CONSTRUCT JUNCTION STRUCTURE PER A. P. W.A. STD. 331-2.
10 INSTALL 30" RCP, D -LOAD PER PROFILE.
REV. REVISION DESCRIPTION DATE ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER,
THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
RECOAD DrAAWI46 /it TA L IL-4 ZAz . 7 STANDARDS IN EFFECT.
RECORDS DRAWING
THESE RECORD DRAW;NGS HAVE 13EEN PREPARED, IN
PART, ONI THE BASIS OF INFORMATION COMPILED AND
FURNISHED BY OTHERS. THE ENGINEER WILL NOT BE
RESPONSIBLE FOR ANY ERRORS OR OMISSIONS WHICH
HAVE BEEN INCORPORATED INTO THE DOCUMENTS AS
A RESULT THEREOF.
V lL%
# 615
RAILROAD SPIKE AT INTERSECTION OF
CITRUS AVENUE AND LOS CEDROS
AVENUE, IN POWER POLE NO. 9017E
ON THE EAST SIDE OF CITRUS AVENUE.
ELEVATION # 1467.59
,SIS OF BEAR M -
BEARING OR N 89'40'40" E ALONG THE
7H LINE OF SECTION 30,
NSHIP 1 NORTH, RANGE 5 WEST,
BERNARDINO MERIDIAN, AS SHOWN ON
NO. 15908, FILED IN BOOK 271, PAGES
THROUGH 39 OF MAPS, WAS USED
THE BASIS OR BEARINGS FOR THIS MAP.
CROSSING PIPE WALL
(DIAMETER OF PIPE ■ Del
OPTIONAL SIDE OF �, } (SEE NOTE 3)
o.;..
BLANKET (TYP.) x v
CONCRETE BLANKET I
(CLASS 265C14 2
LAI
(450-C-2000) CONCRETE) I ~ I(TVP.)
Z
= 3Dp/4 FOR D i 375 m75 nwn m US-)
51)
UNDISTURBED EARTH (TYP.) � ISO mm
EXISTING PIPE 6TYPIN
M.
OUTSIDE OF PIPE BELL
CONCRETE BLANKET
(FOR EXISTING PIPES CROSSED OVER BY A NEW PIPE)
NOTES:
1. CONCRETE BLANKET IS REQUIRED WHEN THE CLEARANCE BETWEEN THE TOP OF THE EXISTING PIPE
AND THE BOTTOM OF THE CROSSING PIPE IS LESS THAN 450 mm (18 IN.).
2. Y z0/6 (150 mm (6 IN.) MIN.). WHERE THE CLEARANCE BETWEEN THE TOP OF THE EXISTING PIPE AND
THE BOTTOM OF THE CROSSING PIPE IS LESS THAN Y, THE CONCRETE SHALL BE PLACED BETWEEN THE
PIPES AND AROUND THE SIDES OF THE CROSSING PIPE UP TO A LEVEL EQUAL TO Y ABOVE THE EXIST-
ING PIPE. OR AS REOUIRED BY NOTE 3 BELOW, WHICHEVER IS HIGHER.
3. X 2 D/12, MINIMUM, TO PROVIDE BEDDING MATERIAL FOR THE CROSSING CONDUIT. WHEN X IS LESS
THAN THIS MINIMUM. THE ENTIRE TOP SURFACE OF THE BLANKET SHALL BE RAISED TO MAKE CONTACT
WITH THE LOWER 900 OF THE CROSSING PIPE.
4. THE BLANKET SHALL EXTEND LONGITUDINALLY TO THE FIRST JOINT BEYOND THE TRENCH EXCAVATION
AT EACH END OF THE BLANKET, EXCEPT THAT THE BLANKET NEED NOT BE EXTENDED MORE THAN 1.2 m
(4 FT.) BEYOND THE TRENCH.
5., WHENEVER A PIPE BELL IS ENCOUNTERED WITHIN THE LIMITS OF THE BLANKET, ALL DIMENSIONS SHALL
REFER TO THE BELL.
INVERT SLAB OF ARCH OR B0� 150mm
SECTION (CROSSING CONDUIT) (6-)
UNDISTURBED EARTH
Z
SO 2•) THICK STYROFOAM OR^
V) OMAATERIAlPR0VE0 COMPRESSIBLE
NO MINIMUM
1
EXISTING PIPE-�
OUTSIDE OF PIPE BELL
COMPRESSIBLE BLANKET
(FOR EXISTING PIPES CROSSED OVER BY A NEW BOX OR ARCH)
NOTES*
1. COMPRESSIBLE BLANKET IS REOUIRED WHEN THE CLEARANCE BETWEEN THE TOP OF THE EXISTING
PIPE AND THE BOTTOM OF THE CROSSING CONDUIT (BOX OR ARCH) IS LESS THAN 450 mm (18 IN.).
2. THE BLANKET SHALL EXTEND LONGITUDINALLY FOR THE FULL CROSSING CONDUIT TRENCH WIDTH.
3. DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACT EQUAL VALUES.
IF METRIC VALUES ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES,
WITH THE EXCEPTION OF REINFORCING BAR SIZES FOR WHICH ENGLISH (IMPERIAL) BAR SIZES
MAY BE SUBSTITUTED FOR METRIC BAR SIZES. IF ENGLISH UNITS ARE USED, ALL VALUES USED
FOR CONSTRUCTION SHALL BE ENGLISH VALUES.
AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER
CURVE
TABLE
LINE
BEARING
CURVE
DELTA
RADIUS
LENGTH
TANGENT
Cl
90'02'02"
45.00
70.71
45.03
C2
8' 19'59"
1006.00
146.31
73.28
C3
2'2343"
394.00
16.47
8.24
C4
30'28'02"
45.00
23.93
12.25
C5
65'30'16"
45.00
51.45
1 28.95
C6
45'00'00"
22.50
17.67
1 9.32
REV. REVISION DESCRIPTION DATE ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER,
THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
RECOAD DrAAWI46 /it TA L IL-4 ZAz . 7 STANDARDS IN EFFECT.
RECORDS DRAWING
THESE RECORD DRAW;NGS HAVE 13EEN PREPARED, IN
PART, ONI THE BASIS OF INFORMATION COMPILED AND
FURNISHED BY OTHERS. THE ENGINEER WILL NOT BE
RESPONSIBLE FOR ANY ERRORS OR OMISSIONS WHICH
HAVE BEEN INCORPORATED INTO THE DOCUMENTS AS
A RESULT THEREOF.
V lL%
# 615
RAILROAD SPIKE AT INTERSECTION OF
CITRUS AVENUE AND LOS CEDROS
AVENUE, IN POWER POLE NO. 9017E
ON THE EAST SIDE OF CITRUS AVENUE.
ELEVATION # 1467.59
,SIS OF BEAR M -
BEARING OR N 89'40'40" E ALONG THE
7H LINE OF SECTION 30,
NSHIP 1 NORTH, RANGE 5 WEST,
BERNARDINO MERIDIAN, AS SHOWN ON
NO. 15908, FILED IN BOOK 271, PAGES
THROUGH 39 OF MAPS, WAS USED
THE BASIS OR BEARINGS FOR THIS MAP.
CROSSING PIPE WALL
(DIAMETER OF PIPE ■ Del
OPTIONAL SIDE OF �, } (SEE NOTE 3)
o.;..
BLANKET (TYP.) x v
CONCRETE BLANKET I
(CLASS 265C14 2
LAI
(450-C-2000) CONCRETE) I ~ I(TVP.)
Z
= 3Dp/4 FOR D i 375 m75 nwn m US-)
51)
UNDISTURBED EARTH (TYP.) � ISO mm
EXISTING PIPE 6TYPIN
M.
OUTSIDE OF PIPE BELL
CONCRETE BLANKET
(FOR EXISTING PIPES CROSSED OVER BY A NEW PIPE)
NOTES:
1. CONCRETE BLANKET IS REQUIRED WHEN THE CLEARANCE BETWEEN THE TOP OF THE EXISTING PIPE
AND THE BOTTOM OF THE CROSSING PIPE IS LESS THAN 450 mm (18 IN.).
2. Y z0/6 (150 mm (6 IN.) MIN.). WHERE THE CLEARANCE BETWEEN THE TOP OF THE EXISTING PIPE AND
THE BOTTOM OF THE CROSSING PIPE IS LESS THAN Y, THE CONCRETE SHALL BE PLACED BETWEEN THE
PIPES AND AROUND THE SIDES OF THE CROSSING PIPE UP TO A LEVEL EQUAL TO Y ABOVE THE EXIST-
ING PIPE. OR AS REOUIRED BY NOTE 3 BELOW, WHICHEVER IS HIGHER.
3. X 2 D/12, MINIMUM, TO PROVIDE BEDDING MATERIAL FOR THE CROSSING CONDUIT. WHEN X IS LESS
THAN THIS MINIMUM. THE ENTIRE TOP SURFACE OF THE BLANKET SHALL BE RAISED TO MAKE CONTACT
WITH THE LOWER 900 OF THE CROSSING PIPE.
4. THE BLANKET SHALL EXTEND LONGITUDINALLY TO THE FIRST JOINT BEYOND THE TRENCH EXCAVATION
AT EACH END OF THE BLANKET, EXCEPT THAT THE BLANKET NEED NOT BE EXTENDED MORE THAN 1.2 m
(4 FT.) BEYOND THE TRENCH.
5., WHENEVER A PIPE BELL IS ENCOUNTERED WITHIN THE LIMITS OF THE BLANKET, ALL DIMENSIONS SHALL
REFER TO THE BELL.
INVERT SLAB OF ARCH OR B0� 150mm
SECTION (CROSSING CONDUIT) (6-)
UNDISTURBED EARTH
Z
SO 2•) THICK STYROFOAM OR^
V) OMAATERIAlPR0VE0 COMPRESSIBLE
NO MINIMUM
1
EXISTING PIPE-�
OUTSIDE OF PIPE BELL
COMPRESSIBLE BLANKET
(FOR EXISTING PIPES CROSSED OVER BY A NEW BOX OR ARCH)
NOTES*
1. COMPRESSIBLE BLANKET IS REOUIRED WHEN THE CLEARANCE BETWEEN THE TOP OF THE EXISTING
PIPE AND THE BOTTOM OF THE CROSSING CONDUIT (BOX OR ARCH) IS LESS THAN 450 mm (18 IN.).
2. THE BLANKET SHALL EXTEND LONGITUDINALLY FOR THE FULL CROSSING CONDUIT TRENCH WIDTH.
3. DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACT EQUAL VALUES.
IF METRIC VALUES ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES,
WITH THE EXCEPTION OF REINFORCING BAR SIZES FOR WHICH ENGLISH (IMPERIAL) BAR SIZES
MAY BE SUBSTITUTED FOR METRIC BAR SIZES. IF ENGLISH UNITS ARE USED, ALL VALUES USED
FOR CONSTRUCTION SHALL BE ENGLISH VALUES.
AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER
LINE TABLE
BLANKET PROTECTION FOR PIPES
LINE
BEARING
LENGTH
Ll
N 89'4637"
E 55.16'
L2
N 45' 13'23"
W 37.24'
L3
N 44'4637"
E 20.27' 4
L4
N 44'4435"
E 10.95 I
REV. REVISION DESCRIPTION DATE ENGR. CITY DATE SHOULD CONSTRUCTION OF THE REQUIRED IMPROVEMENTS NOT
COMMENCE WITHIN TWO YEARS OF THE DATE OF APPROVAL
SHOWN HEREON AND CARRIED FORTH IN A DILIGENT MANNER,
THE CITY ENGINEER MAY REQUIRE REVISIONS TO THE PLANS TO
BRING THEM INTO CONFORMANCE WITH CONDITIONS AND
RECOAD DrAAWI46 /it TA L IL-4 ZAz . 7 STANDARDS IN EFFECT.
RECORDS DRAWING
THESE RECORD DRAW;NGS HAVE 13EEN PREPARED, IN
PART, ONI THE BASIS OF INFORMATION COMPILED AND
FURNISHED BY OTHERS. THE ENGINEER WILL NOT BE
RESPONSIBLE FOR ANY ERRORS OR OMISSIONS WHICH
HAVE BEEN INCORPORATED INTO THE DOCUMENTS AS
A RESULT THEREOF.
V lL%
# 615
RAILROAD SPIKE AT INTERSECTION OF
CITRUS AVENUE AND LOS CEDROS
AVENUE, IN POWER POLE NO. 9017E
ON THE EAST SIDE OF CITRUS AVENUE.
ELEVATION # 1467.59
,SIS OF BEAR M -
BEARING OR N 89'40'40" E ALONG THE
7H LINE OF SECTION 30,
NSHIP 1 NORTH, RANGE 5 WEST,
BERNARDINO MERIDIAN, AS SHOWN ON
NO. 15908, FILED IN BOOK 271, PAGES
THROUGH 39 OF MAPS, WAS USED
THE BASIS OR BEARINGS FOR THIS MAP.
CROSSING PIPE WALL
(DIAMETER OF PIPE ■ Del
OPTIONAL SIDE OF �, } (SEE NOTE 3)
o.;..
BLANKET (TYP.) x v
CONCRETE BLANKET I
(CLASS 265C14 2
LAI
(450-C-2000) CONCRETE) I ~ I(TVP.)
Z
= 3Dp/4 FOR D i 375 m75 nwn m US-)
51)
UNDISTURBED EARTH (TYP.) � ISO mm
EXISTING PIPE 6TYPIN
M.
OUTSIDE OF PIPE BELL
CONCRETE BLANKET
(FOR EXISTING PIPES CROSSED OVER BY A NEW PIPE)
NOTES:
1. CONCRETE BLANKET IS REQUIRED WHEN THE CLEARANCE BETWEEN THE TOP OF THE EXISTING PIPE
AND THE BOTTOM OF THE CROSSING PIPE IS LESS THAN 450 mm (18 IN.).
2. Y z0/6 (150 mm (6 IN.) MIN.). WHERE THE CLEARANCE BETWEEN THE TOP OF THE EXISTING PIPE AND
THE BOTTOM OF THE CROSSING PIPE IS LESS THAN Y, THE CONCRETE SHALL BE PLACED BETWEEN THE
PIPES AND AROUND THE SIDES OF THE CROSSING PIPE UP TO A LEVEL EQUAL TO Y ABOVE THE EXIST-
ING PIPE. OR AS REOUIRED BY NOTE 3 BELOW, WHICHEVER IS HIGHER.
3. X 2 D/12, MINIMUM, TO PROVIDE BEDDING MATERIAL FOR THE CROSSING CONDUIT. WHEN X IS LESS
THAN THIS MINIMUM. THE ENTIRE TOP SURFACE OF THE BLANKET SHALL BE RAISED TO MAKE CONTACT
WITH THE LOWER 900 OF THE CROSSING PIPE.
4. THE BLANKET SHALL EXTEND LONGITUDINALLY TO THE FIRST JOINT BEYOND THE TRENCH EXCAVATION
AT EACH END OF THE BLANKET, EXCEPT THAT THE BLANKET NEED NOT BE EXTENDED MORE THAN 1.2 m
(4 FT.) BEYOND THE TRENCH.
5., WHENEVER A PIPE BELL IS ENCOUNTERED WITHIN THE LIMITS OF THE BLANKET, ALL DIMENSIONS SHALL
REFER TO THE BELL.
INVERT SLAB OF ARCH OR B0� 150mm
SECTION (CROSSING CONDUIT) (6-)
UNDISTURBED EARTH
Z
SO 2•) THICK STYROFOAM OR^
V) OMAATERIAlPR0VE0 COMPRESSIBLE
NO MINIMUM
1
EXISTING PIPE-�
OUTSIDE OF PIPE BELL
COMPRESSIBLE BLANKET
(FOR EXISTING PIPES CROSSED OVER BY A NEW BOX OR ARCH)
NOTES*
1. COMPRESSIBLE BLANKET IS REOUIRED WHEN THE CLEARANCE BETWEEN THE TOP OF THE EXISTING
PIPE AND THE BOTTOM OF THE CROSSING CONDUIT (BOX OR ARCH) IS LESS THAN 450 mm (18 IN.).
2. THE BLANKET SHALL EXTEND LONGITUDINALLY FOR THE FULL CROSSING CONDUIT TRENCH WIDTH.
3. DIMENSIONS SHOWN ON THIS PLAN FOR METRIC AND ENGLISH UNITS ARE NOT EXACT EQUAL VALUES.
IF METRIC VALUES ARE USED, ALL VALUES USED FOR CONSTRUCTION SHALL BE METRIC VALUES,
WITH THE EXCEPTION OF REINFORCING BAR SIZES FOR WHICH ENGLISH (IMPERIAL) BAR SIZES
MAY BE SUBSTITUTED FOR METRIC BAR SIZES. IF ENGLISH UNITS ARE USED, ALL VALUES USED
FOR CONSTRUCTION SHALL BE ENGLISH VALUES.
AMERICAN PUBLIC WORKS ASSOCIATION - SOUTHERN CALIFORNIA CHAPTER
PROMULGATED BY THE
PUBLIC WORKS STANDARDS INC.,
BLANKET PROTECTION FOR PIPES
STANDARD PLAN
T IC
GREENSOOK COMMITTEE
2METRIC
i
198
REV. 1998
SHEET 1 OF 1
USE WITH STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION
Q)
V
Prepared Under The Supervision Of : CITY OF FONTANA, CALIFORNIA J
Q�N PREPARED IN THE OFFICE OF
�6eJeSL,4,,CFy� MADOLE AND ASSOCIATES, INC. STORM DRAIN IMPROVEMENT PLANS
3 N Z DRAWN BY:
C5 No, 65195 Q 10601 CHURCH STREET , STE. 107 JV TRA CT 16363 SCALE: 1 "-40'
to RANCHO CUCAMONGA, CA 91730 DESIGNED BY. LINE "A" FROM STA: 9+44.31 TO STA. 14+31.21
Expl 9-30-05 tiP PHONE (909) 948-1311 MJG �! AND LAT ACS -4, A-5, A-7 DATE:NOV. 2003 O
9 CIVIC-
TFQFCALIF�� Date 'f-Z�J-OI{ CH BY: AP OVED DRAWING NO.: �
RCE 65195 EXP. 9-30-05 MJG�LP �•� l 3440 3 5
CITY ENGINEER R.C.E. 51152 DATE
J:\685-1650\storm\sdO3.dwg, 04/29/2004 03:35:52 PM, cc ,