HomeMy WebLinkAbout3440-1GENERAL NO TES 1 ALL WORK SHALL BE IN ACCORDANCE WITH THESE PLANS, THE CITY OF FONTANA STANDARD PLANS, THE CONTRACT PROVISIONS AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION ("GREEN BOOK'). ALL REFERENCE SPECIFICATIONS AND STANDARDS SHALL BE THE LATEST EDITION UNLESS OTHERWISE NOTED. 2 WHEN A TECHNICAL CONFLICT IS FOUND TO EXIST IN THE CONTRACT DOCUMENTS THAT CAN NOT BE RESOLVED BY REFERENCE TO PRECEDENCE PROVISIONS IN THE "GREEN BOOK" THE CONTRACTOR SHALL IMMEDIATELY REPORT SAID CONFLICT TO THE CITY ENGINEER FOR RESOLUTION. 3 ALL MATERIALS AND METHODS ARE SUBJECT TO THE APPROVAL OF THE CITY ENGINEER. 4 ADVANCE CONSTRUCTION SIGNING INDICATING DURATION OF PROJECT SHALL BE IN PLACE ONE WEEK PRIOR TO IMPLEMENTING DETOURS 5 CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA COMMUNITY DEVELOPMENT DEPARTMENT, ENGINEERING DIVISION PRIOR TO THE START OF ANY WORK. INSPECTION COORDINATION SHALL BE REQUESTED AT LEAST TWO WORKING DAYS PRIOR TO THE START OF ANY WORK IN PUBLIC RIGHT—OF—WAY WITHIN THE CITY LIMITS. CALL (909) 350-7610. 6 THE CONTRACTOR SHALL CONFORM TO ALL TRAFFIC CONTROL POLICIES, METHODS AND PROCEDURES DESCRIBED IN THE STATE OF CALIFORNIA MANUAL OF TRAFFIC CONTROLS, LATEST NON—METRIC EDITION UNLESS OTHERWISE DIRECTED BY THE CITY TRAFFIC ENGINEER. 7 IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO MAINTAIN BARRICADES, DELINEATORS OR OTHER TRAFFIC CONTROL DEVICES AT ALL TIMES. 8 THE CONTRACTOR SHALL OBTAIN A PERMIT TO PERFORM EXCAVATION OR TRENCH WORK FOR TRENCHES 5 FEET OR GREATER IN DEPTH FROM THE CALIFORNIA STATE DIVISION OF INDUSTRIAL SAFETY. 9 THE WALLS AND FACES OF ALL EXCAVATIONS GREATER THAN FIVE (5) FEET IN DEPTH SHALL BE GUARDED BY SHORING, SLOPING OF THE GROUND OR OTHER APPROVED MEANS PURSUANT TO THE REQUIREMENTS OF THE DIVISION OF INDUSTRIAL SAFETY OF THE STATE OF CALIFORNIA. TRENCHES LESS THAN FIVE (5) FEET SHALL ALSO BE GUARDED WHEN THE POTENTIAL EXISTS FOR GROUND MOVEMENT 10 NO MATERIAL OR EQUIPMENT SHALL BE STORED IN THE PUBLIC RIGHT OF WAY WITHOUT OBTAINING A SEPARATE PERMIT FOR THAT PURPOSE. 11 THE LOCATIONS OF UTILITIES SHOWN HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION, HOWEVER, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO DETERMINE, IN THE FIELD, THE TRUE LOCATION AND ELEVATION OF ANY EXISTING UTILITIES, AND TO EXERCISE PROPER PRECAUTION TO AVOID DAMAGE THERETO. THE CONTRACTOR SHALL CONTACT UNDERGROUND SERVICE ALERT AT 1-800-227-2600 TWO WORKING DAYS BEFORE EXCAVATION. 12 THE CONTRACTOR SHALL COORDINATE CONSTRUCTION WITH ALL UTILITY COMPANIES INCLUDING, BUT NOT LIMITED TO, GAS, TELEPHONE, ELECTRIC, CABLE TELEVISION, LANDSCAPING, LANDSCAPE IRRIGATION, DOMESTIC WATER, RECLAIMED WATER, SEWER, STORM DRAIN, FLOOD CONTROL AND CALTRANS ALL UTILITY COMPANIES SHALL BE GIVEN TWO WORKING DAYS NOTICE PRIOR TO WORK AROUND THEIR FACILITIES 13 THE CONTRACTOR SHALL NOT OPERATE ANY FIRE HYDRANT OR WATER MAIN VALVES WITHOUT APPROPRIATE AGENCY AUTHORIZATION. CONTRACTOR SHALL COORDINATE WITH THE APPROPRIATE WATER COMPANY FOR VALVE OPERATION AND WATER REQUIREMENTS. 14 STATIONING REFERS TO THE CENTERLINE OF STORM DRAIN EXCEPT WHERE OTHERWISE NOTED. 15 ADEQUATE CONSTRUCTION CONTROL STAKES SHALL BE SET BY THE ENGINEER TO ENABLE THE CONTRACTOR TO CONSTRUCT THE WORK TO THE PLAN GRADES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PRESERVATION OF BENCHMARKS AND CONSTRUCTION CONTROL STAKING DURING CONSTRUCTION. 16 THE CONTRACTOR SHALL NOT DISTURB EXISTING SURVEY MONUMENTS, MONUMENT TIES OR BENCH MARKS WITHOUT PRIOR NOTIFICATION TO THE CITY ENGINEER. 17 REMOVAL AND REPLACEMENT OF EXISTING SURVEY CONTROL, INCLUDING SURVEY MONUMENTS, MONUMENT TIES AND BENCH MARKS, SHALL BE DONE BY A REGISTERED CIVIL ENGINEER OR LICENSED LAND SURVEYOR. SURVEY MONUMENTS THAT WILL BE DESTROYED AS A RESULT OF THIS CONSTRUCTION SHALL BE REPLACED. THE CONTRACTOR SHALL NOTIFY THE ENGINEER ONE WEEK PRIOR TO CONSTRUCTION SO THAT TIES TO MONUMENTS CAN BE ESTABLISHED FOR LATER REPLACEMENT OF THE MONUMENT. 18 THE CONTRACTOR SHALL MAINTAIN ACCESS FOR LOCAL RESIDENTS AND BUSINESSES AT ALL TIMES. A MINIMUM 12 FOOT LANE SHALL BE MAINTAINED AT ALL TIMES IN THE CONSTRUCTION AREA FOR RESIDENTS AND EMERGENCY VEHICLES. 19 THE CONTRACTOR SHALL PROVIDE AND MAINTAIN AN EFFECTIVE MEANS OF DUST CONTROL, INCLUDING ADEQUATE WATERING, AT ALL TIMES. 20 THE CONTRACTOR SHALL NOT CAUSE ANY EXCAVATED MATERIAL, MUD, SILT OR DEBRIS TO BE DEPOSITED ONTO PUBLIC OR PRIVATE PROPERTY ADJACENT TO THE RIGHT OF WAY DURING CONSTRUCTION WITHOUT PRIOR WRITTEN APPROVAL. 21 NO TRENCH BACKFILL SHALL TAKE PLACE WITHOUT PRIOR APPROVAL OF THE CITY INSPECTOR. 22 A GEOTECHNICAL ENGINEER SHALL CERTIFY ALL BACKFILL COMPACTION. FAILURE TO OBTAIN THE REQUIRED DENSITY SHALL REQUIRE RE—WORKING OF THAT PORTION OF THE WORK UNTIL THE SPECIFIED DENSITY IS OBTAINED. 23 CARE SHOULD BE TAKEN TO PREVENT GRADES, DITCHES, AND SWALES FROM UNDERMINING STREET IMPROVEMENTS UPON INSPECTION OF THE SITE, THE CITY ENGINEER MAY REQUIRE TEMPORARY NON—ERODEABLE SWALES ENTERING OR LEAVING IMPROVEMENTS. 24 ALL EXPOSED CONCRETE SURFACES SHALL CONFORM IN GRADE, COLOR AND FINISH TO MATCH EXISTING CONCRETE. 25 NO OPEN TRENCH SHALL BE ALLOWED AT THE END OF THE DAY WITHOUT PRIOR APPROVAL OF THE CITY ENGINEER. 26 PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL EXPOSE EXISTING FACILITIES, AND VERIFY ELEVATION AND LOCATION OF CONNECTIONS. CITY APPROVAL OF CONNECTIONS TO EXISTING FACILITIES DOES NOT IMPLY CORRECTNESS OF ELEVATIONS OR LOCATIONS SHOWN ON THE PLANS. 27 IF EXISTING UTILITIES OR ANY OTHER FACILITIES CONFLICT WITH THE PROPOSED IMPROVEMENTS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND ALL AFFECTED AGENCIES IMMEDIATELY. 28 NO CONCRETE SHALL BE PLACED UNTIL THE FORMS AND REINFORCING STEEL HAVE BEEN PLACED, INSPECTED AND APPROVED. 29 ALL UNDERGROUND UTILITIES SHALL BE INSTALLED, TESTED AND APPROVED PRIOR TO PAVING OF STREETS. 30 APPROVED SOIL STERILANT IS REQUIRED UNDER ALL NEW ASPHALT PAVEMENT PRIOR TO PLACEMENT. 31 ALL MANHOLES, CLEANOUT FRAMES, COVERS AND VALVE BOXES SHALL BE RAISED TO FINISHED GRADE BY THE PAVING CONTRACTOR UPON COMPLETION OF PAVING. ,32 UPON COMPLETION OF CONSTRUCTION, CONTRACTOR SHALL RESTORE ALL SIGNING, STRIPING, BARRICADES, AND OTHER TRAFFIC CONTROL DEVICES TO THE SATISFACTION OF THE CITY TRAFFIC ENGINEER. 33 AS—BUILT DRAWINGS SHALL BE PROVIDED BY THE CONTRACTOR TO THE ENGINEER OF RECORD, WHO SHALL PROVIDE RECORD DRAWINGS TO THE CITY ENGINEER. 34 MINIMUM D—LOAD FOR STORM DRAIN PIPE IS 1350. S—,z� C�7 CITY OF FON TA NA S TORA4 DRAIN IMPRO VEA4EN T PLANS TRA C T NO 16363 TRACT NO. 1909 240-011-15 62 63 �° 61 1 60 59 1 58 � 57 56 � 55 1 CD 240-011-17 _ � II COMMERCIAL ZONING 64� 1 -- SUN --GLORY ci 5�41 65 48 49 150 51 52 53 Q 66U) 47 46 45 44 1 43 42 41 78 67 100 98 79 177 68 80 �aHTSTAR COU 101 76 69 I976181 75 70L2 102 96 39 40- 34 35 36 37 38 82103 95 74 331 32 31 30 29 28 2783 I1 104 94 _ ! Ii�II 1 973 72 I 1 t i V I 105 0 93 84 _�-----SUMM _ _ I I _., , ERSET -S REST - �-_A LOS .,�.,,...,.-�....._-!` W I 92 85 IW 16 { 1 LOS CED OS I ` ;SEE; SH NO. 3 CEDROS _ '� 91 86 15 17 { 18 19 1 20 21 22 °; 23 24 25 26 1 5 90 87 t 14 ORANGE HEIGHTS ACRES ' 2 240-012-23 89 88 13 1 3 I 1 240-012-07 — T 240-012-08 o ; ' � j SEE S14T. N0. � 1 J 6 1 71 8 9 10 11 12 ---------------- Z 240—•012-09 240012--10 W I 240012-24 240-012-2 I 2{t0-012--12 CITY OF FONTANA UTILITY NOTIFICATION LIST CITY OF FONTANA PACIFIC BELL CO. ATTN: CARLOS NAVARRO ATTN. VIRGINIA BECKER 8353 SIERRA AVENUE 3939 E.CORONADO STREET FONTANA, CA 92335 ANAHEIM, CA 92807 (909) 350-6632 (714) 666-5467 SO. CALIFORNIA GAS COMPANY COMCAST (CABLE TV) ATTN. GREG GASPAR ATTN. JACK HAYES 16231 VALLEY BLVD. 1205 DUPONT AVENUE CA. 92335 ONTARIO, CA. 91761 (909) 428-8411 (909) 390-4736 GENERAL TELEPHONE COMPANY SO. CALIFORNIA EDISON COMPANY ATTIC STEVE HOCK 7951 REDWOOD AVENUE 1400 E. PHILLIPS BLVD. FONTANA, CA. 92JJ5 NTARIO, CA. 91766 (909) (909) 820-5598 UNDERGROUND 800) 422-4133 (213) 637-1233 PIPELINES FONTANA WATER COMPANY (909) 357-6233 DISTRIBUTION ATTIC MICHAEL J. McGRAW (800) 422-41 JJ 8440 NUEVO AVENUE 3O FONTANA, CA 92335 CRAWFORD CANYON MUTUAL WATER CO. (909) 822-2201 ATTICBILL VANDERKIEFT, JR. FAX: (909) 823-5045 (619) 868-6040 END VERTICAL CURVE UNDERGROUND SERVICE ALERT FLOW LINE (800) 227-2600 CONSTRUCT MANHOLE PER A. P. W.A. STD. PLAN WALNUT STREET JIiJ`1LL. / - J JV i GR4NULAR BEDDING FROM SELECTED TRENCH SIDE MATERNAL (1- MAX. SIZE). /\ PRIVATE ENGINEER'S NOTICE TO CONTRACTORS THE EXISTENCE AND LOCATION OF ANY UNDERGROUND U77LI77ES OR STRUCTURES SHOWN ON THESE PLANS ARE OBTAINED BY A SEARCH OF AVAILABLE RECORDS, TO THE BEST OF OUR KNOWLEDGE, THERE ARE NO EXISTING UTILITIES EXCEPT THOSE SHOWN ON THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN ON THESE DRAWINGS. THE CONTRACTOR FURTHER ASSUMES ALL LIABILITY AND RESPON— SIBILITY FOR THE UTILITY PIPES, CONDUITS OR STRUCTURES SHOWN OR NOT SHOWN ON MESE DRAWINGS THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSI— BILITY FOR THE JOB S/7E CONDITIONS DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT; INCLUDING SAFETY OF ALL PERSONS AND PROPERTY; THAT THIS SHALL APPLY CON77NUOUSL Y AND NOT BE LIMITED TO NORMAL WORKING HOURS; AND THAT 7HE CONTRACTOR SHALL DEFEND, INDEMNIFY, AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY, REAL OR ALLEGED, IN COAINEC77ON WITH THE PERFORMANCE OF WORK ON THIS PROJECT, EXCEP77NG FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF 7HE OWNER OR THE ENGINEER. CONTRACTOR SHALL VERIFY ALL CONDITIONS AND DIMENSIONS AND SHALL REPORT ALL DISCREPANCIES TO THE ENGINEER PRIOR TO THE COMMENCEMENT OF WORK. 210 FWY HIGHLAND A V TO/- Of STR(/CTURAZ / !/v'T. SUBGRAOlf 1:1 SLOPE OR FLATTER. OR ADEQUATE SHORING 90% COMPACTED M477VE BACKFILL 6 " MAX. SIZE — R Q CrQ V V SOUTH HIGHLAND AVJ Q J O 01 s ti 57 LF. C, B. 2O LOS CEDROS A V CENTERLINE TO/- Of STR(/CTURAZ / !/v'T. SUBGRAOlf 1:1 SLOPE OR FLATTER. OR ADEQUATE SHORING 90% COMPACTED M477VE BACKFILL 6 " MAX. SIZE — R CONSTRUCTION NOTES B. C. QUANTITIES 01 INSTALL 18"RCP, D—LOAD PER PROFILE ti 57 LF. C, B. 2O INSTALL 24"RCP, D—LOAD PER PROFILE CENTERLINE 163 LF. END CURVE 3O INSTALL 36 "RCP, D—LOAD PER PROFILE E. G. 566 LF. EX. 0 INSTALL 42 "RCP, D—LOAD PER PROFILE END VERTICAL CURVE 356 LF. FLOW LINE 0 CONSTRUCT MANHOLE PER A. P. W.A. STD. PLAN 320-1 5 EA. 0 CONSTRUCT JUNCTION STRUCTURE PER A. P. W.A. STD. 331-2 4 EA. ( CONSTRUCT CIRCULAR PIPE CULVERT HEADWALL PER CALTRANS STD. D89 1 EA. 0 CONSTRUCT 6'X6' GROUTED RIP RAP 72 SF (R) 0INSTALL 30" CSP RISER PER MODIFIED OCEMA STD. 1327 1 EA. 10 INSTALL 30" RCP, D—LOAD PER PROFILE. 167 LF. 11 INSTALL 36" CSP OUTLET RISER PER MODIFIED OCEMA STD. 1327 2 EA. 12 INSTALL 24" OPEN GRATE COVER PER ALHAMBRA PLATE NO. A-1558-24 & DETAIL ON SHEET 4 1 EA. 13 CONSTRUCT 6" AC BERM PER CITY STD. 136 356 LF. 14 CONSTRUCT TRANSITION STRUCTURE PER APWA STD. 340-1 1 EA. 15 INSTALL 12" PVC SDR 35 DRAIN PIPE 124 LF 16 INSTALL 15" PVC SDR 35 DRAIN PIPE 147 LF 17 INSTALL 18" PVC SDR 35 DRAIN PIPE 121 LF 18 CONST. CONC. BLANKET PER A.P. W.A. STD. 225-1 121 LF TO/- Of STR(/CTURAZ / !/v'T. SUBGRAOlf 1:1 SLOPE OR FLATTER. OR ADEQUATE SHORING 90% COMPACTED M477VE BACKFILL 6 " MAX. SIZE — R III - B. C. BEGIN CURVE z III ti BACK SIDEWALK C, B. CATCH BASIN III = =III III I'm �.� ,'Yl �1<11 NOTES• 1. TRENCH WIDTH SHALL BE CONTROLLED TO TOP OF PIPE ZONE. 2. TRENCH DEPTHS OF GREATER THAN 5' SHALL HAVE ADEQUATE SHORING. - _= I I I J. CLASS Y AGG.BASE ALL TRENCHES 6" MIN. I I 1 = LESS THAN 100' IN LENGTH. 8" MAX. = I I I III — III III 0, 2 3 o m STORM DRAIN PIPE 0.6 D GRANULAR BEDDING FROM SELECTED TRENCH SIDE MATERIAL FOR PIPE 10' OR GREATER IN DEPTH USE 1/2 CRUSHED STONE BEDDING. RCP TRENCH DETAIL NOT TO SCALE NOTE: COMPACTION SHALL BE 90% IN ALL ZONES UNLESS OTHERWISE SPECIFIED. TRENCH STABILITY SHALL CONFORM TO CAL -OSHA REQUIREMENTS LEGEND WALNUT ST BASELINE A VICINITY MAP N. T. S CORD DRAWING THESE RECORD DRAWINGS HAVE BEEN PREPARED, IN PART, ON THE BASIS OF INFORMATION COIvfF;LED AND FURNISHED EY OTHERS. THE ENGINEER 4"11LL NOT BE RESPONSIBLE FOR ANY ERRGRS OR OM;SSIONS WHICH HAVE BEEN INCORPORATED INTO THE DOCUMENTS AS A RESULT THEREOF. A. C. ASPHALTIC CONCRETE B. C. BEGIN CURVE B. V. C. BEG. VERTICAL CURVE B. W. BACK SIDEWALK C, B. CATCH BASIN C.L. CENTERLINE E. C. END CURVE E. P. EDGE PA VEMENT E. G. EDGE GRADE EX. EXISTING E.V.C. END VERTICAL CURVE F. L. FLOW LINE F. S. FINISH SURFACE G.B. GRADE BREAK H.P. HIGH POINT INV INVERT L. E. LANDSCAPE EASEMENT 0. C. ON CENTER P. C. C. PORTLAND CEMENT CONCRETE (R) RIDGE LINE R/W RIGHT OF WAY TAN. TANGENT T. C. TOP OF CURB W WD TH V VERTICAL DEPTH V. C. VERTICAL CURVE INDICATES SLOPE 2.1 AC PA VEMENT Q REMOVAL (590.77) INDICATES EXISTING ELEVATION 310.00 INDICATES PROPOSED ELEVATION JOO INDICATES EXISTING CONTOUR 320 INDICATES PROPOSED CONTOUR DAYLIGHT / CUT—FILL LINE J:\685-1650\storm\sdOl .dwg, 04/29/2004 03:34:52 PM, cc ,