Loading...
HomeMy WebLinkAbout3415-1ALL EXISTING CONDIUTS TO BE REUSED, UNLESS NOTED (A)=NEW. ALL EXISTING DLC9 TO BE REUSED, UNLESS NOTED: (A) = NEW. ALL CONDUCTOR SIGNAL CABLE (CSC) SHALL BE NEW. PHASE DIAGRAM CIRCUIT '� SIGNAL LUMINAIRE PED PUSH BT. FFA"jjle\FAMe\ln\le 02 03 04 �1 rA'l In\f.��ls� 05 06 07 • PHASE -• 0 VEHICLE PED. 111 MESSAGE A B ���10 AQ 29-5-80 30' 55' 15' 250 B 8 N 3—MAS, SV -1—T SP-1—CS 6 Santa Ana Ave 11' 5.5' B 1A 10' — — — B 6 E TV -2—T SP-1—CS 8 — 11.5' 3' C 26-4-80 30' 40' 15' 250 B 6 E 1—MAS,I—MAT, SV -1—T SP-1—CS 4 Sierra Ave 8' 3' D 1A 10' — — — B 4 S TV -2—T SP-1—CS 6 — 5.5 3' E SPECIALED 30' 65' 15' 250 B 4 S 3—MAS, SV -1—T SP-1—CS 2 Santa Ana Ave 12' 2.5' F 1A 10' — — — B 2 W TV -2—T SP-1—CS 4 — 12' 2.5' G 26-4-809 30' 45'• 15'• 250 • B• 2 W 1—MAS•,1—MAT•,SV-1—T• SP—`I—CS 8 Sierra Ave • 20.7' 4' F=15', 3 H 1A • 1 10' — — — B• — — TV-2—To SP-1—CS0 2 — 20.5' 4' 9 CONDUIT SIZE ALL EXISTING CONDIUTS TO BE REUSED, UNLESS NOTED (A)=NEW. ALL EXISTING DLC9 TO BE REUSED, UNLESS NOTED: (A) = NEW. ALL CONDUCTOR SIGNAL CABLE (CSC) SHALL BE NEW. PHASE DIAGRAM STANDARD SIGNAL LUMINAIRE PED PUSH BT. 01 02 03 04 �1 t HT. 05 06 07 08 E EXISTING TRAFFIC SIGNAL GENERAL NOTE. 1. TRAFFIC SIGNAL AND LIGHTING SHALL CONFORM TO THE STATE OF CALIFORNIA STANDARD SPECIFICATIONS SECTION 86 AND STANDARD PLANS (DATED JULY 2002). 2. LOCATION OF ALL UNDERGROUND FACILITIES ARE APPROXIMATE. THE CONTRACTOR SHALL POTHOLE TO DETERMINE THE EXACT LOCATIONS AND VERIFY ALL CONDITIONS ON THE JOB SITE. HAND DIG FOUNDATIONS UNTIL CLEAR OF OBSTRUCTIONS. PHONE UNDERGROUND SERVICE ALERT AT (800)227-2600, TWO (2) WORKING DAYS BEFORE DIGGING. 3. ALL PULLBOXES SHALL BE No. 6 AND CONDUIT SHALL BE 2" RIGID METAL EXCEPT WHERE NOTED OTHERWISE. 4. ALL NEW VEHICLE INDICATIONS SHALL BE 12" AND HAVE L.E.D. SIGNAL MODULES. ALL PEDESTRIAN HEADS SHALL HAVE L.E.D. PEDESTRIAN MODULES. 5. CONTRACTOR SHALL COORDINATE ELECTRIC SERVICE DETAILS AND SCHEDULING WITH THE SOUTHERN CALIFORNIA EDISON COMPANY WELL IN ADVANCE OF NEED. 6. EXISTING LIGHTING SHALL REMAIN IN OPERATION UNTIL NEW SIGNAL AND LIGHTING IS OPERATIONAL PER SPECIFICATIONS. .7. CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR - EXACT .EQUIPMENT LOCATIONS PRIOR TO FINAL PLACEMENT. 8. CONTRACTOR SHALL RELOCATE AND/OR REPLACE LANDSCAPING, SPRINKLERS AND SIDEWALK AFFECTED BY THE CONSTRUCTION TO THE SATISFACTION OF THE ENGINEER. 9. CONTROLLER CABINET SHALL NOT BE SUBJECTED TO WATER FROM SPRINKLERS. MODIFY SPRINKLER SYSTEMS IF NECESSARY. 10. CONTRACTOR SHALL REFER TO THE CITY TRAFFIC ENGINEER IN THE EVENT OF A CONFLICT OR POTENTIAL CONFLICT WITH THESE PLANS AND/OR SPECIFICATIONS FOR THIS PROJECT. 11. ALL REQUIRED CONSTRUCTION PERMITS SHALL BE OBTAINED FROM THE CITY OF FONTANA ENGINEERING DIVISION PRIOR TO COMMENCEMENT OF WORK. 12. WHERE TRAFFIC SIGNAL STREET CROSSING CONDUIT ARE NOT INSTALLED USING THE BORING METHOD, TRENCH REPAIRS SHALL BE PER DETAIL THIS SHEET. 20' 10' O' 20' 40' GRAPHIC SCALE: 1 " 20' SIERRA AVENUE OPOLE SCHEDULE L STANDARD SIGNAL LUMINAIRE PED PUSH BT. SIGNAL MOUNTING PED, S.N.S. PLACEMENT 0 C TYPE HT. SIG. LUM. H.P.S.V. TYPE PHASE QUAD VEHICLE PED. PHASE MESSAGE A B REMARKS AQ 29-5-80 30' 55' 15' 250 B 8 N 3—MAS, SV -1—T SP-1—CS 6 Santa Ana Ave 11' 5.5' B 1A 10' — — — B 6 E TV -2—T SP-1—CS 8 — 11.5' 3' C 26-4-80 30' 40' 15' 250 B 6 E 1—MAS,I—MAT, SV -1—T SP-1—CS 4 Sierra Ave 8' 3' D 1A 10' — — — B 4 S TV -2—T SP-1—CS 6 — 5.5 3' E SPECIALED 30' 65' 15' 250 B 4 S 3—MAS, SV -1—T SP-1—CS 2 Santa Ana Ave 12' 2.5' F 1A 10' — — — B 2 W TV -2—T SP-1—CS 4 — 12' 2.5' G 26-4-809 30' 45'• 15'• 250 • B• 2 W 1—MAS•,1—MAT•,SV-1—T• SP—`I—CS 8 Sierra Ave • 20.7' 4' F=15', 3 H 1A • 1 10' — — — B• — — TV-2—To SP-1—CS0 2 — 20.5' 4' 9 1—N-IDZ IG NO. 206D). T AND LOVE CUIT, 120 AND POLE ' PACIFIC T ARM )MPLETE. TS -'1 E 'r M �t 0 N 1-1 00 0 0 a Of 0 0 U 3 0 0 O U) 00 0 0 n 0 Q U n co O n LO Q H Q on