HomeMy WebLinkAbout3402LT-44552097E
2T' CONC. ELECTROLIER
8' MAST ARM
22000 H.P.S.V.
HH-T3G TO S.L.*097E68 I I�:•
94'
67 HANDHOLE *HH-T3G
10 1/2' X 170 X 12' CONC.
STA. 90+04.50
* 68 1 3,
HH-T3F TO HH-T3G
108'
68
HH-T3G TO S.L.*095E 119'
14
4552095E
,
d
f
O
rn .
a
tn
FQ CDL F0 CP - f' F. PLI•�
1 22
f
41
l�
f
HIGHLAND o�
a
HANDHOLE *HH -73E 4552096E * wt 68 I I :• 14 tz
67 27' CONC. ELECTROLIER HH -73F TO S.L. 098E
10 I/2' X 17' X 12' CONC. I(>E 68 i 8' MAST ARM 195'`
STA.87+78 HH-T3E TO HH -73F 232' 22000 H.P.S.V.
68 1 I':• 68 ,, 4552098E !(
HH -73E TO S.L.*093E * 1 I =' 27' CONC. ELECTROLIER {I i
20 HH -73F TO S.L. 096
20' 8' MAST ARM
22000 H.P.S.V.
4552093E SIERRA
27' CONC. ELECTROLIER 67 HANDHOLE *HH -73F
8' MAST ARM 10 1/2' X 17- X 12' CONC.
22000 H.P.S.V. STA. 90+04.50 AVENUE
GENERAL NOTES:
iALL WORK, MATERIAL AND EQUIPMENT TO BE FURNISHED AND INSTALLED BY THE CONTRACTOR
SHALL CONFORM TO EDISON COMPANY REQUIREMENTS, AND SHALL BE APPROVED BY EDISON CO.
PRIOR TO INSTALLATION.
2, THE LOCATION OF THE PROPOSED CONDUIT SYSTEM IS APPROXIMATE, EXACT CONDUIT AND HANDHOLE
LOCATIONS SHALL BE COORDINATED WITH EDISON CO. PLANNER AND SHALL BE INSTALLED PER EDISON CO.
REQUIREMENTS.
3. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT THE EDISON SERVICE PLANNER,
GREGORY KLOCK AT(909) 357-6585 AT LEAST 30 DAYS IN ADVANCE FOR COORDINATION OF CONSTRUCTION.
4. NEW HANDHOLE AND CONDUIT WITH PULLROPE, AS SHOWN HEREON, SHALL BE FURNISHED
AND INSTALLED BY THE CONTRACTOR. NEW ELECTROLIER, FOUNDATION, AND WIRING SHALL
BE FURNISHED AND INSTALLED BY EDISON CO. ELECTROLIERS ARE SHOWN HEREON FOR
REFERENCE ONLY.
5. ON STREETS WHERE THE SIDEWALKS ARE FIVE FEET OR LESS IN WIDTH AND ADJACENT TO
CURB, THE STREET LIGHTING CONDUIT RISERS AND THE PROPOSED ELECTROLIERS SHALL BE
PLACED AT THE BACK OF THE SIDEWALK, UNLESS OTHERWISE INDICATED ON PLAN.
COORDINATE EXACT LOCATIONS WITH EDISON CO.
6. EXACT FIELD LOCATIONS OF THE PROPOSED STREET LIGHTING RISERS SHALL
CONFORM, WHERE PERMITTED, TO THE AMERICANS WITH DISABILITIES ACT
(ADA) REOUIREMENT.
7• ALL STREET LIGHTS SHALL BE INSTALLED PER CITY OF FONTANA STREET LIGHTING x
STANDARD DRAWING 1016.
' 8• AS FUTURE NEW PRIVATE DEVELOPMENT OCCURS ALONG EITHER SIDE OF SOUTH HIGHLAND AVENUE
THE STREET LIGHTING ON EXISTING WOOD POLES SHALL BE REPLACED WITH ORNAMENTAL 'POLES
(MARBELITES) AND THE OVERHEAD WIRES SHALL BE UNDERGROUND.
REV. REVISION DESCRIPTION DATEENGR. CITY gDATESHOULD CONSTRUCTION OF THE REOUIRED
IMPROVEMENTS NOT COMMENCE WITHIN TWO
YEARS OF THE DATE OF APPROVAL SHOWN HEREON
E
DIAL Two WORKING AND CARRIED FORTH IN A DILIGENT 4 MANNER, THE
BEFORE DAYS BEFORE CITY ENGINEER MAY REOUIRE REVISIONS TO THE
YOU DIG You DIG PLANS TO BRING THEM INTO CONFORMANCE WITH
A PUBLIC SERVICE BY UNDERGRO1-800-22T-2600
ND SER ICE6ALLERT STANDARDS IN EFFECT.
SIERRA
AVENUE
CONSTRUCTION NOTES : (STREET LIGHT CONDUIT)
14 INSTALL STREET LIGHT 22,000 LUMEN PER CITY OF FONTANA STD.
PLAN NO. 1016 (BY SCE).
67 INSTALL NEW 101/2' X 17' X 12' CONCRETE VAULT FOR SCE BY CONTRACTOR
68 INSTALL CONDUIT RUN FOR SCE BY CONTRACTOR AS SHOWN BELOW
NO. OF CONDUIT
1 3 SIZE OF CONDUIT (INCHES)
PROPOSED -CONDUIT RUN FOR 210'
STREET LIGHT WITH DETAILS
AND DEPTH 36' MIN.
LENGTH OF CONDUIT RUN (FEET)
LEGEND as
5 - PROPOSED STREET LIGHT ON 30' MARBLELITE POLE AND 8' MAST ARM
(22,000 LUMEN HPSVs 200 WATTr *20)
4- Q EXISTING SAFETY LIGHTS
20 10 0 20 40 60 80 100
SCALE: r=40'
27' CONC. ELECTROLIER
Q'
"
1
8' MAST ARM
co
22000 H.P.S.V,CD
ao
O
� ,
....
_ —
—
c000
uj
JJ
U—
ujW
(75
t ..
C1
co a
� ~
CD
4E 68
13•
SOUTH
a
HH -73A TO HH-T3EMEM
�'
N
14
,
d
f
O
rn .
a
tn
FQ CDL F0 CP - f' F. PLI•�
1 22
f
41
l�
f
HIGHLAND o�
a
HANDHOLE *HH -73E 4552096E * wt 68 I I :• 14 tz
67 27' CONC. ELECTROLIER HH -73F TO S.L. 098E
10 I/2' X 17' X 12' CONC. I(>E 68 i 8' MAST ARM 195'`
STA.87+78 HH-T3E TO HH -73F 232' 22000 H.P.S.V.
68 1 I':• 68 ,, 4552098E !(
HH -73E TO S.L.*093E * 1 I =' 27' CONC. ELECTROLIER {I i
20 HH -73F TO S.L. 096
20' 8' MAST ARM
22000 H.P.S.V.
4552093E SIERRA
27' CONC. ELECTROLIER 67 HANDHOLE *HH -73F
8' MAST ARM 10 1/2' X 17- X 12' CONC.
22000 H.P.S.V. STA. 90+04.50 AVENUE
GENERAL NOTES:
iALL WORK, MATERIAL AND EQUIPMENT TO BE FURNISHED AND INSTALLED BY THE CONTRACTOR
SHALL CONFORM TO EDISON COMPANY REQUIREMENTS, AND SHALL BE APPROVED BY EDISON CO.
PRIOR TO INSTALLATION.
2, THE LOCATION OF THE PROPOSED CONDUIT SYSTEM IS APPROXIMATE, EXACT CONDUIT AND HANDHOLE
LOCATIONS SHALL BE COORDINATED WITH EDISON CO. PLANNER AND SHALL BE INSTALLED PER EDISON CO.
REQUIREMENTS.
3. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO CONTACT THE EDISON SERVICE PLANNER,
GREGORY KLOCK AT(909) 357-6585 AT LEAST 30 DAYS IN ADVANCE FOR COORDINATION OF CONSTRUCTION.
4. NEW HANDHOLE AND CONDUIT WITH PULLROPE, AS SHOWN HEREON, SHALL BE FURNISHED
AND INSTALLED BY THE CONTRACTOR. NEW ELECTROLIER, FOUNDATION, AND WIRING SHALL
BE FURNISHED AND INSTALLED BY EDISON CO. ELECTROLIERS ARE SHOWN HEREON FOR
REFERENCE ONLY.
5. ON STREETS WHERE THE SIDEWALKS ARE FIVE FEET OR LESS IN WIDTH AND ADJACENT TO
CURB, THE STREET LIGHTING CONDUIT RISERS AND THE PROPOSED ELECTROLIERS SHALL BE
PLACED AT THE BACK OF THE SIDEWALK, UNLESS OTHERWISE INDICATED ON PLAN.
COORDINATE EXACT LOCATIONS WITH EDISON CO.
6. EXACT FIELD LOCATIONS OF THE PROPOSED STREET LIGHTING RISERS SHALL
CONFORM, WHERE PERMITTED, TO THE AMERICANS WITH DISABILITIES ACT
(ADA) REOUIREMENT.
7• ALL STREET LIGHTS SHALL BE INSTALLED PER CITY OF FONTANA STREET LIGHTING x
STANDARD DRAWING 1016.
' 8• AS FUTURE NEW PRIVATE DEVELOPMENT OCCURS ALONG EITHER SIDE OF SOUTH HIGHLAND AVENUE
THE STREET LIGHTING ON EXISTING WOOD POLES SHALL BE REPLACED WITH ORNAMENTAL 'POLES
(MARBELITES) AND THE OVERHEAD WIRES SHALL BE UNDERGROUND.
REV. REVISION DESCRIPTION DATEENGR. CITY gDATESHOULD CONSTRUCTION OF THE REOUIRED
IMPROVEMENTS NOT COMMENCE WITHIN TWO
YEARS OF THE DATE OF APPROVAL SHOWN HEREON
E
DIAL Two WORKING AND CARRIED FORTH IN A DILIGENT 4 MANNER, THE
BEFORE DAYS BEFORE CITY ENGINEER MAY REOUIRE REVISIONS TO THE
YOU DIG You DIG PLANS TO BRING THEM INTO CONFORMANCE WITH
A PUBLIC SERVICE BY UNDERGRO1-800-22T-2600
ND SER ICE6ALLERT STANDARDS IN EFFECT.
SIERRA
AVENUE
CONSTRUCTION NOTES : (STREET LIGHT CONDUIT)
14 INSTALL STREET LIGHT 22,000 LUMEN PER CITY OF FONTANA STD.
PLAN NO. 1016 (BY SCE).
67 INSTALL NEW 101/2' X 17' X 12' CONCRETE VAULT FOR SCE BY CONTRACTOR
68 INSTALL CONDUIT RUN FOR SCE BY CONTRACTOR AS SHOWN BELOW
NO. OF CONDUIT
1 3 SIZE OF CONDUIT (INCHES)
PROPOSED -CONDUIT RUN FOR 210'
STREET LIGHT WITH DETAILS
AND DEPTH 36' MIN.
LENGTH OF CONDUIT RUN (FEET)
LEGEND as
5 - PROPOSED STREET LIGHT ON 30' MARBLELITE POLE AND 8' MAST ARM
(22,000 LUMEN HPSVs 200 WATTr *20)
4- Q EXISTING SAFETY LIGHTS
20 10 0 20 40 60 80 100
SCALE: r=40'
V)
z
Q
CD
_z
I-
0
I
I—
Ld
W
I—
V)
I
LLl
z
LLl
Q
a
ILLI
V /
0
I-
0
0
-I-
00
Q
V)
LL1
ZD
z
LLl
Q
0
z
Q
CD
z
0
c
v►
v,
Q
0
0
N
N
0
me
ul0
Q0
C N
4- -
"
1
"
V)
z
Q
CD
_z
I-
0
I
I—
Ld
W
I—
V)
I
LLl
z
LLl
Q
a
ILLI
V /
0
I-
0
0
-I-
00
Q
V)
LL1
ZD
z
LLl
Q
0
z
Q
CD
z
0
c
v►
v,
Q
0
0
N
N
0
me
ul0
Q0
C N
4- -